Laserfiche WebLink
McMicken Projects and Expenditures 1989 - 2019 <br />Expenditures <br />1989 51st Ave S (S 160th St to 5 166th St) $ 560,000 <br />1993 South 160th Street (42nd Ave S to 51st Ave S) 1,100,000 <br />1994 South 160th Street (51st Ave S to 53rd Ave S) 500,000 <br />1994 Slade Way Overlay and Pedestrian Path 50,000 <br />199X 53rd Ave S (Klickitat to Slade Way 450,000 <br />1994 Crystal Springs Park 450,000 <br />199X Crestview Park 650,000 <br />199X Klickitat Drive LTL and raised Pedestrian Path 150,000 <br />Project No. <br />8610301 <br />S 160th St Improvements 8610302 <br />2000 2000 Small Drainage Program - Loop Drainage - Site 1 (Outfall) 104,067 <br />2000 2000 Small Drainage Program - Loop Drainage - Site 2 (47th Ave S/ S 156th St) 142,500 <br />2001 2001 Small Drainage Program - 54th Ave S 168,572 <br />2003 2003 Small Drainage Program - Loop Drainage Phase 2 190,029 <br />2004 2004 Small Drainage Program - Loop Drainage Phase 3 136,930 <br />2007 2007 Small Drainage Program - S 162nd St 51,114 <br />2014 I-5/Klickitat Dr - Unstable Slope/Elevated Walkway (Grant funded) 286,001 91410406 <br />2016 Crystal Springs Emergency Surface Water Repair 475,924 <br />2016 S 160th St Speed Cushion Pilot Project 47,237 91610410 <br />2017 2017 Small Drainage Project - 48th Ave S 338,646 <br />2019 42nd Avenue S Phase III/Gilliam Creek Culvert Replacement Project 10,537,780 99410303 <br />Majority of 42nd Ave S Phase 111 (from SR-518 to S 160th St), no Gilliam Creek <br />Total $ 16,388,800 <br />W:\Shared Copy Only \Gait\Neighborhood Projects 1989-2019 gl 030619.a0ss <br />