Laserfiche WebLink
Allan Ekberg, Mayor <br />PAIMMINIMAI <br />Public ° „ Arks Department Henry Hash, Director <br />INFORMATION MEMORANDUM <br />TO: Transportation and Infrastructure Corromittee <br />FROM: Henry Hash, Public Works Director <br />BY: Cyndy Knighton, Senior Program Manager <br />CC: Mayor Ekberg <br />DATE: May 31, 2019 <br />SUBJECT: Resolution for Six -Year Transportation Improvement Program (2020-2025 <br />ISSUE <br />Approve a Resolution adopting the annual update of the Six -Year Transportation Improvement Program <br />for 2020-2025. <br />BACKGROUND <br />The Transportation Improvement Program (TIP) is updated annually as required by the Revised Code <br />of Washington (RCW). The TIP is adopted by resolution after a public hearing at the local agency level <br />and incorporated into regional and state TIPs. The TIP is primarily a financial planning document for <br />projects competing for grants. Any project submitted for federal grant funding must be included in the <br />local, regional, and state adopted TIPs. The TIP is a rolling plan showing various funding sources: <br />grants, developer and local funds. Projects "roll" as funds or stages occur (design report, final design <br />and construction). <br />Tukwila's TIP and Capital Improvement Program (CIP) list many of the same transportation -related <br />projects. The TIP generally lists only those transportation -related projects planned within the next six <br />years that are deemed regionally significant or that have grant funding awarded or expected. The TIP is <br />scheduled for adoption on June 17, 2019. <br />ANALYSIS <br />The attached spreadsheet is the "Draft" 2020 - 2025 TIP and was created by modifying the 2019 - 2024 <br />TIP to add or remove projects and adjust project costs. No prioritization was assigned and the list of <br />projects is presented in alphabetical order. Prioritization of projects is reflected in the current CIP. No <br />new projects were added, and 5 projects were removed because they have either been completed or <br />moved beyond the 6-year time frame of the TIP. One project was combined into a larger project: West <br />Valley Highway/Longacres Way Shared Use Pathways has been merged into the larger West Valley <br />Highway project. <br />Deleted: Completed: 40-42nd Avenue S Phase III and 53rd Avenue S. Moved to Beyond: TUC/TOD <br />Pedestrian Improvements; Tukwila Int'I Blvd Retrofit; and Multipurpose Trails. <br />FINANCIAL IMPACT <br />None. <br />RECOMMENDATION <br />Council is being asked to approve the Resolution for the 2020 - 2025 Six -Year Transportation <br />Improvement Program and consider this item at the June 10, 2018 Committee of the Whole with a Public <br />Hearing and subsequent June 17, 2019Regular Meeting. <br />ATTACHMENTS <br />• Draft Resolution <br />• Draft 2020-2025 TIP Summary <br />• 2020 — 2025 "Draft" Transportation Improvement Program <br />• Current Adopted 2019 — 2024 TIP <br />W:\PW Eng\PROJECTS \A- RW & RS Projects \TIP\Info Memo TIP 2020 docx <br />25 <br />