Laserfiche WebLink
tat <br />Agency: Tukwila <br />County: King <br />MPOIRTPO: PSRC <br />Y Inside <br />Six Year Transportation Improvement Program <br />From 2020 to 2025 <br />N Outside <br />Functional <br />Class <br />Priority Number <br />A. PINIProject No. B. STIP ID <br />C. Project Title <br />D. Road Name or Number <br />E. Begin & End Termini <br />F. Project Description G. Structure ID <br />m <br />Adopted <br />Amendment <br />Resolution No. <br />Improvement Type <br />Utility Codes <br />Total Length <br />Environmental Type <br />RW Required <br />14 <br />/ 1380(004) TUK-61 <br />Boeing Access Road over Airport Way Seismic Retrofit <br />S Boeing Access Road over Airport Way S <br />Airport Way S to Airport Way S <br />Install seismic protection on the structure. <br />06/10/19 <br />06/17/19 <br />06 <br />0.050 <br />CE <br />No <br />Funding <br />Status <br />Phase <br />Phase Start Year (YYYY) <br />Federal Fund Code <br />Federal Funds <br />State Fund Code <br />State Funds <br />Local Funds <br />Total Funds <br />S <br />CN <br />2020 <br />STP(BR) <br />2,613,855 <br />0 <br />0 <br />2,613,855 <br />Totals <br />2,613,855 <br />0 <br />0 <br />2,613,855 <br />Expenditure Schedule <br />Phase <br />1st <br />2nd <br />3rd <br />4th <br />5th & 6th <br />CN <br />2,614,000 <br />0 <br />0 <br />0 <br />i <br />0 <br />Totals <br />2,614,000 <br />0 <br />0 <br />0 <br />0 <br />Report Date: May 22, 2019 <br />Page 8 <br />