Laserfiche WebLink
tat <br />Agency: Tukwila <br />County: King <br />MPOIRTPO: PSRC <br />Y Inside <br />Six Year Transportation Improvement Program <br />From 2020 to 2025 <br />N Outside <br />Functional <br />Class <br />Priority Number <br />A. PINIProject No. B. STIP ID <br />C. Project Title <br />D. Road Name or Number \ <br />E. Begin &End Termini \ <br />F. Project Description \ ture ID <br />m <br />to <br />Adopted <br />Amendment <br />Resolution No. <br />Improvement Type <br />Utility Codes <br />Total Length <br />Environmental Type <br />RW Required <br />17 <br />\\\ \ <br />Macadam Rd S Complete Streets Project <br />0 <br />Macadam Road \\\\\\ <br />S 150th Street to S 144th Street . .. <br />Design and construction of a complete street on Macadam Road. Road widening <br />and rechannelization to add 5-foot bike lanes and 5-foot sidewalks on both sides of <br />the roadway. Includes illumination, curb, and storm drainage. s\\ <br />06/10/19 <br />06/17/19 <br />04 <br />0.350 <br />DCE <br />No <br />Funding\, o\\� \\\\\\\o• \ <br />Status <br />Phase <br />Phase Start Year (YYYY) <br />Federal Fund Code <br />Federal F( I '-- <br />*\ote Fun \ de <br />State Funds <br />Local Funds <br />Total Funds <br />P <br />PE <br />2022 <br />0 <br />��,, o <br />P e'l-gram <br />�\\\\\\\\ 397,000 <br />0 <br />397,000 <br />P <br />RW <br />2022 <br />0 <br />Ped/ rogram 4 <br />I 100,000 <br />��\\\ <br />0 <br />100,000 <br />P <br />CN <br />2023 <br />0 <br />Ped/ rogram ' <br />\\- 273,000 <br />460,000 <br />2,733,000 <br />Totals <br />0 <br />0,000 <br />460,000 <br />3,230,000 <br />Expenditure Schedule <br />\\\ <br />Phase <br />1st <br />2nd <br />3rd <br />4th <br />5th & 6th \ <br />PE <br />0 <br />0 <br />397,000 <br />0 <br />RW <br />0 <br />0 <br />100,000 <br />0 <br />\ \ 0 <br />CN <br />0 <br />0 <br />0 <br />2,733,000 <br />\\- 0 <br />Totals <br />0 <br />0 <br />497,000 <br />2,733,000 <br />0 <br />Report Date: May 22, 2019 <br />Page 10 <br />