Laserfiche WebLink
tat <br />Agency: Tukwila <br />County: King <br />MPOIRTPO: PSRC <br />Six Year Transportation Improvement Program <br />From 2019 to 2024 <br />N Outside <br />Functional <br />Class <br />Priority Number <br />\\\ <br />A. PINIProject No. B. STIP ID <br />C. Project Title <br />D. Road Name or Number <br />E. Begin & End Termini \ <br />F. Project Description \ \ mature ID <br />= <br />0 <br />Adopted <br />Amendment <br />Resolution No. <br />Improvement Type <br />Utility Codes <br />Total Length <br />Environmental Type <br />RW Required <br />17\ <br />\,117 <br />Boeing Access Road over Airport Way Bridge Seismic Retrofit <br />Boeing Access Road <br />to \ \ <br />Provide seismic modifications to the Boeing Access Road over Airport Way Bridge to <br />allow it to withstand earthquake forces. <br />06/25/18 <br />07/02/18 <br />1938 <br />47 <br />0.100 <br />No <br />Funding \ . \\ <br />Status <br />Phase <br />Phase Start Year (YYYY) <br />Federal Fund Code <br />FederaiPunds "' <br />o4,und Cod <br />State Funds <br />Local Funds <br />Total Funds <br />S <br />PE <br />2019 <br />BR <br />bb0 .. <br />\ <br />0 <br />0 <br />370,000 <br />S <br />CN <br />2019 <br />BR <br />2,611,000 <br />\\ <br />0 <br />0 <br />2,611,000 <br />Totals <br />2,981,000 <br />\\\\\\ <br />0 <br />0 <br />2,981,000 <br />Expenditure Schedule <br />\ \ <br />\,\\\\ <br />\\ <br />Phase <br />1st <br />2nd <br />3rd <br />4th \� <br />5th & 6t1 <br />PE <br />370,000 <br />0 <br />0\ <br />0 <br />CN <br />0 <br />2,611,000 <br />0 <br />\_ <br />0 <br />, <br />Totals <br />370,000 <br />2,611,000 <br />0 <br />\\ <br />\ 0 <br />Report Date: May 21, 2019 <br />Page 10 <br />