Laserfiche WebLink
tat <br />Agency: Tukwila <br />County: King <br />MPOIRTPO: PSRC <br />Six Year Transportation Improvement Program <br />From 2019 to 2024 <br />N Outside <br />Functional <br />Class <br />Priority Number <br />A. PINIProject No. B. STIP ID <br />C. Project Title <br />D. Road Name or Number <br />E. Begin & End Termini <br />F. Project Description \ mature ID <br />= <br />0 <br />Adopted <br />Amendment <br />Resolution No. <br />Improvement Type <br />Utility Codes <br />Total Length <br />Environmental Type <br />RW Required <br />17 <br />N\ \ \4 10 <br />Macadam Rd S Complete Streets Project <br />Macadam Road \\\\\ <br />S 150th Street to S 144th Street '' \ \\ <br />Design and construction of a complete street on Macadam Road. Road widening A\\\\\ <br />and rechannelization to add 5-foot bike lanes and 5-foot sidewalks on both sides of <br />the roadway. Includes illumination, curb, and storm drainage. <br />06/25/18 <br />07/02/18 <br />1938 <br />04 <br />0.350 <br />DCE <br />No <br />Funding \ <br />Status <br />Phase <br />Phase Start Year (YYYY) <br />Federal Fund Code <br />Federal Fund\W <br />St a oc <br />State Funds <br />Local Funds <br />Total Funds <br />P <br />PE <br />2019 <br />' 0 <br />Ped ��e��,N,�- --,..� � <br />\�\\\\\\\O 397,369 <br />0 <br />397,369 <br />P <br />RW <br />2019 <br />0 <br />Ped, Program <br />\\ 100,000 <br />0 <br />100,000 <br />P <br />CN <br />2020 <br />0 <br />PeWie Program j <br />�' \\\272,947 <br />460,000 <br />2,732,947 <br />Totals <br />0 <br />\\ <br />\\\\\\\ 0 316 <br />460,000 <br />3,230,316 <br />Expenditure Schedule <br />\\\ <br />Phase <br />1st <br />2nd <br />3rd <br />4th \\\ <br />h & 6th <br />JJtN- <br />PE <br />397,369 <br />0 <br />0 <br />\0 <br />\ <br />0 <br />RW <br />100,000 <br />0 <br />0 <br />\ <br />0 <br />CN <br />0 <br />2,732,947 <br />0 <br />0 <br />\, <br />Totals <br />497,369 <br />2,732,947 <br />0 <br />0 <br />\ 0 <br />Report Date: May 21, 2019 <br />Page 12 <br />