City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2019-06-04 Item 2D - Resolution - 2020-2025 Transportation Improvement Program
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2019-06-04 Transportation and Infrastructure
>
TIC 2019-06-04 Item 2D - Resolution - 2020-2025 Transportation Improvement Program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:30:18 PM
Creation date
5/31/2019 9:37:01 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
06/04/19
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
tat <br />Agency: Tukwila <br />County: King <br />MPOIRTPO: PSRC <br />Y Inside <br />Six Year Transportation Improvement Program <br />From 2020 to 2025 <br />N Outside <br />Functional <br />Class <br />Priority Number <br />A. PINIProject No. B. STIP ID <br />C. Project Title <br />D. Road Name or Number <br />E. Begin & End Termini <br />F. Project Description G. Structure ID <br />m <br />Adopted <br />Amendment <br />Resolution No. <br />Improvement Type <br />Utility Codes <br />Total Length <br />Environmental Type <br />RW Required <br />17 <br />TUK-62 <br />42nd Ave S Bridge Replacement <br />42nd Ave S over he Duwamish River at the intersection with Interurban Ave S <br />Interurban Ave S to Northern end of bridge <br />Replace the existing 42nd Ave S steel truss bridge. The replacement would require <br />preliminary engineer design, right-of-way, and construction phases. The new <br />structure would meet current road and bridge design standards. The replacement <br />structure configuration would be two through lanes, possibly a turn pocket, and <br />include sidewalks. <br />06/10/19 <br />06/17/19 <br />11 <br />0.100 <br />DCE <br />Yes <br />Funding <br />Status <br />Phase <br />Phase Start Year (YYYY) <br />Federal Fund Code <br />Federal Funds <br />State Fund Code <br />State Funds <br />Local Funds <br />Total Funds <br />P <br />PE <br />2020 <br />BR <br />1,280,000 <br />0 <br />320,000 <br />1,600,000 <br />P <br />RW <br />2021 <br />BR <br />800,000 <br />0 <br />450,000 <br />1,250,000 <br />P <br />CN <br />2022 <br />BR <br />9,920,000 <br />0 <br />2,980,000 <br />12,900,000 <br />Totals <br />12,000,000 <br />0 <br />3,750,000 <br />15,750,000 <br />Expenditure Schedule <br />Phase <br />1st <br />2nd <br />3rd <br />4th <br />5th & 6th <br />PE <br />1,600,000 <br />250,000 <br />250,000 <br />250,000 <br />0 <br />RW <br />0 <br />1,000,000 <br />0 <br />0 <br />0 <br />CN <br />0 <br />0 <br />6,250,000 <br />6,150,000 <br />0 <br />Totals <br />1,600,000 <br />1,250,000 <br />6,500,000 <br />6,400,000 <br />0 <br />Report Date: May 22, 2019 <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.