City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
COW 2019-06-24 Item 4D - Discussion - BNSF Intermodal Facility Access Study
COT-City
>
City Clerk
>
Council Agenda Packets
>
2019 Council Agenda Packets
>
2019-06-24 Committee of the Whole
>
COW 2019-06-24 Item 4D - Discussion - BNSF Intermodal Facility Access Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2024 12:47:12 PM
Creation date
6/20/2019 3:27:52 PM
Metadata
Fields
Template:
Council Agenda Packets
Agenda Packets Date (mm/dd/yy)
6/24/2019
Meeting Type
Committee of the Whole Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
Informational Memo <br />Page 2 <br />Next Steps <br />- Finalize the Preferred Alternative and seek Council direction <br />- Identify the funding source and prepare a supplement to David Evans consultant contract to update the cost <br />estimates and finalize the report documents from draft format <br />- Identify and provide funding for preliminary engineering and design of preferred alternative <br />- Continue public outreach and SEPA process <br />FINANCIAL IMPACT <br />Staff estimates that the supplemental costs to update the David Evans contract for the cost estimate revisions and finalizing <br />the report will be approximately $15,000. <br />Project costs for the preferred alternative, 48th Ave S Bridge, are unknown until preliminary engineering is underway. Best <br />available estimates developed in 2017 were approximately $20 million (in 2019, the estimate could be as high as $34 <br />million). In general, there are not many outside funding sources (i.e. federal, state funding) for new bridges such as the <br />potential 48th Ave S Bridge Project. <br />RECOMMENDATION <br />Discussion only. <br />On June 18, 2019 the Transportation & Infrastructure Committee discussed this issue and unanimously agreed on a <br />recommendation for staff to contract with David Evans & Associates to update the construction estimates and finalize the <br />study in order for the City Council to make a decision on the preferred alternative. The Committee requested that the full <br />Council be briefed and given the opportunity to provide direction on next steps. <br />If the Council gives direction on June 24th to pursue completion of the study, estimated to cost up to $15,000, it will not <br />require an additional contract approval as it will be under the Mayor's signing authority per the City's contract policy. <br />ATTACHMENTS <br />• Draft BNSF Intermodal Facility Access Study - Draft Alternative Screening Analysis (full draft) <br />• Draft BNSF Intermodal Facility Access Study — Preferred Alternative Outreach Summary <br />58 <br />CAUserslaurel-h\ AppData\LocaNVIicrosoft\Windows\INetCache\Content.OutlookW75NL7R5UnfoMemoBNSFuPdateHP_LH.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.