Laserfiche WebLink
Foster Projects and Expenditures 1989 - 2019 <br />Expenditures Project No. <br />Tukwila Pool CIP (grant funded) $ 1,721,542.69 112630001 <br />1998? 42nd Ave S Phase II (S 144th St to S 139th St) 1,850,000.00 <br />2002 2002 Small Drainage Program - Site 4 - Macadam Road South 13,400.00 <br />2003 2003 Small Drainage Program - Site 3 - 45th Place S. 80,101.25 <br />2003-2011 Tukwila International Blvd Phase II 9,059,720.19 99510403 <br />2004 2004 Small Drainage Program - Site 5 29,267.50 <br />2005 2005 Small Drainage Program - Site 2 - 43rd Ave S/S 140th St/45th Ave S 98,750.00 <br />2014-2019 S 144th St Phase II (Military to TIB) 2,972,750.58 99510301 <br />2018 TIB Channelization Study 42,002.22 81710404 <br />2019 S 140th St Intersection Improvements 263,859.10 91610405 <br />Total $ 16,131,393.53 <br />W:\Shared Copy Only\Gail\Neighborhood Projects 1989-2019 gl 030619.x1sx <br />