City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2019-09-04 Item 2B - Final Acceptance - South 141st Street Rectangular Rapid Flashing Beacon Pedestrian Crossings with Westwater Construction
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2019-09-04 Transportation and Infrastructure
>
TIC 2019-09-04 Item 2B - Final Acceptance - South 141st Street Rectangular Rapid Flashing Beacon Pedestrian Crossings with Westwater Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:30:21 PM
Creation date
8/28/2019 3:26:06 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
09/04/19
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Allan Ekberg, Mayor <br />Public Works Department -- Henry Hash, Director <br />INFORMATIONAL MEMORANDUM <br />TO: Transportation and Infrastructure Committee <br />FROM: Henry Hash, Public Works Director / <br />BY: Scott Bates, Traffic Engineering Project Manager <br />CC: Mayor Ekberg <br />DATE: August 30, 2019 <br />SUBJECT: S 140th St Intersection Improvements — S 141st St RRFB Pedestrian Crossings <br />Project No. 91610405, Contract No. 19-031 <br />Project Completion and Acceptance <br />ISSUE <br />Accept contract as complete and authorize release of performance bond. <br />BACKGROUND <br />The Notice to Proceed for Contract No. 19-031 with Westwater Construction Company of Renton, <br />Washington was issued on March 18, 2019 for the S 141 st St Rectangular Rapid Flashing Beacon (RRFB) <br />Pedestrian Crossings Project. This project included the installation of two new RRFB pedestrian <br />crossings at S 141st St and Tukwila International Boulevard to improve pedestrian safety. Construction <br />included pavement repairs, installation of solar powered RRFBs, ADA ramps, along with new <br />channelization and signage. <br />ANALYSIS <br />Construction was physically completed on May 3, 2019. No change orders were executed. The <br />performance bond is being held by the City. <br />FINANCIAL IMPACT <br />The budget for the S 141st St RRFB Pedestrian Crossings Project was $255,000.00 and included a 5% <br />contingency, which was not utilized. <br />Construction Contract Amount <br />Under -runs <br />Total Amount Paid <br />$ 221,300.00 <br />(352.00) <br />$ 220.948.00 <br />RECOMMENDATION <br />Council is being asked to formally accept and authorize the release of the performance bond, subject to <br />standard claim and lien release procedures, for the S 141st St RRFB Pedestrian Crossings Project with <br />Westwater Construction in the amount of $220,948.00 and consider this item on the Consent Agenda at <br />the September 16, 2019 Regular Meeting. <br />ATTACHMENT <br />Notice of Completion Contract No. 19-031 <br />W:1PW Eng1PROJECTSIA- RW & RS Projects\S 140th St TIB Intersection Imprvmnts (91610405)1Construction\Closeout to TIC1Info memo 2019 S,140th Intersection Improvements Closeout 082419.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.