City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2019-10-08 Handouts Distributed at Meeting - Public Safety Plan: Financial Framework Summary / Lydig Construction Proposal
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2019-10-08 Transportation and Infrastructure
>
TIC 2019-10-08 Handouts Distributed at Meeting - Public Safety Plan: Financial Framework Summary / Lydig Construction Proposal
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:30:23 PM
Creation date
10/11/2019 4:05:03 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
10/08/19
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
L' I <br />• Local and State Sales Taxes <br />• Code Upgrades required / Identified by City Inspectors <br />• Removal of hazardous materials which includes but is not limited to asbestos, airborne silica, PCB's, <br />• Freon, hydraulic oil, underground storage tanks (USTs), biological waste, lead, air monitoring, dangerous <br />or hazardous waste evaluation, characterization, or disposal, regulatory notices and hazardous materials <br />surveys <br />• Removal of junk and miscellaneous items not a part of the buildings to be demolished <br />• Cut and cap, locate, make -safe, or de -energize site utilities <br />• Removal of below grade utilities <br />• Salvaging of owner materials <br />• Removal of slabs and footings (this is not scheduled for demo per plans provided) <br />• Client to provide a Good Faith Asbestos Survey prior to beginning demolition <br />• Mastic removal or floor prep. Flooring removal includes one pass with a Terminator. This typically leaves <br />the substrate in a condition suitable for following trades (if required). Some residual adhesives may <br />remain. <br />• Engineering for Demolition; engineering of shoring or bracing of existing to remain <br />• Salvage items for reuse, relocation or return salvage to owner <br />• Any demolition not clearly shown or dimensioned on the Architectural or Structural drawings <br />• As -built documents / O&M Manuals <br />Sincerely, <br />Lydig Construction, Inc. <br />Kiel Lunsford <br />Project Manager <br />Attachments: <br />1. Public Works Demolition Proposal Estimate dated 10/7/2019 <br />2. SHKS Architects Plans Dated 07/23/2019 <br />3. LPD Engineering Specification Section 31 10 00 dated 07/29/2019 <br />4. NOVO Good Faith Inspection Letter dated 07/12/2019 <br />1'Oth Avc l iik <br />
The URL can be used to link to this page
Your browser does not support the video tag.