Laserfiche WebLink
TO: <br />FROM: <br />BY: <br />CC: <br />DATE: <br />SUBJECT: <br />J <br />INFORMATION MEMORANDUM <br />Transportation and Infrastructure Committee <br />Henry Hash, Public Works Director <br />Cyndy Knighton, Senior Program Manager <br />Mayor Ekberg <br />May 29, 2020 <br />Resolution for Six -Year Transportation Improvement Program (2021 — 2026) <br />ISSUE <br />Approve a Resolution adopting the annual update of the Six -Year Transportation Improvement Program for <br />2021 —2026. <br />__y1W:(e]:0111ki131 <br />The Transportation Improvement Program (TIP) is updated annually as required by the Revised Code of <br />Washington (RCW). The TIP is adopted by Resolution after a public hearing at the local agency level and <br />incorporated into regional and state TIPS. The TIP is primarily a financial planning document for projects <br />competing for grants. Any project submitted for federal grant funding must be included in the local, regional, <br />and state adopted TIPS. The TIP is a rolling plan showing various funding sources: grants, developer, and <br />local funds. Projects "roll" as funds or stages occur (design report, final design, and construction). <br />Tukwila's TIP and Capital Improvement Program (CIP) list many of the same transportation -related projects. <br />The TIP generally lists only those transportation -related projects planned within the next six years that are <br />deemed regionally significant or that have grant funding awarded or expected. The TIP is scheduled for <br />adoption on July 6, 2020. <br />ANALYSIS <br />The attached spreadsheet is the "Draft" 2021 — 2026 TIP and was created by modifying the 2020 — 2025 TIP <br />to add or remove projects and adjust project costs. No prioritization was assigned, and the list of projects is <br />presented in alphabetical order. Prioritization of projects is reflected in the current CIP. One new project was <br />added, and two projects were removed because they have either been completed or moved beyond the six - <br />year time frame of the TIP. The South King County Regional TDM for Centers & Corridors was added to the <br />State's TIP earlier this year as required when state or federal grant monies are awarded. It is being added to <br />the City's TIP for this adoption cycle. The Boeing Access Road over Airport Way Bridge Seismic Retrofit has <br />been removed as it is expected to be completed in 2020. The Strander Boulevard/SW 27th Street Phase III <br />was included in the 2020 TIP as the TIP was adopted about the same time the City decided to cancel the <br />project, therefore it is being removed from the 2021 — 2026 TIP. <br />New: South King County Regional TDM for Centers & Corridors <br />Deleted: Completed: Boeing Access Road over Airport Way Bridge Seismic Retrofit. Moved to Beyond: <br />Strander Boulevard/SW 27th Street Phase III <br />FINANCIAL IMPACT <br />None. <br />RECOMMENDATION <br />Council is being asked to approve the Resolution for the 2021 — 2026 Six -Year Transportation Improvement <br />Program and consider this item at the June 22, 2020 Committee of the Whole with a Public Hearing and <br />subsequent July 6, 2020 Regular Meeting. <br />Attachments: Resolution <br />Draft 2021-2026 TIP Summary <br />2021 — 2026 "Draft" Transportation Improvement Program <br />Current Adopted 2020 — 2025 TIP <br />https://tukwilawa.sharepoint.com/sites/publicworks/engineering/PW Drop Box/01 TIC Agenda/Agenda Items/TIC 06-01-2020/e. 2021-2026 Six Year TIP/1. Info Memo TIP 2021 AG <br />