State Six Year Transportation Improvement Program
<br />From 2021 to 2026
<br />Agency: Tukwila
<br />County: King
<br />MPO/RTPO: `SRC Y Inside N Outside
<br />m
<br />3
<br />'<
<br />m
<br />A. PIN/Project No. B. STIP ID
<br />D
<br />o
<br />D
<br />o
<br />Er
<br />z
<br />C. Project Title
<br />=
<br />D
<br />3
<br />3
<br />2
<br />Er
<br />3
<br />D. Road Name or Number
<br />CL o
<br />a
<br />0
<br />n
<br />o
<br />m o
<br />E. Begin & End Termini
<br />-.
<br />0
<br />3
<br />m
<br />z
<br />�c
<br />a
<br />'
<br />N 'm_
<br />F. Project Description G. Structure ID
<br />to
<br />a
<br />.:_ �.
<br />P
<br />a
<br />m
<br />fD
<br />m
<br />`T
<br />m
<br />a
<br />05
<br />TUK-62
<br />06/22/20
<br />11
<br />0.100
<br />DCE
<br />Yes
<br />42nd Ave S Bridge Replacement
<br />42nd Ave S over he Duwamish River at the intersection with Interurban Ave S
<br />Interurban Ave S to Northern end of bridge
<br />Replace the existing 42nd Ave S steel truss bridge. The replacement would require
<br />preliminary engineer design, right-of-way, and construction phases. The new
<br />structure would meet current road and bridge design standards. The replacement
<br />structure configuration would be two through lanes, possibly a turn pocket, and
<br />include sidewalks.
<br />Funding
<br />Status
<br />Phase
<br />Phase Start Year (YYYY)
<br />Federal Fund Code
<br />Federal Funds
<br />State Fund Code
<br />State Funds
<br />Local Funds
<br />Total Funds
<br />S
<br />PE
<br />2021
<br />.0
<br />0
<br />500,000
<br />500,000
<br />P
<br />PE
<br />2022
<br />STP
<br />1,,500,000
<br />0
<br />234,000
<br />1,734,000
<br />P
<br />RW
<br />2023
<br />0
<br />0
<br />30,000
<br />30,000
<br />P
<br />CN
<br />2023
<br />0
<br />0
<br />250,000
<br />250,000
<br />P
<br />CN
<br />2024
<br />STP
<br />3,000,000
<br />0
<br />468,200
<br />3,468,200
<br />P
<br />CN
<br />2024
<br />BR
<br />12,500,000
<br />0
<br />2,950,800
<br />15,450,800
<br />Totals
<br />17,000,000
<br />0
<br />4,433,000
<br />21,433,000
<br />Expenditure Schedule
<br />Phase
<br />1st
<br />2nd
<br />3rd
<br />4th
<br />5th & 6th
<br />PE
<br />500,000
<br />1,734,000
<br />0
<br />0
<br />0
<br />RW
<br />0
<br />0
<br />30,000
<br />0
<br />0
<br />CN
<br />0
<br />0
<br />250,000
<br />9,460,000
<br />9,459,000
<br />Totals
<br />500,000
<br />1,734,000
<br />280,000
<br />9,460,000
<br />9,459,000
<br />Report Date: May 19, 2020 Page 1 39
<br />
|