City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2020-06-15 Item 2A - Final Acceptance - 2018 Small Drainage Program with Ceccanti Inc
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2020-06-15 Transportation and Infrastructure
>
TIC 2020-06-15 Item 2A - Final Acceptance - 2018 Small Drainage Program with Ceccanti Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:30:31 PM
Creation date
6/10/2020 3:44:06 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
06/15/20
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TO: <br />FROM <br />BY: <br />CC: <br />DATE: <br />Cijof'Tuk I wila <br />Allan Ekberg, Mayor <br />Public a, artme t - He�nry Hash, Director <br />INFORMATIONAL MEMORANDUM <br />Transportation and Infrastructure Committee <br />Henry Hash, Public Works Director <br />Mike Perfetti, Habitat Project Manager <br />Mayor Ekberg <br />June 12, 2020 <br />SUBJECT: Surface Water Fund - 2018 Annual Small Drainage Program <br />Project No. 91841201, Contract No. 18-127 <br />Project Completion and Acceptance <br />ISSUE <br />Accept construction contract as complete and authorize release of retainage. <br />BACKGROUND <br />The Small Drainage Program constructs drainage projects throughout the City that are too large for city <br />staff to complete but are smaller than a typical capital improvement project. The 2018 Annual Small <br />Drainage Program provided drainage improvements at seven locations: <br />1) Tukwila I nt'I Blvd —Pipe abandonment 5) S 180th St — Catch basin retrofit <br />2) Interurban Ave S — Catch basin retrofits 6) S 180th St Abutment Wall — Levee repair <br />3) Strander Blvd Bridge — Levee drainage repair 7) Todd Blvd — Catch basin retrofit <br />4) Gilliam Creek Flap Gate — Outfall maintenance access <br />DISCUSSION <br />The Notice to Proceed for Contract Number 18-127 with Ceccanti, Inc. of Tacoma, WA was issued on <br />September 19, 2018 and construction was physically completed on April 12, 2019. The final affidavits of <br />Wages Paid were received in April 2020. <br />FINANCIAL IMPACT <br />The 2018 construction budget was $600,000, which included a 10% contingency. King County Flood Control <br />District contributed $65,378 to the project. The original contract amount was $543,836.40, and one change <br />order was executed for $48,957.66. Retainage is being held by the City in the amount of $26,830.47. <br />Expenses <br />Construction Contract Amount (pre-tax) $520,304.00 <br />Change Order No. 1 44,061.89 <br />Unit Price Underruns (27,756.37) <br />WA State Sales Tax 26,235.42 <br />Total Contract Amount $562,844.94 <br />N*K91IT, IIT, INIkil37eVill1151111]ki1 <br />Council is being asked to formally accept the 2018 Annual Small Drainage Program with Ceccanti, Inc. in <br />the amount of $562,844.94 as complete and authorize the release of retainage subject to standard claim <br />and lien release procedures, and to consider this item on the Consent Agenda at the July 6, 2020 Regular <br />Council Meeting. <br />Attachment: DRAFT Notice of Completion, Contract #18-127 <br />https:#tukwilawa.sharepoint.com/sites/publicworks/engineering/PW Drop Box/01 TIC Agenda/Agenda Items/TIC 06-15-20202018 Small Drainage Program Closeout/Info Memo 2018 SDP closeout hk_060520.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.