Laserfiche WebLink
Base map preparation. (JAB lead) <br />City will provide adequate base map of project site and context. GIS and dwg CAD file types <br />are anticipated, as well as high quality air photo. JAB has limited hours to compile a working <br />base map for the design team. <br />Review relevant site data and request and provide input for additional information needed. <br />Review will include of aspects Tukwila Municipal Code, Comprehensive Plan land use <br />designations, Tukwila Subarea Plan, and Parks, Recreation, and Open Space Plan which are <br />relevant to the pond. <br />Review site accessibility and provide viable solutions to reduce constraints, improve access, <br />promote activation, and connect site with larger urban center area. <br />Design Team support for Task B will include: <br />Schemata will participate in a team site visit, that includes city representatives. <br />Review the current Land Use and Zoning codes, with considerations for proposed <br />updates <br />John Mason — <br />1. Research the project to identify key elements of a narrative story about Tukwila <br />Pond, and the people who live here. It is important that we design the project <br />with the people in it. <br />2. Develop an initial place -making diagram that lays out a park -user journey of the <br />site, and the surrounding community. This may include activities, landmarks and <br />key experiences that contribute to sense of place <br />Limited Preliminary water quality investigation. (BHC Lead) Review available <br />documents provided by the City to characterize the local drainage system. Perform a site <br />visit (as part of the kick-off meeting) to identify potential locations of source -control <br />measures and water quality improvements. <br />Review existing documentation of downstream water quality impacts (TMDL limits in <br />the Green River) to select appropriate water quality treatment methods. <br />Prepare brief summary memo. <br />Wetland and Ordinary High -Water Mark Reconnaissance (Watershed) <br />The Watershed Company will conduct an initial wetland and ordinary high-water mark <br />(OHWM) reconnaissance on-site. A formal wetland delineation is not included. The <br />approximate wetland and OHWM boundaries will be sketched in ArcGIS Collector and <br />the results provided to JAB for incorporation into base maps following the site visit. The <br />J.A. Brennan Associates, PLLC Tukwila Pond Master Plan <br />11 <br />