City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
CSS 2020-09-28 Item 1A - Contract - Tukwila Pond Park Master Plan with JA Brennan Associates
COT-City
>
City Clerk
>
Council Committees
>
Community Services and Safety (2020-Present)
>
Community Services and Safety Agenda Packets (2020-Present)
>
2020-09-28 Community Services and Safety
>
CSS 2020-09-28 Item 1A - Contract - Tukwila Pond Park Master Plan with JA Brennan Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2020 10:27:28 AM
Creation date
9/24/2020 11:36:19 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
09/28/20
Committee Name
Community Services and Safety 2020-Present
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Base map preparation. (JAB lead) <br />City will provide adequate base map of project site and context. GIS and dwg CAD file types <br />are anticipated, as well as high quality air photo. JAB has limited hours to compile a working <br />base map for the design team. <br />Review relevant site data and request and provide input for additional information needed. <br />Review will include of aspects Tukwila Municipal Code, Comprehensive Plan land use <br />designations, Tukwila Subarea Plan, and Parks, Recreation, and Open Space Plan which are <br />relevant to the pond. <br />Review site accessibility and provide viable solutions to reduce constraints, improve access, <br />promote activation, and connect site with larger urban center area. <br />Design Team support for Task B will include: <br />Schemata will participate in a team site visit, that includes city representatives. <br />Review the current Land Use and Zoning codes, with considerations for proposed <br />updates <br />John Mason — <br />1. Research the project to identify key elements of a narrative story about Tukwila <br />Pond, and the people who live here. It is important that we design the project <br />with the people in it. <br />2. Develop an initial place -making diagram that lays out a park -user journey of the <br />site, and the surrounding community. This may include activities, landmarks and <br />key experiences that contribute to sense of place <br />Limited Preliminary water quality investigation. (BHC Lead) Review available <br />documents provided by the City to characterize the local drainage system. Perform a site <br />visit (as part of the kick-off meeting) to identify potential locations of source -control <br />measures and water quality improvements. <br />Review existing documentation of downstream water quality impacts (TMDL limits in <br />the Green River) to select appropriate water quality treatment methods. <br />Prepare brief summary memo. <br />Wetland and Ordinary High -Water Mark Reconnaissance (Watershed) <br />The Watershed Company will conduct an initial wetland and ordinary high-water mark <br />(OHWM) reconnaissance on-site. A formal wetland delineation is not included. The <br />approximate wetland and OHWM boundaries will be sketched in ArcGIS Collector and <br />the results provided to JAB for incorporation into base maps following the site visit. The <br />J.A. Brennan Associates, PLLC Tukwila Pond Master Plan <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.