City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIS 2021-04-12 Item 2A - Update - 2021 Overlay Program: 53rd Ave S Sidewalk Addition
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure Services (2021-Present)
>
Transportation and Infrastructure Services Agenda Packets (2021-Present)
>
2021-04-12 Transportation and Infrastructure Services
>
TIS 2021-04-12 Item 2A - Update - 2021 Overlay Program: 53rd Ave S Sidewalk Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2021 11:06:17 AM
Creation date
4/9/2021 9:04:39 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
04/12/21
Committee Name
Transportation and Infrastructure Services 2021-Present
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />INFORMATIONAL MEMORANDUM <br /> Transportation and Infrastructure Services Committee <br />TO: <br />Hari Ponnekanti, Public Works Director <br />FROM: <br />Scott Bates, Project Manager <br />BY: <br />Mayor Allan Ekberg <br />CC: <br />April 9, 2021 <br />DATE: <br /> 2021 Overlay Program- 53 Ave S Sidewalk Addition <br />SUBJECT: <br />rd <br />Project No. 92110401 <br />ISSUE <br />Provide an update on the 53 Ave S traffic revision and sidewalk plan. <br />rd <br />BACKGROUND <br />In 2020, the City desired to improve pedestrian safety on the 53 Ave S between S 137 St and 52 Ave S. The existing <br />rdthnd <br />roadway was not wide enough to safely accommodate two-way traffic and pedestrians. With limited funding, the City Street <br />division was utilized to install a new at-grade pedestrian walkway on 53Ave S and revise the traffic direction to one-way <br />rd <br />northbound. At the same time, 52 Pl S was changed to one-way southbound. While pedestrian safety was greatly <br />nd <br />improved, the one-way street revision created substantial concerns with some residents. Staff was requested to look at <br />options for improvement and report back to the Transportation & Infrastructure Services Committee. <br />ANALYSIS <br />Staff,along with consultant support from KPG, have been considering multiple options to improve the current conditions. <br />With the funding restored to the 2021 Overlay Program, a raised sidewalk along 53 Ave S and S 137 St is scheduled to be <br />rdth <br />constructed in the Summer of 2021. Per the current design, the traffic on 52 Pl S would be returned to one-way northbound <br />nd <br /> <br />operation <br />Ultimately, the best solution would be to resume two-way traffic on 53 Ave S. KPG is working on a low-cost solution for <br />rd <br />restoring two-way traffic in conjunction with the sidewalks, which would widen the roadway to the west. The need to <br />coordinate with Seattle City Light for a pole relocation will likely prevent the work from being included this summer and will be <br />dependent upon funding availability. Additional options for discussion: <br />1.Option A: Add the sidewalks, keep 53 Ave S as one-way northbound, return operation on 52 Pl S to northbound <br />rdnd <br />and construct in Summer 2021. Design the 53 Ave S widening for two-way traffic and construct as soon as funding <br />rd <br />is secured. Cost estimate is under development. <br /> <br />2.Option B: Add the sidewalks, keep 53 Ave S as one-way northbound, return operation on 52 Pl S to northbound <br />rdnd <br />and construct in summer 2021. No widening pursued. <br /> <br />3.Option C: Add the sidewalks, revise 53 Ave S as one-way southbound, revert the direction on 52 Pl S to <br />rdnd <br />northbound and construct in summer 2021. This option will cost more than #2 due to relocating the current signs. <br />Additional traffic issues may appear despite traffic control efforts. <br />FISCAL IMPACT <br /> <br /> <br />Cost estimates still being developed. <br />RECOMMENDATION <br />Staff was requested to present this item for discussion to update the Council about the 53 Ave S sidewalk project progress. <br />rd <br />With recent and continued comments from the area residents, we now recommend pursuing option A, which will provide the <br />best solution for the community. <br />Attachment: Plan sheet design for 53 Ave S sidewalk <br />rd <br />1 <br />https://tukwilawa.sharepoint.com/sites/publicworks/engineering/PW Drop Box/01 TIC Agenda/2021 Agenda Items/TIC 04-12-21/a. 53rd Ave S Traffic Revisions Update/Info Memo 53rd Sidewalk <br /> Update 04092021.docx <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.