Laserfiche WebLink
Mid Pac Construction Inc. <br />Construction Contract <br />With: Kris Kelly <br />For City of Tukwila <br />Project Resurface four tennis courts <br />Subcontractor: None <br />Location: Tukwilla <br />Specifications and Conditions: Mid Pac will supply all labor and materials for the resurfacing. To include <br />Pressure washing entire surface area and cleaning out cracks, patching cracks and damaged court areas, one <br />acrylic filler coat, two coats of Novafil, one coat of Nova Combo and painting of tennis lines. <br />$36,200.00 <br />Riteway Crack Repair fabric- there are approx. 425' of cracks that should be additionally repaired with the <br />Riteway system. The cost is $8,500.00 "not included in base bid" <br />*Since the courts have lacked maintenance for quite some time — it is possible that more linear ft will become <br />apparent after the washing (pretty sure the measure is fairly accurate)- once the cleaning is done — we will <br />verify exact linear ft — and only install what the city authorizes. <br />Price below assume acceptance of resurfacing and crack repair <br />This Offer Must Be Accepted Within 30 Days <br />Owner shall pay Mid Pac Construction, for the performance of its work Forty four thousand seven <br />hundred dollars. If payment is not made to Mid Pac within 10 Calendar days from the date of <br />invoice, interest shall accrue at the rate of 1% per month from date of invoice on unpaid balances. <br />MID PAC CONSTRUCTION INC. <br />Signed Don Gerstmar Signed <br />Date 5/31/2020 Date <br />NOTE: GENERAL CONDITIONS ON REVERSE SIDE <br />17 <br />