Laserfiche WebLink
Washington stato <br />Vo 0epaAment of Transportation <br />Agency: Tukwila <br />County: King <br />MPO/RTPO: PSRC <br />Six Year Transportation Improvement Program <br />From 2022 to 2027 <br />Y Inside N Outside <br />+h��""A"r74pNRRNNNNpRMe��� "��Illlllllllllllllli�. <br />Funding <br />Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Fun and C e State Funds Local Funds <br />Total Funds <br />P PE 2027 0 100,000 <br />100,000 <br />Totals 0 100,000 <br />'All A MUM[ 1111111111111 <br />100,000 <br />m <br />a <br />O <br />R' <br />0 <br />m <br />A. PIN/Project No. B. STIP ID <br />o <br />0 <br />m <br />� <br />z <br />C. Project Title <br />m <br />m <br />m <br />c <br />D. Road Name or Number <br />m <br />o Q� <br />c <br />o <br />n <br />m <br />m <br />n <br />m 0 <br />a <br />E. Begin & End Termini <br />�. <br />z <br />I <br />a. <br />C. <br />N m <br />F. Project Description G. Structure ID <br />o <br />m <br />N <br />m0. <br />00 <br />WA05409 <br />06/14/21 <br />1/ <br />08 <br />EIS <br />No <br />BNSF Regional Center Access <br />New Facility <br />to <br />Construct a new access to the BNSF Regional Distribution Center, relocating the <br />IIIIII <br />900+ daily truck trips from residential streets in Allentown. <br />+h��""A"r74pNRRNNNNpRMe��� "��Illlllllllllllllli�. <br />Funding <br />Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Fun and C e State Funds Local Funds <br />Total Funds <br />P PE 2027 0 100,000 <br />100,000 <br />Totals 0 100,000 <br />'All A MUM[ 1111111111111 <br />100,000 <br />Report Date: May 19, 2021 Page 7 27 <br />