Laserfiche WebLink
Washington stato <br />Vo 0epaAment of Transportation <br />Agency: Tukwila <br />County: King <br />MPO/RTPO: PSRC <br />Six Year Transportation Improvement Program <br />From 2022 to 2027 <br />Y Inside N Outside <br />Funding <br />Status Phase <br />P CN <br />vIW <br />Phase Start Year (YYYY) Federal Fund Code Federal F Fund Code State Funds Local Funds <br />2024 0 200,000 <br />Totals IIIUUUUUU��JJNNa�������r 0 200,000 <br />Expenditure Schedule�I�IIVIUIIIIIIUIUR <br />Phase 1st 2nd 3rd Vii 4th 5th & 6th <br />CN 0 0 0,000 0 0 <br />Totals 0 0 0 0 <br />Total Funds <br />200,000 <br />200,000 <br />Report Date: May 19, 2021 Page 11 31 <br />m <br />a <br />O <br />R' <br />0 <br />m <br />A. PIN/Project No. B. STIP ID <br />o <br />0 <br />m <br />� <br />z <br />C. Project Title <br />m <br />m <br />m <br />c <br />D. Road Name or Number <br />m <br />o Q� <br />c <br />o <br />n <br />m <br />m <br />n <br />m 0 <br />a <br />E. Begin & End Termini <br />�. <br />z <br />I <br />a. <br />C. <br />N m <br />F. Project Description G. Structure ID <br />o <br />m <br />N <br />m0. <br />00 <br />WA -13494 <br />06/14/21 <br />1/ <br />06 <br />0.040 <br />No <br />S 119th St Pedestrian Bridge Painting <br />S 119th Street <br />I� <br />West bank Duwamish River to East bank Duwamish River <br />VIII <br />01 <br />Ongoing maintenance of the S 119th Street Pedestrian Bridge in the <br />IIIIII <br />Allentown/Duwamish neighborhoods. Painting of bridge is outstanding maintenance <br />I <br />I <br />needed. <br />llhhll <br />Funding <br />Status Phase <br />P CN <br />vIW <br />Phase Start Year (YYYY) Federal Fund Code Federal F Fund Code State Funds Local Funds <br />2024 0 200,000 <br />Totals IIIUUUUUU��JJNNa�������r 0 200,000 <br />Expenditure Schedule�I�IIVIUIIIIIIUIUR <br />Phase 1st 2nd 3rd Vii 4th 5th & 6th <br />CN 0 0 0,000 0 0 <br />Totals 0 0 0 0 <br />Total Funds <br />200,000 <br />200,000 <br />Report Date: May 19, 2021 Page 11 31 <br />