Laserfiche WebLink
Washington stato <br />Vo 0epaAment of Transportation <br />Agency: Tukwila <br />County: King <br />MPO/RTPO: PSRC <br />Six Year Transportation Improvement Program <br />From 2022 to 2027 <br />Y Inside N Outside <br />+h��""A"r74pNRRNNNNpRMe��� "��Illlllllllllllllli�. <br />Funding <br />Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Fun <br />and C e State Funds Local Funds Total Funds <br />P PE 2022 <br />TIB 50,000 50,000 100,000 <br />P CN 2023t <br />TIB 500,000 400,000 900,000 <br />JL <br />Totals <br />550,000 450,000 1,000,000 <br />m <br />a <br />O <br />R' <br />0 <br />m <br />A. PIN/Project No. B. STIP ID <br />o <br />0 <br />m <br />� <br />z <br />C. Project Title <br />m <br />m <br />m <br />c <br />D. Road Name or Number <br />m <br />o Q� <br />c <br />o <br />n <br />m <br />m <br />n <br />m 0 <br />a <br />E. Begin & End Termini <br />�. <br />z <br />I <br />a. <br />C. <br />N m <br />F. Project Description G. Structure ID <br />o <br />m <br />N <br />m0. <br />04 <br />WA -13495 <br />06/14/21 <br />1/ <br />21 <br />No <br />Southcenter Blvd/65th Avenue S Signal <br />Qu <br />IIIIIIIIIIII�i�U^ <br />Southcenter Boulevard <br />65th Avenue S to <br />VIII\\ <br />���\�n� <br />Design and construct a new traffic signal at the Southcenter Boulevard/65th Avenue <br />IIIIII <br />S intersection to improve level of service and safety. <br />+h��""A"r74pNRRNNNNpRMe��� "��Illlllllllllllllli�. <br />Funding <br />Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Fun <br />and C e State Funds Local Funds Total Funds <br />P PE 2022 <br />TIB 50,000 50,000 100,000 <br />P CN 2023t <br />TIB 500,000 400,000 900,000 <br />JL <br />Totals <br />550,000 450,000 1,000,000 <br />Expenditure Schedule <br />Phase 1st 2nd 3rd 4th 5th & 6th <br />PE 100,000 0 0 0 0 <br />CN 0 900,000 0 0 0 <br />Totals 100,000 900,000 0 0 0 <br />Report Date: May 19, 2021 Page 16 36 <br />