City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIS 2021-05-24 Item 2C - Resolution - 2022-2027 Transportation Improvement Program
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure Services (2021-Present)
>
Transportation and Infrastructure Services Agenda Packets (2021-Present)
>
2021-05-24 Transportation and Infrastructure Services
>
TIS 2021-05-24 Item 2C - Resolution - 2022-2027 Transportation Improvement Program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2021 3:05:51 PM
Creation date
5/20/2021 1:50:52 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
05/24/21
Committee Name
Transportation and Infrastructure Services 2021-Present
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Washington stato <br />Vo 0epaAment of Transportation <br />Agency: Tukwila <br />County: King <br />MPO/RTPO: PSRC <br />Six Year Transportation Improvement Program <br />From 2022 to 2027 <br />Y Inside N Outside <br />m <br />n <br />m 0 <br />N m <br />z <br />c <br />a <br />A. PIN/Project No. B. STIP ID <br />C. Project Title <br />D. Road Name or Number <br />E. Begin & End Termini <br />F. Project Description G. Structure ID <br />m <br />�. <br />o Q� <br />m <br />c <br />o <br />o <br />z <br />o <br />a <br />O <br />m <br />I <br />m <br />n <br />a. <br />N <br />0 <br />m <br />m <br />m <br />R' <br />0 <br />m <br />m <br />m0. <br />� <br />C. <br />03 <br />/0181(019) TUK-60 <br />06/14/21 <br />1/ <br />28 <br />0.170 <br />DCE <br />No <br />West Valley Highway/Longacres Way Shared Use Pathways <br />SR 181 & Longacres Way <br />West end of planned Green River Bridge to Longacres Way <br />VIII <br />01 <br />I� <br />The West Valley Highway/Longacres Way project modifies northbound <br />IIIIII <br />channelization between Strander Boulevard and S 156th Street. A 600ft section of <br />I <br />general-purpose lane will be added, north of Strander. The existing dedicated NB <br />turn lane at Longacres will change to a thru-right lane, transitioning into 2 NB thru <br />lanes on the north leg as the existing inside lane will be changed to a dedicated NB <br />left turn lane. Sidewalks will be added to the east side of the roadway where there <br />are currently none. A wider, shared -use path will replace the existing sidewalk on the <br />west side of the road between Longacres Way and the new sidewalks installed for <br />the Pedestrian -Bicycle bridge. A new two-way cycle track will be added to Longacres <br />Way from WVH to the Tukwila Station, including new street and pedestrian <br />illumination. A pedestrian signal crossing of WVH near the landing of the Ped -Bike <br />a rapid flashing beacon on Longacres at the Interurban Trail crossin ' I <br />bbridge <br />e addend �� <br />ANIFF ��Iplllllllllll��,. vllllllllllllllllii�� <br />Funding <br />Status Phase Phase Start Year (YYYY) Federal Fund Code Federal F ds State Fund Code State Funds Local Funds Total Funds <br />S CN 2022 0 TIB 100,000 40,000 140,000 <br />Totals 0 100,000 40,000 140,000 <br />Expenditure Schedule <br />Phase 1st 2nd 3rd 4th 5th & 6th <br />CN 140,000 0 0 0 0 <br />Totals 140,000 0 0 0 0 <br />Report Date: May 19, 2021 Page 18 38 <br />Federal Funds <br />State Funds <br />Local Funds <br />Total Funds <br />Grand Totals for Tukwila <br />16,350,000 <br />14,104,362 <br />18,424,000 <br />48,878,362 <br />Report Date: May 19, 2021 Page 18 38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.