Laserfiche WebLink
Washington stato <br />Vo 0epaAment of Transportation <br />Agency: Tukwila <br />County: King <br />MPO/RTPO: PSRC <br />Six Year Transportation Improvement Program <br />From 2021 to 2026 <br />Y Inside N Outside <br />Funding <br />Phase <br />1st 2nd <br />3rd 4th 5th & 6th <br />PE <br />0 270,000 <br />Status <br />Phase <br />m <br />Federal Funds <br />State Fund Code <br />State Funds <br />Local Funds <br />Total Funds <br />P <br />PE <br />2022 <br />0 <br />SRTS <br />180,000 <br />90,000 <br />270,000 <br />P <br />RW <br />2022 <br />0 <br />SRTS <br />232,000 <br />24,000 <br />a <br />O <br />P <br />CN <br />R' <br />0 <br />0 <br />m <br />1,865,000 <br />A. PIN/Project No. B. STIP ID <br />2,070,000 <br />o B <br />0 <br />- <br />0 <br />m <br />� <br />z <br />C. Project Title <br />m <br />m <br />,i <br />m <br />;0 <br />c <br />D. Road Name or Number <br />m <br />o <br />a <br />o <br />n <br />m <br />m <br />.0 <br />a <br />E. Begin & End Termini <br />�, <br />a <br />z <br />I <br />a. <br />C. <br />N m <br />F. Project Description G. Structure ID <br />o <br />m <br />N <br />m <br />19 <br />WA -11113 <br />06/22/20 <br />07/06/20 <br />1993 <br />05 <br />0.370 <br />Yes <br />46th Avenue Safe Routes to School <br />46th Avenue S <br />S 150th Street to S 144th Street <br />Design and construct curb, gutter and sidewalk on the west side of 46th Avenue S, <br />including curb bulb -out at the SE corner of 46th Avenue S/S 144th Street with raised <br />crosswalk across S 144th Street with RRFB. <br />Funding <br />Phase <br />1st 2nd <br />3rd 4th 5th & 6th <br />PE <br />0 270,000 <br />Status <br />Phase <br />Phase Start Year (YYYY) Federal Fund Code <br />Federal Funds <br />State Fund Code <br />State Funds <br />Local Funds <br />Total Funds <br />P <br />PE <br />2022 <br />0 <br />SRTS <br />180,000 <br />90,000 <br />270,000 <br />P <br />RW <br />2022 <br />0 <br />SRTS <br />232,000 <br />24,000 <br />256,000 <br />P <br />CN <br />2023 <br />0 <br />SRTS <br />1,865,000 <br />205,000 <br />2,070,000 <br />Totals <br />0 <br />2,277,000 <br />319,000 <br />2,596,000 <br />Expenditure Schedule <br />Phase <br />1st 2nd <br />3rd 4th 5th & 6th <br />PE <br />0 270,000 <br />0 0 0 <br />RW <br />0 256,000 <br />0 0 0 <br />CN <br />0 0 <br />2,070,000 0 0 <br />Totals <br />0 526,000 <br />2,070,000 0 0 <br />Report Date: May 12, 2021 Page 2 40 <br />