City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIS 2021-05-24 Item 2C - Resolution - 2022-2027 Transportation Improvement Program
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure Services (2021-Present)
>
Transportation and Infrastructure Services Agenda Packets (2021-Present)
>
2021-05-24 Transportation and Infrastructure Services
>
TIS 2021-05-24 Item 2C - Resolution - 2022-2027 Transportation Improvement Program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2021 3:05:51 PM
Creation date
5/20/2021 1:50:52 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
05/24/21
Committee Name
Transportation and Infrastructure Services 2021-Present
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Washington stato <br />Vo 0epaAment of Transportation <br />Agency: Tukwila <br />County: King <br />MPO/RTPO: PSRC <br />Six Year Transportation Improvement Program <br />From 2021 to 2026 <br />Y Inside N Outside <br />Funding <br />Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds <br />P ALL 2022 0 Ped/Bike Program 1,146,000 128,000 1,274,000 <br />Totals 0 1,146,000 128,000 1,274,000 <br />Expenditure Schedule <br />Phase 1st 2nd 3rd 4th 5th & 6th <br />ALL 74,000 1,200,000 0 0 0 <br />Totals 74,000 1,200,000 0 0 0 <br />Report Date: May 12, 2021 Page 8 46 <br />m <br />a <br />O <br />R' <br />0 <br />m <br />A. PIN/Project No. B. STIP ID <br />o B <br />- <br />0 <br />m <br />� <br />z <br />C. Project Title <br />m <br />m <br />,i <br />m <br />;0 <br />c <br />D. Road Name or Number <br />m <br />o <br />a <br />o <br />n <br />m <br />m <br />.0 <br />a <br />E. Begin & End Termini <br />�, <br />a <br />z <br />I <br />a. <br />C. <br />N m <br />F. Project Description G. Structure ID <br />o <br />m <br />N <br />m <br />00 <br />WA -11115 <br />06/22/20 <br />07/06/20 <br />1993 <br />28 <br />0.140 <br />DCE <br />No <br />Green River Trail <br />Green River Trail <br />Christensen Road to Green River <br />Replace the existing 8 -foot wide Green River Trail with 12 -foot wide concrete paved <br />trail with 2 -foot gravel shoulders, including illumination, CCTV, wayfinding, and <br />pedestrian plaza. <br />Funding <br />Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds <br />P ALL 2022 0 Ped/Bike Program 1,146,000 128,000 1,274,000 <br />Totals 0 1,146,000 128,000 1,274,000 <br />Expenditure Schedule <br />Phase 1st 2nd 3rd 4th 5th & 6th <br />ALL 74,000 1,200,000 0 0 0 <br />Totals 74,000 1,200,000 0 0 0 <br />Report Date: May 12, 2021 Page 8 46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.