Laserfiche WebLink
Washington stato <br />Vo 0epaAment of Transportation <br />Agency: Tukwila <br />County: King <br />MPO/RTPO: PSRC <br />Six Year Transportation Improvement Program <br />From 2021 to 2026 <br />Y Inside N Outside <br />Funding <br />Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds <br />P PE 2023 SRTS 400,000 0 43,000 443,000 <br />Totals 400,000 0 43,000 443,000 <br />Expenditure Schedule <br />Phase 1st 2nd 3rd 4th 5th & 6th <br />PE 0 0 443,000 0 0 <br />Totals 0 0 443,000 0 0 <br />Report Date: May 12, 2021 Page 11 49 <br />m <br />a <br />0 <br />q <br />0 <br />m <br />A. PIN/Project No. B. STIP ID <br />o B <br />- <br />0 <br />m <br />� <br />z <br />C. Project Title <br />m <br />m <br />,i <br />0 <br />;0 <br />c <br />D. Road Name or Number <br />m <br />o <br />a <br />o <br />n <br />m <br />m <br />.0 <br />a <br />E. Begin & End Termini <br />�, <br />a <br />z <br />I <br />0. <br />C. <br />N m <br />F. Project Description G. Structure ID <br />o <br />m <br />0 <br />m <br />17 <br />WA03782 <br />06/22/20 <br />07/06/20 <br />1993 <br />28 <br />0.250 <br />No <br />S 144th St Bridge Sidewalks <br />S 144th Street <br />51 st Ave S to 53rd Ave S <br />Widen existing sidewalks on bridge over 1-5 between 51st Ave S and 53rd Ave S <br />Funding <br />Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds <br />P PE 2023 SRTS 400,000 0 43,000 443,000 <br />Totals 400,000 0 43,000 443,000 <br />Expenditure Schedule <br />Phase 1st 2nd 3rd 4th 5th & 6th <br />PE 0 0 443,000 0 0 <br />Totals 0 0 443,000 0 0 <br />Report Date: May 12, 2021 Page 11 49 <br />