z <br />TO: <br />FROM: <br />City of Tu <br />Puhfi& Wor'Is 1epor!Iron <br />t <br />a,j Pio ti, y 7ngineer <br />INFORMATIONAL MEMORANDUM <br />Transportation and Infrastructure Services Committee <br />Hari Ponnekanti, Public Works Director/City Engineer <br />BY: Cyndy Knighton, Senior Program Manager <br />Scott Bates, Project Manager <br />CC: Mayor Ekberg <br />DATE: July 9, 2021 <br />SUBJECT: 2021 Overlay and Repair Program — 53rd Avenue S <br />Project No. 92110401 <br />Widening Roadway for Two-way Travel <br />IU <br />yew <br />ISSUE <br />Provide an update on the 53rd Avenue S traffic revision and sidewalk plan, including widening the road to accommodate two-way <br />travel. <br />BACKGROUND <br />In 2020, the engineer's estimate for widening 53rd Avenue S between S 137th Street and 52nd Avenue S for two-way traffic and <br />adding sidewalks was $222,250, plus construction management costs. A barrier to this project was a guy pole that needed to be <br />relocated by Seattle City Light (SCL) before widening for two-way traffic could commence. Due to these factors, this project was <br />identified as cost prohibitive, and as an alternative, the decision was made to convert the roadway to a one-way northbound <br />operation, while a new at -grade pedestrian walkway was installed. All construction was completed by City staff to reduce costs. <br />During the April 12, 2021 Transportation and Infrastructure Services Committee meeting, staff presented three options for Council <br />consideration to improve pedestrian safety and vehicular access on this section of roadway. The Committee members were <br />supportive of Option A, which included installation of raised sidewalks on the east side of the road, design for two-way traffic, and <br />construction as soon as funding became available. <br />DISCUSSION <br />One June 17, 2021, negotiation with SCL came to a resolution and they are expected to remove their guy pole by July 12, 2021, <br />allowing this project to move forward quickly. Due to this new development, the 53rd Ave S roadway widening plans were presented <br />to Miles Resources, LCC, the construction contractor awarded the 2021 Overlay and Repair Program contract by Council on June <br />7, 2021, in the amount of $1,037,358.40 plus $51,867.92 in contingency. Using existing contract prices, Miles Resources, LLC <br />estimates the road widening could be completed for approximately $50,000. Staff discussed the tremendous cost savings with <br />Administration and the decision to move forward with the additional work was made on June 21, 2021, based on the Committee <br />support from the April 12, 2021 meeting. <br />FINANCIAL IMPACT <br />Widening of 53rd Avenue S is anticipated to add approximately $50,000 to the Miles Resources, LLC contact, after adding the <br />additional work and subtracting known project under -runs. The current estimate falls within the contract contingency of $51,867.92. <br />Contract Budget <br />Miles Resources, LLC Contract $1,037,358.40 <br />Additional Work for 53rd Ave S 50,000.00 <br />Total $1,087,358.40 <br />RECOMMENDATION <br />Discussion only. <br />Overlay & Repair Budget <br />$1,100,000.00 <br />ATTACHMENTS: Traffic Flow Map of 53rd Ave S Triangle <br />53rd Ave S Widening Plan <br />2021 Overlay Program Informational Memorandum, dated April 9, 2021 <br />April 12, 2021 Transportation & Infrastructure Services Committee Meeting Minutes <br />2021 Overlay Program Informational Memorandum, dated May 21, 2021 <br />7 <br />