City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
21-141 - Washington State Department of Transportation - Maintenance Agreement: Riverton Creek Flapgate Removal Project
COT-City
>
City Clerk
>
Interlocal Agreements
>
2016-2021 Interlocal Agreements
>
21-141 - Washington State Department of Transportation - Maintenance Agreement: Riverton Creek Flapgate Removal Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2021 10:36:52 AM
Creation date
9/23/2021 10:35:56 AM
Metadata
Fields
Template:
Interlocal Agreements
Contract No (example 17-139)
21-141
Contractor (example *sabey*)
Washington State Department of Transportation
Description (example *tourism*)
Maintenance Agreement: Riverton Creek Flapgate Removal Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CONTRACTOR WORK ZONE. A MAXIMUM <br />OF 15 PARKING STALLS MAY BE <br />CLOSED WITHIN THIS ZONE. (SEE <br />GENERAL SITE LOGISTICS NOTES) <br />DUWAMISH RIVER <br />STABILIZED CONSTRUCTION ACCESS <br />ONTO TRAIL. SEE SHEET 02.1 <br />INTERMITTENT WORK ZONE. <br />PARKING STALLS MUST REMAIN <br />OPEN DURING HOURS OF <br />2A111-6PM MON.—FRI. (SEE <br />GENERAL SITE LOGISTICS NOTES) <br />BUILDING 1 <br />/ <br />/ <br />TEMPORARY STAGING AREA FOR LANDSCAPE <br />IMPROVEMENTS. INSTALL OFFRAMP SHOULDER <br />CLOSURE TRAFFIC CONTROL PER SHEET TC.1. <br />ANY REVISIONS TO THE OFFRAMP TRAFFIC <br />CONTROL MUST BE SUBMITTED BY THE <br />CONTRACTOR TO WSDOT FOR APPROVAL. <br />NTS <br />TEMPORARY STAGING AREA FOR WORK IN WETLAND\ <br />AREA. A MAXIMUM OF 15 PARKING STALLS ALONG <br />THE SOUTHWEST FACE OF BUILDING 1 MAY BE <br />CLOSED DURING THE HOURS OF 2A1A-6PM FOR A <br />TOTAL DURATION OF 15 WORKING DAYS <br />• <br />Maintenance Area <br />/ <br />/ <br />/ <br />BUILDING 2 <br />,tri <br />GREEN RIVER TRAIL <br />r® <br />R/I1RT0 <br />4, <br />CC CITE,)" <br />4 <br />SRS99 <br />Exhibit "C" Sheet 3 of 32 <br />Construction Agreement No. GCB 3352 JZ 0627 <br />SR 99 (MP 1.61 to MP 1.75) <br />Riverton Flapgate Removal <br />PUBLIC WORKS DEPT. <br />-ENG I N EERI NG -STREETS -WATER -SEWER -PAR KS -BU I LDI NG- <br />APY <br />Otak <br />11241 Will°. Road NE, Suite 200 <br />Redmond, WA 98052 <br />.5 822 4446 <br />4 <br />Exhibit A <br />GMB 1201 <br />Maintenance Agreement <br />City of Tukwila and <br />WSDOT <br />Page 1 of 1 <br />S <br />116TH <br />LEGEND, <br />PROJECT LIMITS <br />— — HAULING ACCESS ZONE <br />HAULING ROUTE <br />�/ %� TwHROUGHOUT CNFRACFOR W0RKNSTRUCTION) 0 1 (OCCUPIED <br />�/ <br />ZON77771 (RV 0C2SANC1ANEAREA <br />GENERAL SITE LOGISTICS NOTES <br />TRAFFIC CONTROL SHOWN ON SITE LOGISTICS PLANS IS CONCEPTUAL ONLY FOR THE PURPOSE OF BIDDING. CONTRACTOR SHALL SUBMIT FOR APPROVAL TO THE <br />ENGINEEFAEFF CONTROL <br />PLAN <br />INCLUDING PEDESTRIAN ACCESS THAT ADDRESSES A_L C NDRONS OF THE SITE LOGISTICS PL AND LIS EO BELOW <br />TO SPECIAL PROVISION OZ <br />A PROVIDE ACCESS (MIN_ 2D WIDTH) IN THE EV NT DFA EMERGENCY DURING C NSTRUCTION HOURS_ MAINTAIN MIN_ 20 ROAD WIDTH DURING <br />NON—CONSTRUCTIONAHOURS <br />E <br />B. MAINTAIN HARD SURFACE VEHICULAR ACCESS TO DELIVERY DOCKS AND GARBAGE DUMPS ERS AT ALL TIMES. <br />C MAINTAIN SAFE VEHICULAR AND PEDESTRIAN (CUSTOMER) ROUTES TO AND FROM PARKING AREAS AND STORE ACCESS BEYOND BARRIER AND SECURITY FENCE. <br />D. PROVIDE TEMPORARY TRAFFIC CONTROL WHEN ACCESS ROUTES ARE TEMPORARILY BLOCKED. <br />WHILE WORKING WITHIN THE INTERMITTENT CONSTRUCTION ZONE, CONTRACTOR SHALL PLAN AND SCHEDULE WORK INA MANNER THAT WILL ALLOW TWO—WAV <br />VEHICULAR ACCESS DURING THE HOURS OF IAM-6PM AND PEDESTRIAN ACCESS TO BUILDING DOORWAYS AT ALL TIMES. ALTERNATING ONE WAV TRAFFIC WITH <br />FLACCERS MAY BE ALLOWED FOR STAGING OF HEAVY EQUIPMENT F. BRIDGE AND STRUCTURAL WALL WORK IF TRAFFIC CONTROL PLAN IS APPROVED BY <br />ENGINEER <br />AND PROPERTY OWNER. NICHT WORK OR WEEKEND WORK MAY BE NECESSARY, SEE SECTION 1-5.0(2)OF THE SPECIAL PROVISIONS FOR REDUIREMENTS. <br />3. CONTRACTOR SHALL INDICATE POTENTIAL BUSINESS OPERATION IMPACTS ON THE TWO WEEK LOOK—AHEAD SCHEDULE. SEE SPECIAL PROVISION SECTION 1-08.3(20 <br />4. PLACE TEMPORARY SECURITY CHAIN LINK FENCE AROUND CONTRACTOR WORK ZONE. FENCE SHALL BE TIGHTLY SECURED WHEN CONTRACTOR IS NOT WORKING <br />ON—SITE. <br />THE CONSTRUOSON STAGING SHOWN ON <br />ESE PLANS IS <br />5 PROPOSED ALTERNATIVE STAGING. BUT THEHBASED ACCESS COMMITMENTS <br />PROPOSAL MUST CLEARLY SHOWHOWACCESS TO ADJACENT BUSINESSES IS MAINTAINED THROUGHOUT CONSTRUCTION. <br />CONSTRUCTION WILL NOT SMART UNTIL THE CONTRACTOR HAS EITHER PROVIDED THE CITY WITH WRITTEN ACCEPTANCE OF THE STAGING ON THESE PLANS OR HAS <br />SUBMITTED AN ALTERNATIVE PROPOSAL TO THE CITY AND RECEIVED WRITTEN APPROVAL OF THE PROPOSAL FROM THE CIN. <br />[CALL BEFORE YOU DIG 1—B00-424-5555 <br />RIVERTON CREEK FLAP GATE REMOVAL <br />SITE LOGISTICS PLAN <br />4t <br />w <br />32 <br />32 , <br />le no C1.2 <br />scale AS SHOWN <br />042.020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.