Laserfiche WebLink
111111111111111111111111111 1 <br />City of Tuk <br />ila <br />Public Works Department - Hari Ponnekanti, Director/City Engineer <br />INFORMATIONAL MEMORANDUM <br />Allan Ekberg, Mayor <br />TO: Finance & Governance Committee <br />FROM: Joel Bush, Chief Technology Officer and Had Ponnekanti, PW Director <br />BY: Tami Eberle -Harris, TIS Project Analyst <br />DATE: March 28, 2022 <br />SUBJECT: GIS Technician, 1 year position <br />ISSUE <br />Requesting temporary 1 -year GIS Technician to support completion of the As -built project and provide GIS <br />assistance. <br />"As -built" refers to a drawing the designer, engineer or contractor of a construction project will create after <br />successfully completing the project, that shows how the structure was built. <br />BACKGROUND <br />In 2021, Public Works approved funding from its existing departmental budget for a temporary 7 -month <br />position to begin the As -built project. The As -built project is a multi -phased project focused on bringing <br />more visibility to As-builts and assets around the city. It includes incorporating As-builts and supporting <br />documents into Laserfiche with pertinent meta data, and providing access to those documents via a map <br />viewer. Having this information available electronically on a map is useful for staff both in the office and in <br />the field, and reduces the time spent searching for files and understanding where the assets are <br />geographically located. It also gives staff the ability to compare what is currently in GIS to what information <br />is contained in the As -built, essentially providing a QC tool for existing data. The tool is currently available <br />to staff, but in the future could be public facing and support public records requests. <br />Phase I: Incorporate currently available electronic As-builts into Laserfiche and GIS map viewer <br />• Review the existing log file, identify and confirm meta -data <br />• Provide the files to City Clerk's office for importing into Laserfiche <br />• Integrate with GIS by drawing a polygon around the area and linking to Laserfiche <br />Phase 2: Organize and Incorporate paper As-builts <br />• Organize existing paper As -built records, log meta -data <br />• Prepare document for digitization by outside vendor <br />• Incorporate into Laserfiche and GIS <br />Phase 3: Develop process and procedures to continue to incorporate new As-builts into the systems as <br />they are received <br />DISCUSSION <br />In collaboration with TIS and the City Clerk's office, the temporary staff member was able to successfully <br />complete approximately 70% of Phase I - integrating a large portion of the existing electronic as-builts into <br />Laserfiche and GIS. <br />Additional resources of a GIS technician for a 1 -year term is needed to continue on all phases of the As - <br />built project. This employee would be responsible for organizing electronic files and integrating the data <br />into existing systems, providing GIS collection and review of assets as needed, and collaborating on <br />5 <br />