City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
Planning 2012-03-22 Item 4 - Osterly Park Townhomes - Attachment A - Request from Applicant
COT-City
>
City Clerk
>
Boards and Commissions
>
Planning Commission
>
Planning Commission Agenda Packets
>
2011-2019 Agenda Packets
>
2012-03-22 Planning Commission - Osterly Park Townhomes
>
Planning 2012-03-22 Item 4 - Osterly Park Townhomes - Attachment A - Request from Applicant
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2014 4:05:55 PM
Creation date
3/16/2012 1:25:27 PM
Metadata
Fields
Template:
Boards and Commissions
Date (mm/dd/yy)
03/22/12
Board or Commission Name
Planning Commission
Agenda or Minutes
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
c! <br />FEB 4 3 202 <br />To: City of Tukwila cpMMUNiTY )11112- <br />DEVELOPMEN <br />Osterly Park Townhomes permit 1-08 -076; L08 -079 was approved as 31 Units. Due to economics <br />I am requesting to build the first 8 units as phasel in the spring of 2012 and then go back and build the <br />rest of the approved subdivision, with the construction on phase 2 to start as soon as 80% of the units in <br />phase 1 are sold. Originally we had submitted to build 10 units with the complete infrastructure and <br />then finish the rest of the buildings in phases. Due to the cost of the Sewer and water mains as well as <br />the loss of rental income until the first phase is sold, that is no longer a viable option. I intend on this <br />being 1 motion with no breaks in the project. As we all are aware of, the economy has presented great <br />changes to many devoplers and I am no exception. Both of the local banks that had approved this <br />project when I started have permanatly closed their construction departments. We turned to private <br />investment to continue and they are limiting the risk. <br />Specifically the first 8 units /lots are exactly the same as in the approved subdivision. A <br />recreation space was added to meet the city phasing requirements in what will eventually be the C <br />building in phase 2. If there were no phase 2 for an unforeseen reason then this would be a permanent <br />recreation space as it meets all city requirements. Water, Sewer, and Storm drain will end at the <br />southern boundary line of the Phasing lots and will be extended at the start of phase 2 to exactly what is <br />approved on the subdivision approval. The common utility trench, including power, gas, cable, and <br />phone will be in underground conduit. The conduit will go in at the start of phase 1, units as added will <br />be hooking up to the stubs already in the ground. <br />Thank You for your consideration <br />Mike Overbeck <br />Osterly Park Townhomes <br />Attachment A 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.