Laserfiche WebLink
FIRE DEPARTMENT SPRINKLER PLAN REVIEW COMMENTS <br />Project Name: Zumiez <br />2646 Southcenter Mall <br />Permit No.: 08-S-220 <br />Date: May 22, 2008 <br />Reviewer: Al Metzler <br />Fire Protection Project Coordinator <br />(206)575-4407 <br />• Lateral sway bracing is required at a maximum spacing of 40' for all mains, cross <br />mains, and branch lines 2.5" and larger. Bracing is provided for the last length of <br />pipe but within 6' of the end of a feed or cross main. Bracing is required unless <br />all the pipe is supported by rods less than 6" or by 30 ° wrap-around U -hooks for <br />any size pipe, 9.3.5.3. <br />• Minimum clearance around pipes: 2 " for 1 "-3.5", 4" for 4" and larger, see 4 <br />exceptions, 9.3.4. <br />• Longitudinal sway bracing is a maximum of 80' for mains and cross mains and <br />within 40 ' of the end of the line, 9.3.5.4. <br />• Provide lateral and longitudinal bracing for changes in pipe direction per section <br />9.3.5.11.2 for pipe size 2 1/2 inches and larger. <br />• Restrain branch lines at the end sprinkler of each line, restrain against vertical <br />and lateral movement, 9.3.6.3. <br />• Restraints for branch lines shall be at intervals per table 9.3.6.4 and section <br />9.3.6.4, and restrain sprig ups greater than 4', 9.3.6.6. <br />• Comply with ASCE 7-02, section 9.6.2.6.2 (e). <br />• Ceilings used for flex drop attachments shall comply with ASTM C 635 and <br />ASTM C 636 per section 9.2.1.3.3.2. <br />• Where flexible sprinkler hose fittings exceed 6ft. in length and are supported by a <br />suspended ceiling, a hanger(s) attached to the structure shall be required to <br />ensure that the maximum unsupported length does not exceed 6 ft.(9.2.1.3.3.3). <br />