City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIS 2023-02-06 Item 2H - Permit - Seattle City Light Temporary Construction Permit Renewal at Public Works Fleet and Facilities Building
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure Services (2021-Present)
>
Transportation and Infrastructure Services Agenda Packets (2021-Present)
>
2023-02-06 Transportation and Infrastructure Services
>
TIS 2023-02-06 Item 2H - Permit - Seattle City Light Temporary Construction Permit Renewal at Public Works Fleet and Facilities Building
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2023 1:06:18 PM
Creation date
2/2/2023 12:31:42 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
02/06/23
Committee Name
Transportation and Infrastructure Services 2021-Present
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
23. Cancellation. This Permit may be cancelled at any time upon thirty (30) days written notice <br />by either party to the other party, mailed to the other party's last known address. Permittee will <br />only be responsible for the prorated rent costs for the time permit is in effect. <br />24, Temporary Nature of Permit. Permittee understands and agrees that Permittee's status <br />under thisPermit is only that of temporary licensee, with term permitted temporary use of the <br />Premises limited by the terms of this Permit and the City's need to use the Premises and <br />Permittee also understands and agrees that cancellation or non -renewal of this Permit for any <br />reason whatsoever shall not place any obligation on the City to provide Permittee any alternative <br />rental property or facilities. This Permit vests no permanent property rights in the Permittee and <br />cancellation or non -renewal thereof does not render Permittee a "displaced person" as defined <br />under RCW 8.26.020 or Chapter 20.84 Seattle Municipal Code. <br />25. Violation of Terms. Should the Permittee violate, breach or fail to keep or perform any <br />covenant, agreement, term. or condition of this Permit, Permittee shall forfeit any and all rights <br />herein Permitted, and the City shall have the right to immediately cancel and terminate said <br />Permit and all of the Permittee's rights hereunder without liability for loss or damage that the <br />Permittee may thereby sustain; and upon termination of this Permit, the Permittee will vacate the <br />e <br />Premises and remove its personal property therefrom. <br />26. Removal of Personal Property. Permittee shall remove all of its personal propertyy from <br />the Premises on or before the termination date of this Permit. If Permittee fails to remove such <br />personal property on or before the termination of this Permit, the same shall, at the City's option, <br />become a part of the realty and 'the property of The City of Seattle, or the City may, at its <br />election, remove the same without liability to the Permittee for loss, injury or damage thereto, <br />and the cost of such removal and restoration of said premises to their former condition shall be <br />paid by the Permittee to the City upon demand. <br />27. Survival. All of the licensing, Permitting, tax and other legal requirements or obligations <br />incurred by the Permittee hereunder shall survive the cancellation or termination date of this <br />Permit. All of the indemnification and hold harmless provisions, as well as the hazardous <br />substance covenant, of this Permit shall survive the cancellation or termination date hereof. <br />28. Assignment. This Permit is not transferable or assignable, in whole or in part, nor may any <br />portion of the rented premises be sublet, without the express written approval of the CEO and <br />General Manager of City Light, or his representative. <br />This space intentionally left blank; signature page follows. <br />Permittee Initials AE <br />79 <br />
The URL can be used to link to this page
Your browser does not support the video tag.