Laserfiche WebLink
The CONSULTANT shall provide QC reviews for all design work prior to the 100 percent <br />submittal to the CITY if requested. <br />Compile Submittals <br />The CONSULTANT shall coordinate with all subconsultants and compile the PS&E for each of <br />the PS&E tasks. <br />Comment Review Meeting <br />The CONSULTANT will attend a one (1) hour comment resolution meeting with the CITY to go <br />through the CITY's comments, and to come to a tentative agreement on them. <br />Comment Resolution <br />The CONSULTANT will provide written responses to all the CITY's review comments that are <br />provided to the CONSULTANT following the 100 percent design submittal. <br />Deliverable(s) <br />• Written responses to the CITY's 90% review comments <br />• 100% Construction Plans (PDF Copy) <br />Plans included in this submittal: <br />- All required plans <br />Subtask 2.5 Ad Ready Documents for Bidding <br />Quality Control <br />The CONSULTANT shall provide QC reviews for all design work prior to the Ad Ready <br />submittal to the CITY if requested. <br />Compile Submittals <br />The CONSULTANT shall compile the PS&E and construction schedule for Ad Ready contract <br />documents. <br />The CONSULTANT will provide project design calculations in PDF format with an <br />accompanying index/table of contents to permit ease of reference. <br />Deliverable(s) <br />• Written responses to the CITY's 100% review comments <br />• Ad Ready Construction Plans (PDF Copy) <br />Plans included in this submittal: <br />- All required plans <br />TASK 3.0 CIVIL DESIGN <br />This task involves engineering and design work for the roadway, ADA curb ramps and <br />sidewalks, water main design, drainage design, and sanitary sewer design. <br />Subtask 3.1 Roadway Design <br />The CONSULTANT shall prepare the preliminary and final layout of the roadways, driveways, <br />and access approaches for those impacted by the project. Restored pavement grades will match <br />City of Tukwila S 149th St to S 150th St Water Main Replacement <br />WSP, 202311491 <br />Tukwila, Washington <br />July 2( <br />Page 5 of 16 <br />