City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIS 2023-08-07 Item 2B - Contract - S 149th & S 150th St Watermain Replacement Design and Construction Management with WSP
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure Services (2021-Present)
>
Transportation and Infrastructure Services Agenda Packets (2021-Present)
>
2023-08-07 Transportation and Infrastructure Services
>
TIS 2023-08-07 Item 2B - Contract - S 149th & S 150th St Watermain Replacement Design and Construction Management with WSP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2023 3:27:05 PM
Creation date
8/3/2023 3:23:30 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
08/07/23
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF TUKWILA CAPITAL PROJECT SUMMARY <br />2023 to 2028 <br />PROJECT: S 149th and S 150th St Watermain Replacement Project No. 92340102 <br />DESCRIPTION: Design and Construct 1,200 LF of 12" DI watermain along S 149th St and S 150th St. <br />JUSTIFICATION: The existing watermain is reaching its useful life and does not meet Department of Health or fireflow <br />requirements. <br />STATUS: Easement acquisitions may be needed. <br />MAINT. IMPACT: Reduce need to repair leaks. <br />COMMENT: <br />FINANCIAL Through Estimated <br />(in $000's) <br />2021 2022 2023 <br />2024 <br />2025 <br />2026 <br />2027 <br />2028 <br />BEYOND TOTAL <br />EXPENSES <br />Project Location• <br />N <br />7)-1"-- <br />Design <br />250 <br />g <br />Wi,mu <br />250 <br />Land (R/W) <br />etas <br />i <br />LI1I <br />••.Y <br />0 <br />Const. Mgmt. <br />sl44slII <br />125 <br />125 <br />250 <br />Construction <br />_ _mow• <br />S tSs <br />,else. <br />lse <br />FA <br />St <br />200 <br />800 <br />�' <br />l51@O St • �! <br />1,000 <br />TOTAL EXPENSES <br />0 <br />0 <br />0 <br />575 <br />925 <br />0 <br />0 <br />0 <br />0 <br />1,500 <br />FUND SOURCES <br />Awarded Grant <br />0 <br />Proposed Grant <br />0 <br />Mitigation Actual <br />0 <br />Mitigation Expected <br />0 <br />Utility Revenue <br />0 <br />0 <br />0 <br />575 <br />925 <br />0 <br />0 <br />0 <br />1,500 <br />TOTAL SOURCES <br />0 <br />0 <br />0 <br />575 <br />925 <br />0 <br />0 <br />0 <br />0 <br />1,500 <br />2023 - 2028 Capital Improvement Program <br />Project Location• <br />N <br />7)-1"-- <br />►4 <br />g <br />Wi,mu <br />�■1� <br />etas <br />i <br />LI1I <br />••.Y <br />sl44slII <br />_ _mow• <br />S tSs <br />,else. <br />lse <br />FA <br />St <br />U— ' l <br />` i :. ��,-,�„" <br />L. <br />rrte 'GIS <br />�' <br />l51@O St • �! <br />2023 - 2028 Capital Improvement Program <br />
The URL can be used to link to this page
Your browser does not support the video tag.