City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIS 2023-08-07 Item 2B - Contract - S 149th & S 150th St Watermain Replacement Design and Construction Management with WSP
COT-City
>
City Clerk
>
City Council Committees Meetings
>
Transportation and Infrastructure Services (2021-Present)
>
Transportation and Infrastructure Services Agenda Packets (2021-Present)
>
2023-08-07 Transportation and Infrastructure Services
>
TIS 2023-08-07 Item 2B - Contract - S 149th & S 150th St Watermain Replacement Design and Construction Management with WSP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2023 3:27:05 PM
Creation date
8/3/2023 3:23:30 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
08/07/23
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTACHMENT 1- CONCEPTUAL PROJECT <br />CITY OF TUKWLA <br />S 149TH TO S 150TH WATER MAIN REPLACEMENT PROJECT <br />.. e•eU <br />MACADAM RD S <br />REPLACE 6" GI WATER <br />MAIN <br />MAIN PROJECT OBJECTIVE_ <br />OPTION 1_ REMOVE EXISTING UTILITIES AND ROUTE <br />THROUGH CHURCH PROPERTY <br />OPTION 2-. REPLACE LEAKING 6" CI WATER MAIN <br />o- MR2423Aer_' 7A_ �I' 4.1i P4927 <br />u •• <br />24833 5532532 • — <br />ORBG87�8e DR 4297R842b <br />111(1 <br />DR04028. <br />�Jrfg ere -- <br />CGLS r ■ <br />*. 7 <br />DR ?Yi'YII <br />REPLACE 6"CI WATER <br />MAIN <br />01P.i0 Ern <br />33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.