City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIS 2024-09-23 Item 2D - Contract Amendment #1 - Gilliam Creek Fish Barrier Removal and Habitat Enhancement with Otak
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure Services (2021-Present)
>
Transportation and Infrastructure Services Agenda Packets (2021-Present)
>
2024-09-23 Transportation and Infrastructure Services
>
TIS 2024-09-23 Item 2D - Contract Amendment #1 - Gilliam Creek Fish Barrier Removal and Habitat Enhancement with Otak
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2024 2:40:43 PM
Creation date
9/19/2024 2:37:50 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
09/23/24
Committee Name
Transportation and Infrastructure Services 2021-Present
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF TUKWILA CAPITAL PROJECT SUMMARY <br />PROJECT: <br />DESCRIPTION: <br />JUSTIFICATION: <br />STATUS: <br />M AI N T. IMPACT: <br />COMMENT: <br />2023 to 2028 <br />Gilliam Creek Fish Barrier Removal <br />Project No. 99830105 <br />Construct fish passage improvements at existing flap gate and restore salmonid habitat; replace flap gate <br />which may include a self-regulating tide gate or flood wall. <br />Enable fish access to lower Gilliam Creek under wider range of flow conditions; fish barrier per WDFW and <br />City; WRIA 9 salmon habitat project. <br />Analysis of lower Gilliam Creek is being conducted in 2018 to determine the best solution for fish passage <br />and to address potential flooding. <br />Likely a shift in maintenance commitments with potential elimination of flapgate maintenance. <br />In 2020, SRFB listed as Project of Concern, WRIA pulling funding from this cycle; BA Fish Barrier Board - <br />scored 63 of 94; outcomes yet to be determined; $100K allocated in CWM via WRIA 9. <br />FINANCIAL <br />(in $000's) <br />Through Estimated <br />2021 2022 2023 <br />2024 <br />2025 <br />2026 <br />2027 <br />2028 <br />BEYOND TOTAL <br />EXPENSES <br />Design <br />60 <br />150 <br />600 <br />650 <br />1,460 <br />Land (R/W) <br />0 <br />Monitoring <br />0 <br />Const. Mgmt. <br />1,000 <br />1000 <br />Construction <br />7,500 <br />7,500 <br />TOTAL EXPENSES <br />60 <br />150 <br />600 <br />650 <br />8,500 <br />- <br />- <br />0 <br />0 <br />9,960 <br />FUND SOURCES <br />Awarded Grant <br />150 <br />325 <br />375 <br />850 <br />Proposed Grant <br />275 <br />275 <br />6,800 <br />- <br />7,350 <br />Mitigation Actual <br />0 <br />Mitigation Expected <br />0 <br />Utility Revenue <br />60 <br />0 <br />0 <br />0 <br />1700 <br />- <br />- <br />0 <br />0 <br />1,760 <br />TOTAL SOURCES <br />60 <br />150 <br />600 <br />650 <br />8,500 <br />- <br />0 <br />0 <br />0 <br />9,960 <br />2023 - 2028 Capital Improvement Program <br />44 81 <br />
The URL can be used to link to this page
Your browser does not support the video tag.