Laserfiche WebLink
CITY OF TUKWILA - DEPARTMENT OF PUBLIC WORKS <br />Opening 5/16/2023 <br />I No. I Section No. Iltero <br />I Quantity I <br />Unit <br />SCHEDULE A <br />ROADWAY <br />Al <br />1-04 <br />Unexpected Site Changes <br />A2 <br />1-05 <br />ADA Feature Surveying <br />A3 <br />1-05 <br />Construction Surveying <br />A4 <br />1-05 <br />Record Drawings (Minimum Bid $1,000) <br />AS <br />1-07 <br />Employee Apprenticeship Program (EAP) Utilization Plan <br />A6 <br />1-07 <br />Apprenticeship Hours <br />180 <br />A7 <br />1-07 <br />Apprenticeship Utilization Goal Assessment <br />A8 <br />1-09 <br />Mobilization <br />A9 <br />1-10 <br />Project Temporary Traffic Control <br />410 <br />1-10 <br />Work Zone Safety Contingency <br />All <br />2-01 <br />Clearing and Grubbing <br />Al2 <br />2-02 <br />Removal of Structures and Obstructions <br />A13 <br />4-04 <br />Crushed Surfacing Top Course <br />30 <br />A14 <br />5-04 <br />HMA Cl. 12" PG 58H-22 <br />45 <br />A15 <br />7-05 <br />Adjust Catch Basin <br />A16 <br />8-01 <br />Erosion Control and Water Pollution Prevention <br />All <br />8-02 <br />Landscape Restoration <br />A18 <br />8-04 <br />Cement Conc. Traffic Curb and Gutter <br />110 <br />A19 <br />8-09 <br />Raised Pavement Marker Type 1 <br />5 <br />A20 <br />8-09 <br />Raised Pavement Marker Type 2 <br />A21 <br />8-14 <br />Cement Conc. Sidewalk <br />60 <br />A22 <br />8-14 <br />Cement Conc. Curb Ramp Type Parallel A <br />A23 <br />8-14 <br />Cement Conc. Curb Ramp Type Perpendicular A <br />2 <br />A24 <br />8-20 <br />Traffic Signal System at 65th Ave S & South center Blvd, Complete <br />A25 <br />8-21 <br />Temporary and Permanent Signing <br />A26 <br />8-22 <br />Plastic Stop Line <br />100 <br />A27 <br />8-22 <br />Plastic Crosswalk Line <br />380 <br />A28 <br />8-22 <br />Plastic Traffic Arrow <br />6 <br />FA <br />LS <br />LS <br />LS <br />LS <br />HR <br />CALC <br />LS <br />LS <br />FA <br />LS <br />LS <br />TN <br />TN <br />EA <br />LS <br />FA <br />LF <br />HUND <br />HUND <br />SY <br />EA <br />EA <br />LS <br />LS <br />LF <br />SF <br />EA <br />Item No. Section Description <br />Quantitiy I <br />Unit <br />SCHEDULE B <br />131 <br />1-04 <br />Unexpected Site Changes <br />B2 <br />1-05 <br />Construction Surveying <br />B3 <br />1-05 <br />SPCC Plan <br />B4 <br />1-09 <br />Mobilization <br />B5 <br />1-10 <br />Project Temporary Traffic Control <br />B6 <br />1-10 <br />Removal of Structures and Obstruction <br />87 <br />2-01 <br />Roadway Excavation Incl. Haul <br />B8 <br />2-02 <br />Crushed Surfacing Top Course <br />B9 <br />4-04 <br />HMA Cl. 1/2" PG 58h-22 <br />2 <br />810 <br />4-04 <br />Cement Concrete Pavement <br />45 <br />1311 <br />5-04 <br />Modify Existing Storm Drainage System <br />5 <br />B12 <br />6-02 <br />Erosion Control and Water Pollution Prevention <br />66 <br />B13 <br />6-10 <br />Inlet Protection <br />40 <br />B14 <br />6-11 <br />Property Restoration <br />12 <br />B15 <br />6-11 <br />Cement Conc. Traffic Curb and Gutter <br />18 <br />B16 <br />6-11 <br />Cement Conc. Traffic Curb <br />2720 <br />1317 <br />8-01 <br />Cement Conc. Driveway Entrance <br />B18 <br />8-02 <br />RPM, Type 1 <br />B19 <br />8-04 <br />RPM, Type 2 <br />40 <br />B20 <br />8-12 <br />Cement Conc. Sidewalk <br />60 <br />B21 <br />8-12 <br />Solar Powered RRFB System, Complete <br />B22 <br />8-14 <br />Permanent Signing <br />17 <br />B23 <br />8-19 <br />Plastic Crosswalk Line <br />3 <br />B24 <br />8-20 <br />Plastic Yield Line Symbol <br />B25 <br />8-21 <br />Bollards <br />FA <br />LS <br />LS <br />LS <br />LS <br />LS <br />CY <br />TN <br />TN <br />CY <br />LS <br />FA <br />EA <br />FA <br />LF <br />LF <br />SY <br />EA <br />EA <br />SY <br />LS <br />LS <br />SF <br />EA <br />EA <br />Engineer's Estimate <br />Northwest Cascade Inc. <br />Road Construction Northwest, Inc. <br />TITAN Earthwork LLC <br />Unit Cost I Total Cost <br />Unit Cost I Total Cost <br />Unit Cost I Total Cost <br />Unit Cost I Total Cost <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 10,000.00 <br />$ 10,000.00 <br />$ 6,800.00 <br />$ 6,800.00 <br />$ 1,500.00 <br />$ 1,500.00 <br />$ 1,000.00 <br />$ 1,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 1,500.00 <br />$ 1,500.00 <br />$ 12,000.00 <br />$ 12,000.00 <br />$ 4,950.00 <br />$ 4,950.00 <br />$ 1,000.00 <br />$ 1,000.00 <br />$ 4,000.00 <br />$ 4,000.00 <br />$ 1,100.00 <br />$ 1,100.00 <br />$ 1,000.00 <br />$ 1,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 500.00 <br />$ 500.00 <br />$ 1,000.00 <br />$ 1,000.00 <br />$ 2,000.00 <br />$ 2,000.00 <br />$ 10.00 <br />$ 1,800.00 <br />$ 71.00 <br />$ 12,780.00 <br />$ 75.00 <br />$ 13,500.00 <br />$ 30.00 <br />$ 5,400.00 <br />$ (5.00) <br />$ (5.00) <br />$ (5.00) <br />$ (5.00) <br />$ (5.00) <br />$ (5.00) <br />$ (5.00) <br />$ (5.00) <br />$ 90,000.00 <br />$ 90,000.00 <br />$ 87,000.00 <br />$ 87,000.00 <br />$ 90,000.00 <br />$ 90,000.00 <br />$ 92,500.00 <br />$ 92,500.00 <br />$ 100,000.00 <br />$ 100,000.00 <br />$ 133,000.00 <br />$ 133,000.00 <br />$ 170,000.00 <br />$ 170,000.00 <br />$ 120,000.00 <br />$ 120,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 23,500.00 <br />$ 23,500.00 <br />$ 5,500.00 <br />$ 5,500.00 <br />$ 4,950.00 <br />$ 4,950.00 <br />$ 20,000.00 <br />$ 20,000.00 <br />$ 14,000.00 <br />$ 14,000.00 <br />$ 25,000.00 <br />$ 25,000.00 <br />$ 25,000.00 <br />$ 25,000.00 <br />$ 85.00 <br />$ 2,550.00 <br />$ 125.00 <br />$ 3,750.00 <br />$ 165.00 <br />$ 4,950.00 <br />$ 100.00 <br />$ 3,000.00 <br />$ 250.00 <br />$ 11,250.00 <br />$ 435.00 <br />$ 19,575.00 <br />$ 695.00 <br />$ 31,275.00 <br />$ 450.00 <br />$ 20,250.00 <br />$ 1,500.00 <br />$ 1,500.00 <br />$ 850.00 <br />$ 850.00 <br />$ 1,400.00 <br />$ 1,400.00 <br />$ 300.00 <br />$ 300.00 <br />$ 2,400.00 <br />$ 2,400.00 <br />$ 18,000.00 <br />$ 18,000.00 <br />$ 8,100.00 <br />$ 8,100.00 <br />$ 4,950.00 <br />$ 4,950.00 <br />$ 10,000.00 <br />$ 10,000.00 <br />$ 10,000.00 <br />$ 10,000.00 <br />$ 10,000.00 <br />$ 10,000.00 <br />$ 10,000.00 <br />$ 10,000.00 <br />$ 65.00 <br />$ 7,150.00 <br />$ 67.00 <br />$ 7,370.00 <br />$ 63.00 <br />$ 6,930.00 <br />$ 130.00 <br />$ 14,300.00 <br />$ 800.00 <br />$ 4,000.00 <br />$ 1,150.00 <br />$ 5,750.00 <br />$ 825.00 <br />$ 4,125.00 <br />$ 900.00 <br />$ 4,500.00 <br />$ 1,000.00 <br />$ 1,000.00 <br />$ 1,500.00 <br />$ 1,500.00 <br />$ 950.00 <br />$ 950.00 <br />$ 1,100.00 <br />$ 1,100.00 <br />$ 100.00 <br />$ 6,000.00 <br />$ 131.00 <br />$ 7,860.00 <br />$ 120.00 <br />$ 7,200.00 <br />$ 150.00 <br />$ 9,000.00 <br />$ 4,000.00 <br />$ 4,000.00 <br />$ 4,800.00 <br />$ 4,800.00 <br />$ 4,250.00 <br />$ 4,250.00 <br />$ 7,500.00 <br />$ 7,500.00 <br />$ 4,000.00 <br />$ 8,000.00 <br />$ 4,800.00 <br />$ 9,600.00 <br />$ 4,250.00 <br />$ 8,500.00 <br />$ 7,500.00 <br />$ 15,000.00 <br />$ 585,000.00 <br />$ 585,000.00 <br />$ 475,595.00 <br />$ 475,595.00 <br />$ 595,000.00 <br />$ 595,000.00 <br />$ 533,500.00 <br />$ 533,500.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 1,800.00 <br />$ 1,800.00 <br />$ 5,500.00 <br />$ 5,500.00 <br />$ 1,000.00 <br />$ 1,000.00 <br />$ 20.00 <br />$ 2,000.00 <br />$ 18.00 <br />$ 1,800.00 <br />$ 13.50 <br />$ 1,350.00 <br />$ 15.00 <br />$ 1,500.00 <br />$ 15.00 <br />$ 5,700.00 <br />$ 13.00 <br />$ 4,940.00 <br />$ 19.00 <br />$ 7,220.00 <br />$ 10.00 <br />$ 3,800.00 <br />$ 100.00 <br />$ 600.00 <br />$ 365.00 <br />$ 2,190.00 <br />$ 450.00 <br />$ 2,700.00 <br />$ 250.00 <br />$ 1,500.00 <br />TOTAL $ 933,945.00 <br />TOTAL $ 888,455.00 <br />TOTAL $ 1,049,045.00 <br />TOTAL $ 917,995.00 <br />Engineer's Estimate <br />Northwest Cascade Inc. <br />Road Construction Northwest, Inc. <br />TITAN Earthwork LLC <br />Unit Cost Total <br />Unit Cost Total Cost <br />Unit Cost Total Cost <br />Unit Cost Total Cost <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 2,500.00 <br />$ 2,500.00 <br />$ 2,600.00 <br />$ 2,600.00 <br />$ 500.00 <br />$ 500.00 <br />$ 2,500.00 <br />$ 2,500.00 <br />$ 1,000.00 <br />$ 1,000.00 <br />$ 2,000.00 <br />$ 2,000.00 <br />$ 1,100.00 <br />$ 1,100.00 <br />$ 1,000.00 <br />$ 1,000.00 <br />$ 12,000.00 <br />$ 12,000.00 <br />$ 24,000.00 <br />$ 24,000.00 <br />$ 19,000.00 <br />$ 19,000.00 <br />$ 27,500.00 <br />$ 27,500.00 <br />$ 12,000.00 <br />$ 12,000.00 <br />$ 47,000.00 <br />$ 47,000.00 <br />$ 28,500.00 <br />$ 28,500.00 <br />$ 40,000.00 <br />$ 40,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 2,500.00 <br />$ 2,500.00 <br />$ 1,500.00 <br />$ 1,500.00 <br />$ 2,750.00 <br />$ 2,750.00 <br />$ 4,950.00 <br />$ 4,950.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 10,000.00 <br />$ 10,000.00 <br />$ 16,000.00 <br />$ 16,000.00 <br />$ 25,000.00 <br />$ 25,000.00 <br />$ 85.00 <br />$ 170.00 <br />$ 125.00 <br />$ 250.00 <br />$ 165.00 <br />$ 330.00 <br />$ 100.00 <br />$ 200.00 <br />$ 75.00 <br />$ 3,375.00 <br />$ 125.00 <br />$ 5,625.00 <br />$ 165.00 <br />$ 7,425.00 <br />$ 100.00 <br />$ 4,500.00 <br />$ 250.00 <br />$ 1,250.00 <br />$ 435.00 <br />$ 2,175.00 <br />$ 695.00 <br />$ 3,475.00 <br />$ 450.00 <br />$ 2,250.00 <br />$ 145.00 <br />$ 9,570.00 <br />$ 125.00 <br />$ 8,250.00 <br />$ 87.00 <br />$ 5,742.00 <br />$ 175.00 <br />$ 11,550.00 <br />$ 200.00 <br />$ 8,000.00 <br />$ 88.00 <br />$ 3,520.00 <br />$ 308.00 <br />$ 12,320.00 <br />$ 200.00 <br />$ 8,000.00 <br />$ 1,100.00 <br />$ 13,200.00 <br />$ 1,360.00 <br />$ 16,320.00 <br />$ 1,232.00 <br />$ 14,784.00 <br />$ 6,000.00 <br />$ 72,000.00 <br />$ 800.00 <br />$ 14,400.00 <br />$ 965.00 <br />$ 17,370.00 <br />$ 820.00 <br />$ 14,760.00 <br />$ 1,700.00 <br />$ 30,600.00 <br />$ 2.50 <br />$ 6,800.00 <br />$ 6.50 <br />$ 17,680.00 <br />$ 7.00 <br />$ 19,040.00 <br />$ 4.00 <br />$ 10,880.00 <br />$ 1,000.00 <br />$ 1,000.00 <br />$ 12,600.00 <br />$ 12,600.00 <br />$ 2,500.00 <br />$ 2,500.00 <br />$ 4,950.00 <br />$ 4,950.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 65.00 <br />$ 2,600.00 <br />$ 80.00 <br />$ 3,200.00 <br />$ 77.00 <br />$ 3,080.00 <br />$ 130.00 <br />$ 5,200.00 <br />$ 100.00 <br />$ 6,000.00 <br />$ 128.00 <br />$ 7,680.00 <br />$ 132.00 <br />$ 7,920.00 <br />$ 100.00 <br />$ 6,000.00 <br />$ 1,000.00 <br />$ 1,000.00 <br />$ 1,850.00 <br />$ 1,850.00 <br />$ 1,925.00 <br />$ 1,925.00 <br />$ 1,500.00 <br />$ 1,500.00 <br />$ 160.00 <br />$ 2,720.00 <br />$ 212.00 <br />$ 3,604.00 <br />$ 211.00 <br />$ 3,587.00 <br />$ 500.00 <br />$ 8,500.00 <br />$ 500.00 <br />$ 1,500.00 <br />$ 2,700.00 <br />$ 8,100.00 <br />$ 2,340.00 <br />$ 7,020.00 <br />$ 1,250.00 <br />$ 3,750.00 <br />$ 3,500.00 <br />$ 3,500.00 <br />$ 15,500.00 <br />$ 15,500.00 <br />$ 8,550.00 <br />$ 8,550.00 <br />$ 4,950.00 <br />$ 4,950.00 <br />$ 1,000.00 <br />$ 1,000.00 <br />$ 4,850.00 <br />$ 4,850.00 <br />$ 825.00 <br />$ 825.00 <br />$ 100.00 <br />$ 100.00 <br />TOTAL $ 136,085.00 <br />TOTAL $ 240,674.00 <br />TOTAL $ 206,133.00 <br />TOTAL $ 300,880.00 <br />Engineer's Estimate <br />Northwest Cascade Inc. <br />Road Construction Northwest, Inc. <br />TITAN Earthwork LLC <br />$ 1,218,875.00 <br />Schedule A+B Total $ 1,070,030.00 <br />$ 1,129,129.00 <br />$ 1,255,178.00 <br />05/21/2025 <br />I ATTEST TO THE ACCURACY AND <br />INTEGRITY OF THIS DOCUMENT <br />