Laserfiche WebLink
TO READ: <br />EXHIBIT B: SCOPE OF WORK <br />TASK <br />Management <br />the work of consultants and contractors to ensure that scope of work <br />elements are carried out as described below. <br />2014 <br />The City will oversee all aspects of the Project, hire and oversee the work of <br />Remove <br />Remove five structures including a barn (2,000 Ft.2), two houses (1820 <br />Ft.2, 2,200 Ft.2), a bunk house (500 Ft.2), and an outbuilding (4,000 <br />2012- <br />consultants and contractors to ensure that scope of work elements are carried <br />2 <br />structures <br />Ft.2) located on Parcels 1023049060, 1023049055 and 1023049071 <br />2013 <br />70,000 <br />12/31/2015 <br />Plan for and <br />remove <br />contaminated <br />Remove and dispose of approximately 5,000 CY of material that will <br />require special handling and disposal. Excavate soil down to a <br />maximum of 4 feet where needed when it contains detectable levels of <br />2012- <br />2015 <br />3 <br />soils <br />PAHs below or above the threshold for a MTCA Method A cleanup. <br />2014 <br />117,000 <br />DELIVERABLES: <br />Plan for and <br />complete all <br />necessary data <br />recovery for <br />archeological <br />Data recovery plan will outline how the City of Tukwila plans to <br />investigate the site to determine if archeological resources are present, <br />and if so, their approximate location and depth. Excavate a series of <br />trenches where archeologists can observe the trench sides for <br />sedimentation layering and sieve the excavated material for artifacts. <br />This information is used by the project designers to determine if they <br />can avoid impacts to the cultural resources, and if not, will allow them <br />to determine the quantity and types of artifacts that are anticipated <br />2012- <br />• A copy of the duly executed contract agreement between the consultant <br />hired for the Project and the City <br />4 <br />artifacts <br />during excavation. Submit plan to King County as a deliverable. <br />2014 <br />298,000 <br />6/1/2014 - <br />Excavate and <br />grade site and <br />restore it into a <br />Remove approximately 55,000 CY of material from the center of the <br />site and adjacent to the Duwamish River to establish 1.3 acres of <br />shallow water mudflat and marsh habitat and 0.8 acre of restored <br />105,000 <br />12/31/2015 <br />5 <br />shallow marsh <br />riparian area. <br />2014 <br />0 <br />• Construction monitoring and data recovery if required <br />Credit the King <br />County Flood <br />Provide proper credit as provided by King County for funding this <br />project by the following needs as applicable: On -site signage, <br />consumable printed materials such as flyers, brochures, etc, press <br />releases, electronic postings such as web sites, electronic newsletters <br />2012- <br />As follows: <br />6 <br />Control District <br />and reports. <br />2014 <br />0 <br />Prepare and <br />the site to determine if archeological resources are present, and if so, their <br />9/1/2012 - <br />Investigation <br />submit Final <br />298,000 <br />December <br />7 <br />Report <br />Final report shall follow the format of Exhibit E <br />31, 2014 <br />0 <br />$500,000 <br />TO READ: <br />EXHIBIT B: SCOPE OF WORK <br />TASK <br />DESCRIPTION <br />AWARD <br />SHARE <br />COMPLE- <br />TION DATE <br />The City will oversee all aspects of the Project, hire and oversee the work of <br />consultants and contractors to ensure that scope of work elements are carried <br />9/1/2012 - <br />Project <br />out as described below <br />12/31/2015 <br />Management <br />DELIVERABLE: A record of staff time charged to the Project <br />50,000 <br />2015 <br />The Consultant contract to manage and inspect construction activities <br />DELIVERABLES: <br />• A copy of the duly executed contract agreement between the consultant <br />hired for the Project and the City <br />Construction <br />• A copy of the duly executed contract agreement between the construction <br />6/1/2014 - <br />Engineering <br />contractor and the City of Tukwila hereafter, the Contract. <br />105,000 <br />12/31/2015 <br />• Development of a cultural resources plan <br />• Construction monitoring and data recovery if required <br />As follows: <br />Data recovery plan will outline how the City of Tukwila plans to investigate <br />Cultural <br />the site to determine if archeological resources are present, and if so, their <br />9/1/2012 - <br />Investigation <br />approximate location and depth. Excavate a series of trenches where <br />298,000 <br />9/1/2015 <br />PAGE 3 OF 7 <br />