Laserfiche WebLink
C. The County -owned fiber optic cable, power and other communication conductors the County will <br />install in new conduits. <br />D. The fiber optic cable the County will install for the City's use. <br />E. The terms and conditions for the ownership and maintenance of the ITS cabinets (332 RapidRide <br />ITS cabinets, 336A RapidRide ITS cabinets) and TSP compatible traffic signal controller cabinets <br />(double door P -style cabinets) as shown in Contract No. C00759C12 plans, shown in Exhibit A, <br />that are required to operate RapidRide transit ITS elements. <br />2. City Responsibilities <br />2.1. The City shall allow the County to install new ITS cabinets, fiber vaults, junction boxes and <br />conduits within City right of way as shown in the Contract No. C00759C12 plans. <br />2.2. The City shall allow the County to install fiber optic cable, power and other communication <br />conductors in City -owned conduits as shown in the Contract No. C00759C12 plans. <br />2.3. The City shall install a TSP interface panel furnished by the County in the City's traffic signal <br />controller cabinet. The City shall permit the County or its contractor to pull and terminate <br />communication conductors from the County's RapidRide ITS cabinet to the interface panel in <br />the City's traffic signal controller cabinet at locations shown in the Contract No. C00759C12 <br />plans. <br />2.4. The City shall test, accept, and install two double door P cabinets provided by the County, at <br />Southcenter Blvd/42nd Avenue South and Strander Blvd/Andover Parkway West, within sixty <br />days of receiving them or by January 15th, 2012, whichever is later The City shall also install <br />County furnished TSP compatible traffic signal controllers at these two locations as shown in the <br />Contract No. C00759C12 plans. <br />2.5. The City shall allow the County to install a 20 amp breaker in the City's traffic signal service <br />cabinet or provide an alternate service connection for the ITS cabinet, and the City shall pay for <br />the electricity required to operate all of the equipment housed in the RapidRide ITS cabinets. <br />The City will allow the County's contractor to install all conduit and wiring needed to provide <br />power to the ITS cabinets from the service cabinets as shown in the Contract No. C00759C12 <br />plans. <br />2.6. The City shall allow the County to install the Wireless Access Point (WAP) on the City's traffic <br />signal mast arm or luminaire arm as shown in the Contract No. C00759C12 plans. The City <br />shall also permit the county to install the associated CATS cable in the City's signal/lighting pole <br />and conduit from the WAP to the RapidRide ITS cabinet. <br />2.7. The City agrees to dedicate two - strands of fiber optic cable from Andover Park W /Strander Blvd <br />to Southcenter Parkway /S 180th St for backhaul connection. <br />2.8. The City shall review, approve, and implement new transit signal priority (TSP) timing plans as <br />proposed by the County at the TSP intersections along the F Line RapidRide corridor. The City <br />reserves the right to modify signal and TSP timings if, after implementation of TSP the City <br />determines that a significant adverse effect on intersections safety or level of service has <br />occurred. <br />2.9. The City shall provide a right of way use permit for the County to work within the City's right of <br />way and grant the necessary rights for the continuing existence of the County's improvements in <br />the City's right of way in accordance with this Agreement. The right of way use permit shall <br />