City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
Planning 2013-04-25 COMPLETE AGENDA PACKET
COT-City
>
City Clerk
>
Boards and Commissions
>
Planning Commission
>
Planning Commission Agenda Packets
>
2011-2019 Agenda Packets
>
2013-04-25 Planning Commission - Sound Transit Master Sign Program / Comprehensive Plan Update
>
Planning 2013-04-25 COMPLETE AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2020 3:16:13 PM
Creation date
4/18/2013 4:14:28 PM
Metadata
Fields
Template:
Boards and Commissions
Date (mm/dd/yy)
04/25/13
Board or Commission Name
Planning Commission
Agenda or Minutes
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
24' dia. <br />la. <br />Vertical Support <br />5' schedule 4© aiuminum pipe Into <br />Base and secured with Set Sanwa <br />t S�r8ws <br />1/2 -13 x 3/4' stainless steel socket <br />set screws secured with Lock Tite, <br />—(..,C) Large Base CB -9 (see CP3.0) <br />_R Cast aluminum base with tour (4) <br />slotted holes for anchors, paint <br />Metallic Silver P8, <br />l@ Anchors <br />Four (4) 3/4' dia. x 24' min, embed <br />I.. anchor bolts set with template <br />upport <br />5' schedule 40 aluminum pipe Into <br />Bose and secured with Set Screws <br />a <br />i/2 -13 x 3;4' stainless steei socket <br />set screws secured with Lock - +.e. <br />rge doge CO-9 (see CP3:0) <br />annum base with tour (4) <br />hors, paint <br />Silver P8. <br />Anch <br />Four (4) 3/4= dia. x 9' min. embed <br />anchor belts set with template <br />C.a�r <br />'�rUsSk' <br />Vertical Section V w 1 A <br />Scato:1 1 /2° <br />Al ,j. A2.® <br />A2.1 Drl)led Foot- <br />— <br />N <br />Bober v' <br />(3) #3 troop <br />ties © 4` 4.c. <br />(6) #4 <br />vertical des <br />Vertical Section View! A1.0 & A1.1 Second Poie D Footing <br />Scale :1 1/25 =1, -( <br />24' dia. <br />January 29, 2002 <br />CArr <br />July 29; 2303 <br />Fobia ry 7, 2004 <br />A0p ;ved <br />i Apprarad elth changes neiad <br />Flan View / A1.0 Al <br />Scale :1 1l2' a j'-® <br />A2.d & A2,j 7rtlied Frio <br />DA <br />a ®�aa Arm a <br />Sign <br />Production <br />Drawings <br />A1.0, Al .1 e <br />A2.0 & <br />A2.1 <br />Drilled Foundation <br />Detail <br />
The URL can be used to link to this page
Your browser does not support the video tag.