City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
13-071 - EXHIBITS A-I - Tukwila Transit Center Design, Construction and Management
COT-City
>
City Clerk
>
Interlocal Agreements
>
2010-2015 Interlocal Agreements
>
13-071 - EXHIBITS A-I - Tukwila Transit Center Design, Construction and Management
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2013 5:00:42 PM
Creation date
4/25/2013 4:59:43 PM
Metadata
Fields
Template:
Interlocal Agreements
Contract No (example 17-139)
13-071
Contractor (example *sabey*)
King County
Description (example *tourism*)
Transit Center Construction & Maintenance
Document Relationships
13-071 - King County - Tukwila Transit Center Design, Construction and Management
(Message)
Path:
\City Clerk\Interlocal Agreements\2010-2015 Interlocal Agreements
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
564
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PART 18 - UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND COOP... Page 10 of 38 <br />cancelled checks, paid bills, payrolls, time and attendance records, contract and subgrant award <br />documents, etc. <br />(7) Cash management. Procedures for minimizing the time elapsing between the transfer of funds from <br />the U.S. Treasury and disbursement by grantees and subgrantees must be followed whenever advance <br />payment procedures are used. Grantees must establish reasonable procedures to ensure the receipt of <br />reports on subgrantees' cash balances and cash disbursements in sufficient time to enable them to prepare <br />complete and accurate cash transactions reports to the awarding agency. When advances are made by <br />letter -of- credit or electronic transfer of funds methods, the grantee must make drawdowns as close as <br />possible to the time of making disbursements. Grantees must monitor cash drawdowns by their <br />subgrantees to assure that they conform substantially to the same standards of timing and amount as apply <br />to advances to the grantees. <br />(c) An awarding agency may review the adequacy of the financial management system of any applicant for <br />financial assistance as part of a preaward review or at any time subsequent to award. <br />(d) Certain Urban Mass Transportation Administration (UMTA) grantees shall comply with the requirements of <br />section 15 of the Urban Mass Transportation (UMT) Act of 1964, as amended, as implemented by 49 CFR part <br />630, regarding a uniform system of accounts and records and a uniform reporting system for certain grantees. <br />[53 FR 8086 and 8087, Mar. 11, 1988, as amended at 53 FR 8086, Mar. 11, 1988] <br />Sec. 18.21 Payment. <br />(a) Scope. This section prescribes the basic standard and the methods under which a Federal agency will make <br />payments to grantees, and grantees will make payments to subgrantees and contractors. <br />(b) Basic standard. Methods and procedures for payment shall minimize the time elapsing between the transfer <br />of funds and disbursement by the grantee or subgrantee, in accordance with Treasury regulations at 31 CFR part <br />205. <br />(c) Advances. Grantees and subgrantees shall be paid in advance, provided they maintain or demonstrate the <br />willingness and ability to maintain procedures to minimize the time elapsing between the transfer of the funds <br />and their disbursement by the grantee or subgrantee. <br />(d) Reimbursement. Reimbursement shall be the preferred method when the requirements in paragraph (c) of <br />this section are not met. Grantees and subgrantees may also be paid by reimbursement for any construction <br />grant. Except as otherwise specified in regulation, Federal agencies shall not use the percentage of completion <br />method to pay construction grants. The grantee or subgrantee may use that method to pay its construction <br />contractor, and if it does, the awarding agency's payments to the grantee or subgrantee will be based on the <br />grantee's or subgrantee's actual rate of disbursement. <br />(e) Working capital advances. If a grantee cannot meet the criteria for advance payments described in paragraph <br />(c) of this section, and the Federal agency has determined that reimbursement is not feasible because the grantee <br />lacks sufficient working capital, the awarding agency may provide cash or a working capital advance basis. <br />Under this procedure the awarding agency shall advance cash to the grantee to cover its estimated disbursement <br />needs for an initial period generally geared to the grantee's disbursing cycle. Thereafter, the awarding agency <br />shall reimburse the grantee for its actual cash disbursements. The working capital advance method of payment <br />shall not be used by grantees or subgrantees if the reason for using such method is the unwillingness or inability <br />of the grantee to provide timely advances to the subgrantee to meet the subgrantee's actual cash disbursements. <br />(f) Effect of program income, refunds, and audit recoveries on payment. <br />http: / /www. dot .gov /ost/m60 /grant/49cfr18.htm 8/30/2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.