HomeMy WebLinkAboutCOW 2009-01-26 Item 3B - Bid Award - Precision Earthworks for Foster Golf Course Reclaimed Water Pipeline Extension for $103,385.41I CAS NUMBER 09-009
1 MTG. DATE
01/26/09
02/02/09 J
02/02/09
09 -009
EXPENDITURE REQUIRED
$103,385.41
COUNCIL A GENDA SYNOPSIS
Meeting Date
01/26/09
02/02/09 3M
Prepared by 1 Mayor's review Council review
TEM INFORMATION
ORIGIi ALAGENDADA1E: JANUARY 26, 2009
AGENDA ITEM TITLE Bid Award for Interurban Water Reuse
Foster Golf Links Reclaimed Water Pipeline Extension Project
CA'IEGORY Discussion Motion Resolution Ordinance BidAzvard Public Heanng
Mtg Date 01/26/09 Mtg Date Mtg Date Mtg Date Mtg Date 02/02/09 Mtg Date Mtg Date
SPONSOR Council Mayor Adm Svcs DCD Finance Fire Legal n P&R n Police PW
SPONSOR'S This project will allow Foster Golf Links to use King County reclaimed water for irrigation.
SIJMM RY The project was advertised on November 17 and 28, 2008 and seventeen bids were opened
on December 31, 2008. The low bid of $103,385.41 was from Precision Earthworks, Inc. of
Mukilteo, Washington, who has previously done this type of work satisfactorily for public
agencies. The Council is being asked to award the contract to Precision Earthworks, Inc.
REVIEWED BY COW Mtg. CA &P Cmte F &S Cmte
Utilities Cmte Arts Comm. Parks Comm. 1 1 Planning Comm.
DAIE: 01/13/09
RECOMMENDATIONS:
SPONSOR /ADMIN. Public Works
CONMITI iEE Unanimous Approval; Forward to Committee of the Whole
_COST= IMPACT FUND _SOURCE
AMOUNT BUDGETED APPROPRIATION REQUIRED
$110,000.00 $0.00
Fund Source: 401 WATER FUND (PAGE 90, 2009 CIP)
Comments: Construction costs will reimbursed in full by King County,
U Transportation Cmte
RECORD OF COUNCIL ACTION
MTG. _`ATTACHMENTS
01/26/09 Informational Memorandum dated 01/07/09
City Clerk Bid Opening Results
Bid Tabulation
Exhibit B from Agreement 08 -062 with King County (for reimbursement)
CIP Page 90 (2009 CIP)
Minutes from the Utilities Committee meeting of 01/13/09
ITEM No.
Other
City of Tukwila
TO: Mayor Haggerton
Utilities Committee
FROM: Public Works Directory(
INFORMATIONAL MEMORANDUM
DATE: January 7, 2009
SUBJECT: Interurban Water Reuse, Foster Golf Links Reclaimed Water Pipeline Extension
Project 92 -WTO6
Bid Award
ISSUE
Award the Foster Golf Links Reclaimed Water Pipeline Extension Project to Precision Earthworks, Inc.
Jim Haggerton, Mayor
BACKGROUND
This project will allow Foster Golf Links to use King County reclaimed water for irrigation The project was
advertised for bids on November 17 and 28, 2008 and bids were opened on December 31, 2008. Seven-
teen bids were received with the low bid of $103,385.05 from Precision Earthworks, Inc., of Mukilteo,
Washington. The low bid was in error by $0.36 and will be corrected to $103,385.41. This error does not
affect the bid results. The Engineer's Estimate was $129,258.00.
ANALYSIS
The bids were reviewed and minor mathematical errors were found. These math errors did not affect the
bidding outcome of the project. References indicate that Precision Earthworks has done this type of work
satisfactorily for public agencies.
BUDGET
BID RESULTS ESTIMATE BUDGET
Construction $103,385.41 $129,258.00 $110,000.00
Contingency (10 10,338.54 12,925.80 0.00
Total $113.723.95 $142.183.80 $110.000.00
All construction costs will be reimbursed by King County per Agreement 08 -062, which was approved by
Council on July 21, 2008. The original estimate for construction was $110,000, however, the agreement
allows for up to $129,758.00 (see attached Exhibit B). The budget difference will be covered by the Water
Fund until reimbursed in full by King County. Also attached is the 2009 CIP page 90.
RECOMMENDATION
Award the Foster Golf Link Reclaimed Water Pipeline Extension Project to Precision Earthworks, Inc. in the
amount of $103,385.41 and consider this item at the January 26, 2009 Committee of the Whole meeting
and subsequent February 2, 2009 Regular Meeting.
Attachments: City Clerk Bid Opening Results
Bid Tabulation
Exhibit B AG 08 -062
CIP Page 90
P.IPROJECTS A- WT Praect192Wr06 Fostff Go f Red azced WaiJrdot. emo bid award.da
BIDDER NAME
DATE STAMP OF RECEIPT
Nordic Construction
12/18/08 1:50 PM
A A Excavating Inc.
12/19/08 8:15 AM
Construct Co.
12/19/08 8:35 AM
Nor Tec Construction
12/19/08 8:37 AM
Lloyd Enterprises, Inc
12/19/08 8:38 AM
Swick Son Enterprises, Inc.
12/19/08 8:39 AM
Higrade Bark, Topsoil and Rock, Inc.
12/19/08 8:40 AM
Specialized Landscaping, Inc.
12/19/08 9:44 AM
Precision Earthworks
12/19/08 8:50 AM
Kar -Vel Construction
12/23/08 8:40 AM
Talakai Construction
12/23/08 1:16 PM
Dennis R. Craig Construction, Inc.
12/30/08 10:55 AM
Shinstine Assoc.
12/30/08 1:45 PM
VLS Construction Inc
12/31/08 8:33 AM
Archer Construction
12/31/08 8:44 AM
Washington Pipeline
12/31/08 8:47 AM
Reed Trucking Excavating, Inc.
12/31/08 8:47 AM
CITY OF TUKWILA
OFFICE OF THE CITY CLERK
Christy O'Flaherty, CMC, City Clerk
BID OPENING
Foster Golf Links Reclaim Water Pipeline Extension
92 -WTO6
December 31, 2008 10:00 A.M.
REVISED /CORRECTED BID TAB 01/08/09
DATED this 31 day of December, 2008.
GRAND TOTAL ADDENDUMS APPARENT
SECURITY Including Sales (4) LOWEST BIDDER
BID REC'D? Tax Acknowledged (Rank Order)
Y $248,990.90 Y 16
Y $125,241.00 Y
Y $396,736.02 Y
Y $117,611.00 Y
Y $196,309.00 Y
Y $147,150.00 Y
Y $107,787.92 Y
Y $144,161.22 Y
Y $103,385.05 Y
Y $150,638.00 Y
Y $214,730.00 Y
Y $144,583.05 Y
Y $188,837.00 Y
Y $189,189.12 Y
Y $174,059.92 Y
Y $179,839.10
Y $125,350.00
ENGINEER'$ ESTIMA
129,258.00
Y
Y
4
17
3
14
8
2
6
1
9
15
7
12
13
10
11
5
The above figures appear as written within bid documents; and as read aloud at bid opening.
THEY DO NOT however, REPRESENT ANY BID AWARD; apparent low, or otherwise.
Christy O'Flaherty, CMC, City Clerk
FOSTER GOLF COURSE RECLAIMED WATER PIPE LINE EXTENSION
BID RESULTS
PROJECT #92-WT06
MIKE CUSICK PE
12/31/2008
Exhibit B
Preliminary Cost Summary
Reclaimed Water Line Extension Project
P:IPROJECTSW- WT Projects192WTO6 Foster Golf Reclaimed WaterJnterlocal Exhibit B.doc
Description 1 Cost
Material and Labor Subtotal 91,447.00
Contingency 9,148.00
General Contractor Overhead 7,898.00
General Contractor Profit 5,528.00
General Contractor Mark -up on Subcontractors 875.00
Bond and Insurance 3,448.00
B &O Tax 545.00
Permit 2,378.00
General Conditions Allowance 8,491.00
GRAND TOTAL 129,758.00
08-062
PROJECT:
DESCRIPTION:
JUSTIFICATION:
STATUS:
MAINT. IMPACT:
COMMENT:
FINANCIAL
(in $000's)
EXPENSES
Design
Land (R/W)
Const. Mgmt.
Construction
TOTAL EXPENSES
FUND SOURCES
Awarded Grant
Proposed Grant
Mitigation Actual
Mitigation Expected
Utility Revenue
TOTAL SOURCES
Interurban Water Reuse
LINE ITEM: 401.02.594.34. .21 PROJECT NO. 92 -WTO6
Develop water reuse along the Interurban corridor with Class A treated wastewater from the Eastside
Reclamation Facility for irrigation, sewer flushing, sweeping, dust control, and other non potable uses.
Using reclaimed water is an element of the City's Water Conservation Plan as well as the Cascade Water
Transmission and Supply Plan.
King County Department of Natural Resources (KCDNR) and the City are currently completing the
assessment of crossing the river through an old 6" line in order to serve Baker Commodities.
Future maintenance and operation of the new meters, tracking and preventing cross connections.
KC Dept of Natural Resources will fund the construction portion of the installation of the reuse water line
to the Foster Golf Course pond. The City will be responsible for design and construction management.
Through Estimated
2007 2008 2009
5
13 110
13 5 110
110 110
0
0
0
13 5 0 0 0 0 0 0 0 18
13 5 110 0 0 0 0 0 0 128
Project Location
2009 2014 Capital Improvement Program
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2009 to 2014
2010 2011 2012 2013 2014 BEYOND TOTAL
5
0
0
123
0 0 0 0 0 0 128
90
UTILITIES COMMITTEE
Meeting Minutes
January 13, 2009 5:00 p.m. Conference Room #1
PRESENT
Councilmembers: Kathy Houagrdy, Chair; Joan Hernandez (filling in for Pam Linder), and Dennis Robertson
Staff: Jim Morrow, Frank Iriarte, Bob Giberson, Pat Brodin, Mike Cusick, Gail Labanara,
Derek Speck and Kimberly Matej
CALL TO ORDER: Committee Chair Hougardy called the meeting to order at 5:09 p.m.
I. PRESENTATIONS
No Presentations.
City of Tukwila
Utilities Committee
II. BUSINESS AGENDA
A. Interurban Water Reuse Foster Golf Links Reclaimed Water Pipeline Extension Proiect Bid Award
Staff is seeking full Council approval to award a bid in the amount of $103,385.41 to Precision
Earthworks, Inc. for the Foster Golf Links Reclaimed Water Pipeline Extension Project. Throughout
2007, staff brought forward information regarding this pipeline extension to the Utilities Committee as
well as full Council (see Utilities Committee minutes dated: 06/02/08, 04/07/08, 02/19/08).
The project will involve extension of the current reclaim water pipeline from Interurban Avenue South to
the existing pond at Foster Golf Links for the use of reclaimed for irrigation. The lowest bidder, in this
competitive process, was Precision Earthworks; who have previously worked with the City, but have
since expanded their services.
King County will not reimburse construction costs associated with this extension to the City until the
project is complete. UNANLMOUS APPROVAL. FORWARD TO JANUARY 26 COW.
B. Tukwila Village Northfield Car Wash Demolition Bid Award
Staff is seeking full Council approval to award a bid in the amount of $35,109.34 to Pacific NW
Earthworks, LLC, for the Tukwila Village Northfield Car Wash Demolition.
As with the bid above, this was also a very competitive process in which 21 bids were submitted. Pacific
NW Earthworks, has not worked with the City before; however, all references have been checked and
cleared.
Staff distributed a new tabulation sheet (page 8), to replace the original, incorrect tabulation sheet (page
8) which was included in the agenda packet. UNANIMOUS APPROVAL. FORWARD TO
JANUARY 26 COW.
III. MISCELLANEOUS
For a future agenda item, Jim Morrow suggested the Committee discuss the creation of a formal policy
regarding residential and commercial water leak adjustments. Committee members concurred.
Meeting adjourned at 5:42 p.m.
Next meeting: Monday, January 27, 2009 5:00 p.m. Conference Room No. 1.
Committee Chair Approval
Minut�s�by fC ''Reviewed by GL.