HomeMy WebLinkAboutPermit 1787 - Seattle First National Bank - Drive-Up BankLEGAL
)ESCR.
LOT NO.
BLOCK
TRACT
XXI SEE ATTACHED SHEET
OWNER
Seattle -First National Bank
PHONE
583 -5565
ADDRESS
821 2nd Avenue Seattle
ZIP
98104
CONTRACTOR
CBS Construction Inc.
PHONE
363 -5400
ADDRESS
958 North 127th Seattle
ZIP
98133
LICENSE NO.
223- 01- CB -SC -0- 375 -NO
SST NO.
C578 -55434
TYPE CONST.
OCC. GROUP
OCC. LOAD
FIRE ZONE
USE ZONE
AUTO SPRINKLERS REQ.
VN
B2
4
2
CM
O YES lXJ No
1. Driveway
2. OK to
3. Roof
4. OK to
5. Wall-
6. Structure
approach and
pour footing
sheathing
enclose
board
complete and/
slope
and /or
and nailing
framing
nailing
or OK to
foundation
OK
OK
occupy
11'
BUILDING PERMIT
DATE OF ISSUANCE
JOB ADDRESS
BUILDING USE
BLDG.
AREA
I CER
THAT
MET,
OWNE
COMMENTS:
September 25, 1979
Drive -up Bank
CITY OF TUKWILA
6200 SOUTHCENTER BOULEVARD
TUKWILA, WASHINGTON 98188
CLASS OF WORK
KNEW ❑ADDITION OREMODEL ❑REPAIR ❑OTHER (Specify)
EXPIRES
THESE INSPECTIONS ARE REQUIRED BY LAW
FOR INS ECJ.,I CALL 433 -184
BUILDI G OFFICI / , CIT OFT W
PERMIT / 37
NUMBER
January 22, 1980
1st FL.
400
2nd FL.
R / AGENT SIGNATURE
BASEMENT
TIFY THAT THE ABOVE INFORMATION IS TRUE AND CORRECT,
THE APPLICABLE CITY OF TUKWILA REQUIREMENTS WILL BE
AND THAT I AM AN AUTHORIZED AGENT FOR THE PROJECT.
GARAGE
canopy
4,056
DECK
MEZZANINE
i e let t 4 .4-i-vs,i-
FEE
DISTRIB.
# OF STORES
1
TOTAL S.F.
4,456
BUILDING
PLAN RVW.
DEMOLITION
BOND
OTHER Sepa
TOTAL
T 1 1 1 P1 11 1— 1"1 A A I T A A I 1 P1 T P1 1 P1 P( T 1 n P1 P1 h l n 1'1 1 /1 1 1 /'1 1 1(% 1♦/ , r a 11 1 1 1 1 Maki P'
VALUATION
$ 170,000.0
392.0
255.0
50,0
697.0
LEGAL
DESCR.11
LOT NO.
BLOCK
TRACT
SEE ATTACHED SHEET
OWNER
Seattle -First National Bank
PHONE
583. -5J65
ADDRESS
821 2nd Avonue Seattle
ZIP
981.04
CONTRACTOR
CBS Construction Inc.
PHONE
363 -5400
ADDRESS
958 North 127th Seattle
ZIP
98133
LICENSE NO.
223-01-C8-SC-0-375-NO
SST NO,
0578 -55434
TYPE CONST. O
OCC. GROUP O
OCC. LOAD F
FIRE ZONE U
USE ZONE A
AUTO SPRINKLERS REQ.
,� B
Bn 2
2 C
CM
�o .
t�
1. Driveway 2. OK to 3. Roof 4. OK to yil, 5. Wall- 6. Structure
approach and pour footing sheathing enclose board complete and/
slope and /or and nailing i framing nailing or OK to
foundation OK �/ OK occupy
�a�
�o .
t�
BUILDING PERMIT
DATE OF ISSUANCE
JOB ADDRESS
BUILDING USE
CLASS OF WORK
DY EW 0ADDITION 0 REMODEL 0 REPAIR OOTHER (Specify)
BLDG.
AREA
I CER
THAT
MET,
OWNE
COMMENTS:
Se.ptemher 25, 1979
w a Pa rkwa
Drive --up Bank
PERMIT
CITY OF TUKWILA NUMBER
6200 SOUTHCENTER BOULEVARD
TUKWI LA, WASHINGTON 98188
EXPIRES
THESE INSPECTIONS ARE REQUIRED BY LAW
FOR I,NS.PECT)QN CALL 433 - 1849.,
BUILDING OFFICIAt, CITY OF TUKWItA
January 22, 1980
87
1st FL.
400
2nd FL.
BASEMENT
GARAGE
canopy
4,056
DECK
TIFY THAT THE ABOVE INFORMATION IS TRUE AND CORRECT,
THE APPLICABLE CITY OF TUKWILA REQUIREMENTS WILL BE
AND THAT I AM AN AUTHORIZED AGENT FOR THE PROJECT.
R / AGENT SIGNATURE 1
MEZZANINE
FEE
DISTRIB.
# OF STORES
1.
TOTAL S.F.
4,4.56
BUILDING
PLAN RVW.
DEMOLITION
BOND
OTHER S Se)a
TOTAL
I737
VALUATION
170,000.11(
392.0(
255.01
50.01
69701
DATE 14 c f o oE j c - c
( PERMIT NO. WHEN VALIDATED
EXPIRES
JOB ADDRESS C/5 luge..t4 ILA rf'i 4CWftt vicwicA i WA-, cieg$s
LEGAL
DESCR.
LOT NO.
BLOCK
TRACT
X,SEE ATTACHED SHEET
OWNER -r ry C�
—mitsr � os dr e t . '
- �
PHONE s 3 ' qc
ADDRESS 82t 2W d E SEAT/] E r Wp 9 (o4-
r '
ZIP 9 Vf f
CONTRACTOR C55 c - D I S C ,
PHONE 3( . Slap
ADDRESS 1St i.s IZ'i S "["'Te ' t ► 1p4 r
ZIP Cr2
LICENSE NO 223... 0 (_ C$ - SG- 0 -. alS' --,o -
SST NO. C 5-7F - 55 3 Li
BUILDING USE az i g i a n uic..
TENANT .a.-- r�r
CLASS OF WORK ' CAl
.JEW ❑ ADDITION ❑ REMODELS ❑ REPAIR ❑ OTHER (Specify)
BLDG.
AREA
1st FL.
2nd FL.
BASEMENT
4+'.8,.61:
DECK
MEZZANINE
# OF STORES
TOTAL S.F.
VALUATION
-
BOND
410510
50, coo
PUBLIC WKS.
`
TOTAL
9195
`
T I70
NAME OF APPLICANT (PLEASE PRINT) rys 1 EV
. �" 1 IACA S 4 MSQuATr
`/
• ' `'` PHHONE
ADDRESS I li sae' mid vl• S rzt W
( 804
�p�i'f -38i ell
I CERTIFY THAT THE INFORMATION FURNISHED BY ME IS TRUE
TUKWILA REQUIREMENTS WILL BE MET.
AND CORRECT AND THAT THE APPLICABLE CITY OF
S , 4s
(d. W t
SI NATURE
F APPLICANT
APPLICATION FOR PERMIT
BUILDING DEPARTMENT
CITY of TUKWI LA
6200 SOUTHCENTER BOULEVARD
TUKWILA, WASHINGTON 98188
433.1849
DO NOT WRITE BELOW THIS LINE
RECEIVED
CITY OF TUKWILA
rrrRr C 19 +yam
J 1 9
BUILDING DEPT.
TYPE CONST.
OCCCC. GROUP
OCC. LOAD
FIRE ZONE
USE ZONE
AUTO SPRINKLERS REQ.
V /)/
f5
G�
r...31.
❑ YES ANO
PLAN
RVW
PLANS:
SENT
RETURNED
APPROVED
FEE
DISTRIB.
BUILDING
3qa C)
U
FIRE DEPT.
/ / (�
bl
� 2-v
[
PLAN RVW.
a � r � o
DEMOLITION
PLANNING/
SEPA
4( It 5
/./%5
BOND
OTHER .5""
50, coo
PUBLIC WKS.
`
TOTAL
6 1 4 7,0
RECEIPT NO.
COMMENTS:
APPROVED FOR INSURANCE BY ,57. . ....
3 q2 . (ro
?1?- .25-3 2053
. goo .)5 3 3 ..a5i{ 1450 eot.5- u,
•
APPLICATION FOR PERMIT
BUILDING DEPARTMENT
CITY of TUKWI LA
6200 SOUTHCENTER BOULEVARD
TUKWILA, WASHINGTON 98188
433.1849
DO NOT WRITE BELOW THIS LINE
RECEIVED
CITY OF TUKWILA
rrrRr C 19 +yam
J 1 9
BUILDING DEPT.
•
•
•
•
19 72 r Ca
,
V r •
•
.. f- [':.:; T - ...• ,,ar lw'.: : ... -. :,'_'10 i•, :3ii:..r i 1"jF
•
X11 : ` —_ : «'1 i�Y. •r,, I ,.4� • �• �,.. 1 \ :�' 1 Y ,-'• . � , . '..i .F..' - .: � f.� .(.:: .: -. - � .• •Y`• -
rac t of . Land • .- rt.:: Sect ion-' Z� x ; o . t.ob.ip:-' _
�6 ; : tha in ari•: � ;lXari i'o �,
;ii3tc,: Claim ,;.. ,;:
Vi'''a tirt�o Qf; Troia �• ri3a ^ • -�.: s�•. a�: 1' of � -` nB:. ri�� ., k�. -��
; v _ wa, tl a► "ro,orded_ in :- ' s:. s•; r- y
t :; yolum. ®" :1 .,: • .. ~II a o gets , of �.� ~ «. �
. ' C nu.�.•, ,5 8e Zi : �r3 hc -� $ �.to :,to�t8' #. �. :?_ _, ,:, .:Y .;i .�_ ::; ,
:S. 6 « . % ,a.ri.• s: Y : ; � :ir' ..a,; . :,'�r � - fpS.r l c y ' ' ,e : � : =l ' e LJ . °
.
BUILDING PERMIT REVIEW - SEATTLE FIRST NATIONAL BANK SITE
PLANNING DIVISION COMMENTS
SHEET A -2:
1. Maintain minimum 12' one -way aisle width between new 0 parking stalls
adjacent to west property line of the existing Sea -First site, and the
new curb section shown on this sheet.
2. Proposed 0 stalls to hold minimum 24' curb length to accommodate ade-
quate back -up space.
3. Eliminate at least the 3 north-most proposed 0° parking stalls in order
to accommodate addition of a 6' wide landscape strip adjacent to the
north property line of the existing bank site.
4. Extension of a new sidewalk along the north property line of the exist-
ing bank site subject to requirements of the Public Works Department.
See attached memo of 21 August 1979.
Depict location of new or relocated utility transformer pad and equip-
ment, if any.
1. Dimension exterior elevations, and note vehicular clearances.
2. Note colors and textures to be applied to all exterior surfaces and
trim.
3. Depict any signing, directional or advertising, to be placed on any
elevation of either structure.
SHEET L -1, L -2, L -3:
1. Landscaping plans for this project subject to review by the Planning
Commission prior to occupancy, per condition 7 of 0.C.D. Director's
letter of August 1, 1979. — Plans not approved at this time.
2. See attached letter of 21 August 1979 for outline of staff concerns
regarding the current landscaping proposal.
SHEET M -1:
1. Roof - mounted vent not screened per intent of condition 1 of 0.C.D.
Director's letter of 1 August 1979.
21`August 1979
City "ofTukwila
Planning Division
6200 Southcenter Boulevard
Tukwila, Washington 98188 433 -1845
Office el community Development
Joyce /Nordfors & Associates
119 South Main Street
Seattle, WA 98104
ATTN: Randy Everett
22 August 1979
RE: LANDSCAPING PLANS, SEATTLE FIRST NATIONAL BANK DRIVE -UP
(YOUR PROJECT NO. 146)
Dear Randy:
During my recent review of building permit materials submitted by your
office, I noted that a comprehensive planting and irrigation plan has
been prepared for this project. As you know, the project landscape plan
must be submitted to, and approved by the Planning Commission before
occupancy of the.new drive -up facility. Thus, staff could not at this
time endorse sheets L -1 through L -3 as contained in the building permit
plan set. However, I am pleased that your design team has already begun
work on the planting plan, since we can discuss and resolve related con-
cerns well in advance of project completion.
Specifically, I believe that the following points represent legitimate
public concerns, and are offered for your consideration:
1. Proposed Acer Platanoides Screen
a. This tree specimen is deciduous, meaning that the project
will not be adequately screened during those months when
the trees are barren. We suggest that your designer con-
sider a mix of several varieties of tree specimens, both
deciduous and evergreen, to achieve year- around site
screening, seasonal color change, and variety of growth
habit and leaf texture.
b. The strict on- center spacing of the tree screen seems rigid
and unnatural. Please consider staggering the tree posi-
tions, and possibly grouping some in groves or clusters at
strategic view points in order to simulate a more realistic
growth pattern.
c. Our referrence indicates that this tree has a characteris-
tically aggresive root system; please examine this speci-
men, or any.substitute, for its potential for root damage
to surface improvements or underground pipe lines, conduits
or outfalls.
' Randy Everett
Joyce /Nordfors & Associates
2. Proposed Prunus Laurocerasus Hedge
a. Our concern here is not with the proposed plant specie itself,
but with the relative density of landscape material immediately
adjacent to the teller's building entrance. We certainly en-
dorse the approach indicated from a visual quality standpoint;
however, the bank's security analyst may view this proposal as
a potential danger to employees in the teller building since a
thief or mugger could be concealed in the mature shrubbery.
If the bank or the Tukwila Police Department do not share this
concern, however, the Planning Division will require no changes
to this aspect of the planting plan.
I would welcome the opportunity to meet with you personally to discuss the
items mentioned in this letter, and any other aspect of your building per -
mit;approval. Please call me at your convenience and we'll arrange a con -
ference.appointment.
Sincerely,
Ma$ Caughey
Assistant Planner
CITY OF,T'4{CWILA
Page 2
22 August 1979
MC /ckh
Gam: Koff-LA-
Attachment
City cif Tukwila
6200 Southcenter Boulevard
Tukwila Washington 98188
Edgar D. Bauch, Mayor
M EM®RANDUM
To: Phil Fraser, Office Engineer - Department of Public Works
FROM: Mark Caughey, Assistant Planner - O.C.D.
DATE: 22 August 1979
SUBJECT: SIDEWALK REQUIREMENT, SEA -FIRST BANK DRIVE -UP
As you know, Planning Commission approval for this project left the
resolution of public sidewalk requirements to the assessment of your
office. However, O.C.D. wishes to encourage you to require sidewalks
along the entire north and east boundaries of the total Sea -First
site, if you find justification to require sidewalks at all in this
vicinity. This recommendation is based on Ordinance #1025, the City
of Tukwila Sidewalk Plan, Section III of which identifies the Andover
Park West and Tukwila Parkway frontages as "high- priority" components
of the commercial sidewalk system.
Policy 1, Goal 2, Section III'of Ordinance #].025 (attached) suggests
sidewalk construction priority should be analyzed according to foot -
traffic demand in the vicinity. As you observed in our conversation
this morning, this approach is difficult to accept literally since
construction of sidewalks where they previously did not exist tend
to attract new pedestrian activity. However, O.C.D. suggests that
the current permit application represents a significant opportunity
to complete a vital linkage in the sidewalk system which may not
occur again for many years. The opportunity for Sea -First to fulfill
these improvements at today's, rather than tomorrow's costs, might be
a factor to consider in your study of this matter.
Mr. Randy Everett
Joyce /Nordfors & Associates
119 South Main Street
Seattle, WA 98104
Dear Mr. Everett:
cc: Pln Sup.
g.• Off.
Office Eng.
File
City of Tukwila
Planning Division
6200 Southcenter Boulevard
Tukwila, Washington 98188 433 -1845
Office of Community Development
20 June 1979
RE: SEATTLE -FIRST NATIONAL BANK SOUTHCENTER DRIVE -UP
The development plans and environmental checklist for the above project has
been reviewed by various departments within the City. As a result of those
comments, I am requesting that you provide additional information concerning
the traffic impact of the facility. The Public Works Department has speci-
fically asked for a traffic generation /traffic flow study of the total banking
facility. The study should include traffic flow counts per hour during the
normal banking day and current traffic counts for a similar facility. In addi-
tion, the study must include traffic counts for surrounding access roads during
banking hours. If you have any questions concerning the focus of the study
please contact Phil Fraser, Office Engineer, Tukwila Public Works Department
at 433 -1851.
Until the study is completed and reviewed by the Tukwila Department of Public
Works, both applications for Board of Architectural Review approval and for a
building permit will be considered as Pending for lack of information. Our
request for a traffic study is based on the premise that an applicant should
be provided with the opportunity to address potential points.of critical impact
without having to do a total environmental impact statement.
Since the application is considered to be incomplete, it has been removed from
the June 28th Planning Commission Agenda. It will be rescheduled after the
Planning Division has received a analysis of the traffic study. If you have
any further questions please call Mr. Fred Satterstrom at 433 -1847.
ncerely,
Te Ca 64
Roger J. laylock
Assistant Planner
Mr. Randy Everett
Joyce /Nordfors & Associates
119 South Main Street
Seattle, WA 98104
City of Tukwila
6200 Southcenter Boulevard
Tukwila, Washington 98188
Public Works Department 433 -1850
August 27; 1979
Re: Seattle -First National Bank
Dear Mr. Everett:
The review of the site. plan Sheet No. A -2, C -1, C -2, & -C -3 has been provided
by the Department of Public Works with the following comments:
The required permits to be applied for and obtained prior to construction
are as follows:
1) Domestic water meter
2) Curb cuts /Access
. 3) Sidewalk
4) Storm Drainage
5) Sanitary side sewer
6) Irrigation water system
Prior to final review and approval, the following comments shall be addressed
on the plans:
.1) Extension of the 6 -foot sidewalk abutting the north curb of the property
Tukwila Parkway to the Southcenter access road (see attached plan).
The City of Tukwila is now requiring specific pedestrian corridors be
created. Two of these corridors are Tukwila Parkway and Andover Park
West. In the future, we anticipate your neighbors to the south, west,
and east will complete the pedestrian walkway system. Therefore, the
above extension is required to insure that an identifiable pedestrian -
system along these corridors is provided with no gaps which could lead
to future pedestrians having to walk through vehicular corridors and
parkways with no identifiable right -of -way.
2) Provide wheelchair ramps in sidewalks at crossings per City of Tukwila
Standard.
3) Identify adjusted interior curbs in northwest corner of property per
Planning Department comments.
*Mr.:Randy Everett
Joyce /Nordfors-& Associates
August 27, 1979
4) Provide six (6) sets of plans identifying irrigation system for
Public Works Department review and approval.
We are, hereby,'returning. your drawings for resubmittal. Please resubmit
six (6) :sets of all above plans, with.. above comments addressed.to the mutual
satisfaction of the owner and the Public Works Department for our final review
and approval.
If . you have any questions. concerning the above,. please do not hesitate to
call.
PF /jm
cc: Al Pieper, Building Official
Allen Roberson, Seattle-First National Bank
-Sincerely,
FA a
Phillip Fraser
Senior Engineer
COMMERCIAL GOALS AND POLICIES
discontinuities prior to constructing sidewalks
The goals and policies associated with this system are as follows:
Goal 1: Emphasis should be placed upon completion of existing sidewalk
in other areas.
Policy 1: Where short sidewalk discontinuities exist, city
crews should be used to complete the segment.
Goal 2: Sidewalks adjacent to public rights -of -way should be required with
new pedestrian- oriented commercial construction.
Policy 1: Priority should be given to construction of sidewalks
where there is the highest amount of pedestrian traffic.
Policy 2: Sidewalks should have a minimum width of five (5) feet..
Policy 3: Safe pedestrian access should be made available from•
sidewalks to retail structures.
Goal 3: The City should join property owners on a 50% matching basis for
construction of sidewalks on an L.I.D. basis.
Policy 1: Timing should provide for construction of high priority
systems first.
Policy 2 :. Landscaped areas should be preserved to the maximum
extent possible.
Goal 4: The commercial sidewalk system should be tied to the residential
sidewalk system, where feasible.
-6-
y.
City of Tukwila
6200 Southcenter Boulevard
Tukwila, Washington 98188
Public Works Department 433 -1850
Mr. Randy Everett
Joyce /Nordfors & Associates
119 South Main Street
Seattle, WA 98104
Dear Mr. Everett:
1) Domestic water meter
2) Curb cuts /Access
3) Sidewalk
4) Storm drainage
5) Sanitary side sewer
, 6) Irrigation water system*
September 25, 1979
PRF /jm
cc: Al Peiper, Building Official
Allen Roberson, Seattle -First National Bank
Re: Seattle -First National Bank
The review of the site plan Sheet No. A -2, C -1, C -2, & C -3 has been
provided by the Department of Public Works and the plans are approved.
The required permits to be applied for and obtained prior to construction
are as follows:
*Prior to the issuance of the irrigation permit, you shall provide six
(6) sets of plans identifying irrigation system for Public Works Department
review and approval.
The Building Department is authorized to release the building permit per
this review.
. Sincerely,
Phillip •. Fraser
Senior Engineer
' '
m�""0��� of �7U U
U ~. ^ ~"U
. ' ~
city »��K U �� ;
"
^ ` \�
^ �~� K~�
Fire Deportment
AL PIEPER '
BUILD%No DEPARTMENT
CITy TUKWILA
RE: SEA~FIRGTDRIVE-UP
Edgar D. Bauch
Mayor
Hubert H. Crawley
FlmCh|ef
FIRE PREVENTION
JUNE 18v 1979
— DEAR AL:
'IN R THE ABOVE MENTIONED PRO~JECT'PLANSv PLEASE NOTE
THE FOLLOWING ITEMS:
1^ : PER UFC SECTION 10^104 �B), ALL DOORS IN OR LEADING
TO EXITS ��HALLBE MAINTAINED OPENABLE FROM THE INSIDE
' WITHOUT THE USE OF A NEY OR ANY SPECIAL KNOWLEDGE OR EFFORT
AT ALL . TIMES WHEN THE BUILDING OR AREA SERVED THEREBY IS
OCCUPIED"^
'
2^ PER UFC ��ECTION 1O^113v AT EVERY REQUIRED EXIT
:` DOORWAYv AND WHEREVEROTHERW1 REQUIRED TO CLEARLY •
INDICATE DIRECTION OF EGRESS, AM EXIT SIGN WITH LETTERS
AT LEAST SIX INCHES HIGH AND READILY DISTINGUISHABLE SHALL
. .B�� MAINTAINED.
�
3^ WALLS TO BE FIRE STOPPED PER UBCGECTION 2517 (F)^ •
'¢^ FIRE EXTINGUISHERS SHALL:BE PROVIDED PER NFPA .#10" AS
A MINIMUM RES.I.IR EN
EXTINGUISHER REQUIREMENTS FOR YOUR FACILITY ARE AS FOLLOWS.
EITHE ONE 2—.1/2 GALLON PRESSURIZED WATER EXTINGUISHER / ND�`
�
' ONE DRY CHEMICAL EXTINGUISHER RATED 10 B—C OR ONE "ALL
• :PURPOSE" DRY CHEMICAL E%TINGUISHERRATW 2 Av 10 B—C_
5^ AN #PPR[>VEDx SUPERVISED SMOKE DETECTION SYSTEM %G
•NEQUIRED PER�CITY ORDINANCE'#1061 AN APPROVED AUTOMATIC
: :$PNINNLER SYSTEM MAY BE INSTALLED IN LIEU OF # SMOKE
NN
�°. .^n^..� NN un~m~~....~~~ ^^^ ^.ri,....1:3n~.C.. • 'n°.u.'m*.InI..ew. "0."D "nna% C7=^ ^n^
C ity of Tukwi I (
Fire Departmen
PAGE 2
Hubert H. Crawley
Fire Chief
tiETECT.:CON SYSTEM;
I. VA ):: INCLUDE :THESE ' COMMENTS IN YOUR REVIEW or THE ABOVE
MENTIONED
;CsTr- D:Fa:LE •
YOURS VERY , TRULY
i
YOUR 1UKWII..I 'FIRE DEPARTMENT
fS 4.. r. .L...IIn
fSl.� rk' \ AAA A.. J..:.. A..1. 8 __• nfl • flI 1 I Cdr uf\A
CONIT UCT ION INC.
958 N.127 SEATTLE, WASHINGTON 98133
206=363 -5400
Joyce Nordfors Associates
119 South Main
Seattle, Wa. 98104
Subject: • South Center..Sea First..Tukwila Building Permit #1787
Gentlemen:
We respectfully submit °the following information
related to the subject'project asrequested by the
Tukwila .Building Department.
The cost to furnish and install a monitored fire alarm .
system for the new Driiie Up Facility Work Room Building,; -
(approximately 20' X 26') is ($1,488.00)
ONE. THOUSAND FOUR.: HUNDRED EIGHTY EIGHT & No /100 Dollars
Plus Washington State Sales Tax
No. detection system has been' included for the detached
covered canopy.
The system is to be connected to the present bank building .
system approximately 100' to the west..
Sincerely,
Roy Boese
President
Mr. Al Pieper, Tukwila Building Department
5 October 1979
BUILDING PERMIT REVIEW - SEATTLE FIRST NATIONAL BANK SITE
PLANNING DIVISION COMMENTS
SHEET A -2:
1. Maintain minimum 12' one -way aisle width between new 0 parking stalls
adjacent to west property line of the existing Sea -First site, and the
new curb section shown on this sheet.
2. Proposed 0 stalls to hold minimum 24' curb length to accommodate ade-
quate back -up space.
3. Eliminate at least the 3 north -most proposed 0° parking stalls in order
to accommodate addition of a 6' wide landscape strip adjacent to the
north property line of the existing bank site.
4. Extension of a new sidewalk along the north property line of the exist-
ing bank site subject to requirements of the Public Works Department.
See attached memo of 21 August 1979.
5. Depict location of new or relocated utility transformer pad and equip-
ment, if any.
SHEET A -4:
1. Dimension exterior elevations, and note vehicular clearances.
2. Note colors and textures to be applied to all exterior surfaces and
trim.
3. Depict any signing, directional or advertising, to be placed on•any
elevation of either structure.
SHEET L -1, L -2, L -3:
21 `August 1979
1. Landscaping plans for this project subject to review by the Planning
Commission prior to occupancy,• per condition 7 of O.C.D. Director's
letter of August 1, 1979. — Plans not approved at this time.
2. See attached letter of 21 August 1979 for outline of staff concerns
regarding the current landscaping proposal.
SHEET M -1:
1. Roof - mounted vent not screened per intent of condition 1 of O.C.D.
Director's letter of 1 August 1979.
August 1, 1979
Mr. Randy Everett
Joyce /Nordfors & Associates
119 South Main Street
Seattle, WA 98104
RE: Seattle First National Bank - Southcenter Drive -Up Facility
Dear Mr. Everett:
City Tukwila
Administration
6200 Southcenter Boulevard
Tukwila, Washington 98188 433 -1845
Office of Community Development
C
The Planning Commission reviewed your above referenced project during
their regular meeting of July 26, 1979. After r discussion
on the matter they approved your project subject to the following con-
ditions:
1. Screening of all roof - mounted vents, if there are any roof -
mounted vents.
2. Provide handicap provisions in parking lot per code. Parking
lot to comply with minimum parking lot standards in the Seattle
Zoning Code.
3. Parking on the north and west side of the building to be nego-
tiated between applicant and the Planning staff.
4. The 4,000 square foot proposed canopy to set back at least 50
feet from any right -of -way.
5. Traffic problems to be resolved by mutual agreement between the
applicant and the Public Works Department.
6. The Planning Division staff is to review and approve any revised
site plans prior to issuance of any building permits, except
item 5.
7. A landscape plan is to be approved by the Planning Commission
prior to occupancy of the new drive -up bank facility.
In your design of the roof for the proposed drive -up tellers, I would
recommend that you consider campers and other types of higher vehicles in
the design of the facility so that the roof line of the teller facility
would not be in conflict with these higher vehicles. That is a recommen-
dation, not a requirement.
.
Mr. Randy Everett
Joyce /Nordfors & Associates
AA LI,L6
Kej11IStoknes, irector
Offic of Community: Development
While the Planning Commission did not require a sidewalk for your facility,
the City Council by ordinance 111025 has stated that at the time of building
permit application, an assessment should be made regarding the necessity of
sidewalks. If deemed necessary, the applicant should construct sidewalks in
conjunction with the building permit. . This area is identified as an area of
high priority for sidewalks and should the Public Works Department deem side-
walks as necessary, a five foot sidewalk built to city standards would be
required and be.a condition of any building permit issued.
If you have any questions or wish to get together on this item please call
me at your convenience.
Very truly yours,
KS /ckh
cc: Terry Monaghan
Phil Fraser
Page 2
August 1, 1979
w "A �4s City of Tukwila
y
6200 Southcenter Boulevard.
Tukwila Washington 98188
\1909 • . . Frank Todd, Mayor . ,
Randy Everett
Joyce /Nordfors Associates
119 South Main Street
Seattle, WA 98104•
Dear Mr. Everett:
•
; !'cc :. . Al "Pieper,.' Building Official
Enclosure approved drawing
Sincerely,
Re: Seattle -First National Bank
Landscape Irrigation Permit
The Public Works Department has reviewed your landscape irrigation
plans ,No. L2 & L3 and approved them for irrigation water system only.
•
Please obtain your. permit 24 -hours before construction so that:you
may notify our inspector in a.timely fashion.