HomeMy WebLinkAboutPermit 1497 - Schneider Construction Company - 18-Unit ApartmentROILDING PERMIT
CITc ,DF TUKWILA BUILDING P��
i
MIT
14475 • 59th Ave. So. / Tukwila, Washington 98067
Applicant to complete numbered spaces only.
BUILDING
PERMIT NO.
N° '.,E-
ry ?7
JOB ADOR E55
15120 65th Avenue South
DATE
June 12, 1978
LEGAL
1 DESCR.
LOT N0.
24
BLN
TRACT
(JSEE ATTACHED SHEET)
Interurban Addition to Seattle
OWNER MAIL ADDRESS ZIP PHONE
z —5510 - eDgii
Schneider Construction Co. 665 Strander Blvd., Tukwila —248
CONTRACTOR MAIL ADDRESS PHONE LICENSE 140.
Same LIC # SCHNFI 245 P8 Sales Tax No. X 600 211 664
ARCHITECT OR DESIGNER MAIL ADDRESS PHONE LICENSE NO.
4
ENGINEER MAIL ADDRESS PHONE LICENSE ND.
5
LENDER MAIL ADDRESS BRANCH
6
U5C OF BUILDING
7
8 Class of work: CNEW I: ADDITION • ALTERATION 0 REPAIR • MOVE ■ REMOVE
s Describe work: Apartment building -- 18 units
nl C-/i. 2Y
('c C . nrj4 44 9,..s-- 2.6
10 Change of use from
Change of use to Total Fee $ 668.00
11 Valuation of work: $ 239,270.00 I
PLAN CHECK FEE $ 263.00
PERMIT FEE $ 405.00
SPECIAL CONDITIONS:
Type of .
Const. N
Size of Bldg. 1I nA,...-
(Total) Sq. Ft. 8X1101®
Group R-1
No. of
Stories 2
Division
Max.
Occ. Load
Fire
Zone 3
Use
Zone R -3
Fire Sprinklers
Required • Yes x.10
APPLICATION ACCEPTED BY
PLANS CHECKED BY
APPROVED FOR ISSUANCE BY
Pieper
No. of
Dwelling units 18
OFFSTREET PARKING
Covered
SPACES:
Uncovered
},Al
NOTICE 13U1iding Offic141Special
SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMB-
ING, HEATING, VENTILATING OR AIR CONDITIONING.
THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUC-
TION AUTHORIZED IS NOT COMMENCED WITHIN 60 DAYS, OR IF
CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A
PERIOD OF 120 DAYS AT ANY TIME AFTER WORK 1$ COM-
MENCED.
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS
APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT.
ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS
TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED
HEREIN OR NOT, THE GRANTING OF A PERMIT DOES NOT
PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE
PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING
CONSTRUCTION OR THE PERFORMANCE OF CONSTRUCTION.
Approvals
Required
Not Required
Approved
ZONING
HEALTH DEPT.
FIRE DEPT.
SOIL REPORT
OTHER (Specify)
FOUNDATION
FRAMING
FINAL
SIGNATURE OF OWNER (IF OWNER BUILDER)
51 ' A URE OR AUTHORIZED AGENT ATE)
WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT
PLAN CHECK VALIDATION M.O. CASH PERMIT VALIDATION ek4J
OCCUPANCY PERMIT REQUIRED
M.O. CASH
RIMING PERMIT
CITOF TUKWILA BUILDING PMIT
14475 - 59th Ave. So. / Tukwila, Washington 98067
Applicant to complete numbered spaces only.
1
BUIL I
PERM NO
N"
J r7
JOB ADUR ESS
15120 65th Avenue South
DATE
June 12, 1978
LEGAL
1 LEGAL.
LOT NO.
24
BLK
'(RACT
(❑SEE ATTACHED SHEET)
Interurban Addition to 'Seattle
OWNER MAIL ADDRESS ZIP PHONE
2 Schneider Construction Co. 665 Strander Blvd., Tukwila 575 -1510
CONTRACTOR MAIL ADDRESS PHONE LICENSE NO.
Same LIC # SCHNEI'245 P8 Sales Tax No. X 600 211 664
ARCHITECT OR DESIGNER MAIL ADDRESS PHONE LICENSE NO.
4
ENGINEER MAIL ADDRESS PHONE LICENSE NO.
5
LENDER MAIL ADDRESS BRANCH
6
USE OF BUILDING
7
S Class of work: EiNEW • ADDITION • ALTERATION ❑ REPAIR ❑ MOVE • REMOVE
9 Describe work: Apartment building -- 18 units
10 Change of use from
Change of use to Total Fee $ 668.00
.
11 Valuation of work: $ 239,270.00 PLAN CHECK FEE $ 263.00
PERMIT FEE $ 405.00
SPECIAL CONDITIONS:
Type of
Const. V. N
Occupancy
Group R -1
Division
Size of Bldg. 11, 520
(Total) Sq. Ft.3469Iri
No. of
Stories 2
Max.
Occ. Load
Fire
Zone 3
Use
Zone R -3
Fire Sprinklers
Required Dyes Mo
APPLICATION ACCEPTED BY:
PLANS CHECKED BY.
APPROVED FOR ISSUANCE BY
Al Pieper
No, of
Dwelling Units 18
OFFSTREET PARKING
Covered
SPACES:
Uncovered
NOTICE : ul sing 1 1 C1
SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMB-
ING, HEATING, VENTILATING OR AIR CONDITIONING.
THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUC•
TION AUTHORIZED IS NOT COMMENCED WITHIN 60 DAYS, OR IF
CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A
PERIOD OF 120 DAYS AT ANY TIME AFTER WORK IS COM•
MENCED.
1 HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS
APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT.
ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS
TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED
HEREIN OR NOT, THE GRANTING OF A PERMIT DOES NOT
PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE
PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING
CONSTRUCTION OR THE PERFORMANCE OF CONSTRUCTION.
lSpeciai Approvals
Required —1
Not Required
Approved
zoNING
HEALTH DEPT.
'
FIRE DEPT.
SOIL REPORT
OTHER (Specify)
FOUNDATION
FRAMING
FINAL
SIGNATURE OF OWNER (IF OWNER BUILDER)
SIANA UHE OR AUTHORIZED AGENT FOATE)
WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT
PLAN CHECK VALIDATION M.O. CASH PERMIT VALIDATION M.O. CASH
OCCUPANCY PERMIT REQUIRED
FoRrt.d.14
CITY OF TUIWILA
.'BUILDING DEPARTMENT.
N S P E C T I O N rt._E M 0.
Date
.:TYPE OF
INSPECTION
:STREET
ADDRESS
PERMIT
NUMBER
OWNER
RE 1ARKS
CITY: OF...!TUCWILA
BUILDING 'DEPARI(ENT
'Date
STREET
ADDRESS
LOT
NO .
PERMIT.
NUMBER
INSPECT 0 v P.M CONTRACTOR
OWNER
Rauk RKS %��" �/ � �`�' /�- _ '� ",`J . �ru -e-•�.
U `^eL
TYPE OF • A STREET
INSPECTION / �)/ ADDRESS / S / 2- S•�.
LOT
NO.
PERMIT
NUMBER / l j
A.M.
INSPECT / O.`U C) An CONTRACTOR
OWNER
RE1ARKS
.FORM 1,14..
CITY OF . TUK?'1TL.4.
BUILDING DEPARTMENT
TYPE OF
INSPECTION
,STREET
ADDRESS:
LOT PERMIT u �j
• NO. NUMBER % ! 7 •
A.M.
INSPECT CONTRACTOR
CITY OF'*TUKWILA:
BUILDING DEPARTMENT
N 5 P E C T I 0
MEM0 :.
Date
TYPE OF
. INSPECT ION
u VA, DA-T/ ate:
STREET
ADDRESS
INSPECT P. M. CONTRACTOR
OWNEF
'WTY (7.11'1(Vili i BBILDI ]6 ORS
G230'Soilthcenter I3Ivc1..
Tukwila, Washington ()8067
Phone: (206) 242 -2177
1CATION OF W f I' / UMBER et STREET
1,51g0 -.lauNlr
IT
7-4//-e
BLOCK SUBDIVISION
V
TNER
_aZileac-n 42ea.A
)DRESS
1ME OF BUIL
DURESS
e e ECEI /ED
PHONE 5-17(.5-7----1- /(.5-7
STATE LICENSE NO.610 e /c45/616
SALES TAX NO. 606 -a !/ -46 `F
PHONE
MAY 12197'8
BUILDING OEF
RECEIVED
CITY OF TUKWILA
JUN -16 IftW /'17
BUILDING DEPT.
"- N4SW.+ J614,T aIRI IITIQW, hiii+r4im...f7 h' Nwe„nhirN0
APPLI CATION
FOR
BUILDING PERMIT
DATE TODAY
iSCRIPTION OF WORK: •
_.C. bA[S 1 " 411 ' __._.._
, I 1 ` r % 1 4
, 5_- /o7 — .1E2 6='_L_� )
NLALIE__ 0 F_Tal A 14.1..: R1'01 411, I' ,itt pirveitkk
NAL) R. QE J $ LIES S S : �"' ! ' ! %B
?„2 G 0 0
ESTIMATED VALUE
COMPLETED WORK
IT FEE
PLAN CHECK FEE
079, La e
7 0 I. p
uolTi
ATE PERMIT FEE
vfr0I.
OCCUPANCY R
TOTAL FEE
TYPE OF 4,
CONST.
GROUP
OZONE
FIRE SPRINKLERS MAX:
REQUIRED DYns fxINo OCC. I.OAD
THIS PERMIT DOES NOT AUTHORIZE ANY WORK IN PUBL.I /GHT - OF•WAY OR ON ('rILI TY EASEMF, Nrs.
. SEPARATE' PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HEATING, VENTILATING OR AIR CONDITIONING.
HEREBY CERTIFY THAT NO WORK IS TO BE DONE EXCEPT AS DESCRIBED ABOVE AND IN APPROVED PLANS AND +~
SPECIFICATIONS AND THAT ALL WORK IS TO CONF ATO TUIt ILA CODES AND ORDINANCES.'
APPLICATI0;1 FOR PER,'•IIT
Location of work /# & St.
Date of Appl i cation
Date Permit Issued
Owners Name
CITY F TUKWILA BUILDING DEPARTPP!T.
_ 5200 SOUTHCENTER BOULEVARD
TUKWILA, WASHINGT0N 98188
PHONE: (206) 242 -2177
Permit Dumber When Validated
Permit Expires
Owner's Address
Phone
Zip
Legal Description
Contractor's Name
Phone
Contractor's Address
Zip
Registration Number State Sales Tax Number
Building Use
--24
DO NO.T WRITE BELOW THIS .LINE
f
72461A Z'1
2nd Base- Garage/ Deck # of
R
fiez-
Floor Floor ment Carport
ota
zanine Stories Area
TYPE
CONST.
Bldg. Dept.
P1 an to Pub Wks
OCC.
GROUP
4 -S
i.S`. 5 -21,
n
Plan to Planning
Plan to Fire Dept
ent
Returned
Rd tut 4ne
Automatic Sprinklers Required?
VA r1ATION:
17.? 730.
(Ord. 7 )
Hose Stations Required? . (Orc: 730
R Hydrants Required? (Ord.
E Standpipes Req ed?
D
E
Fire Dept. Ac
Fire Lanes R
ate?
red? (Ord. 757)
y�.
YES
YES
YES
YES
YES
YES
P See plans review letter attached for comments.
T Date: By:
HATE, •
Drainage
.Curbin61;
ApproaG'f.�
SEWER
MSC/
PUBLIC WORKS
LAND USE EA AGL ENT
LUAC Submitted
Issued '1 /
LURC Sent 1�
98'
Cat Exempfi
Neg. De516"'/ /
EIS /-7
'SEPA
%L
FEE DISTRIBUTION
Building
Plan Review
Mechanical
Fire Place
Demolition
Bond
TOTAL
473
43S.
0 0
CITY OF TUKWILA BUILDING DEPART PENT
tr 6200 SOUTHCENTER BOULEVARD g.
TUKWILA, WASHINGTON 92188
PHONE: (206) 242 -2177
APPLICATIO 1 FOR PERMIT
Location of work /? & St. / f d�Q -- (y 5 Gw-e 5
Date of Anpl i cati on 5"-- / R-- f4 Permit Number When Validated
Date Permit Issued Permit Expires
Owners Name Sew N C'o,ys -; /iv e,
Owner's Address 446- 57 -444/4 Rif /3 L f/,U,
Legal Description
Phone 4-745---/J;70
�c w �:-:•�
Zip
Contractor's Name 5o/yjz'
Contractor's Address
Phone
Zip
Registration Number
Building Use /1/ w. fi f 7 S ,
State Sales Tax NumberX 600 -g77- 664
DO NOT WRITE BELO!4 THIS LINE
3Sr/0
1st
Floor
TYP
CONS
Bldg. Dept.
Y yU 3Sby0 2. /I S Za
VALUATION: 40231/.17a"
2nd Base- Garage/ Deck Mez- ' of Total
ment Carport zanine Stories Area
Automatic Sprinklers Required? (Ord. 730)
'/ 3
GRO F Hose Stations Required ?.(Ord. 730)
4V I
Plan to Pub Wks /� �/.
t'G
Plan to Planning
Plan to Fire Dept
Sent Re rued
0'
urned
r�7
ent Returned
YES
YES
R Hydrants Required? (Ord. 729) YES
E Standpipes Required? G= L �^ ' --YES
Fire Dept. Access Adequate? YES
Fire Lanes Required? (Ord. 757) YES
P See plans review letter attached for comments.
T Date: By:
PUBLIC WORKS
WA Trot
Drainage
Curbing
Approaches �E € JV r 5v
SEWER .
.MISC.
!Hydraulic Cond.
LAND USE MANAGEMENT
LUAC Submitted
Issued
LURC
986 SEPA
Cat Exempt / /
Neg. Dec. / /
EIS
FEE DISTRIBUTION
Building
Plan Review
Mechanical
Fire Place
Demolition
Bond
TOTAL
405 •
448.4°
'41 �t 1. � �ri� � 8.. � .. F 4t �'{ .7 � ! ?�;l. � � 1 p -.t 1 �t. M.v d ..'f4.` {�•5�:�; :dG,4- '• :x�' F't .� aF .�.4 ' 4
FIRE DEPARTMENT
CITY of TUKWILA
444 ANDOVER PARK EAST
TUKWILA, WASHINGTON 98188
TELEPHONE: (2061'244- 7221"
July ], 1977,
In reviewing the above mentioned project plans, please note the
following items:
Fire extinguishers shall be provided per NFPA #10, as a
minimum requirement.
. Fire hydrants are required as detailed in City Ordinance
#'729.
3 . Protective guard posts or . curbs are required around , all gas
meters, electrical_ vaults, sprinkler_ valves and hydrants.
'Please-include.these comments in your review of thel above;
mentioned project.
444 ANDOVER PARK EAST
TUKWI LA, WASHINGTON 98188
TELEPHONE: (206) 244-7221
Enclosed attic spaces 3000 square ° feet : per Sec. 3205(b) ?
Could you check on access for fire apparatus. r ;(Not. less
than3 sides of the building)
.Doug
OFFICE of COMMUNITY CEVELOPMENT
19 October 1977
Gerald E. Schneider
665 Strander Boulevard
Tukwila, Washington 98188
RE: PROPOSED APARTMENT COMPLEX ON 65TH AVENUE SOUTH
Dear Mr. Schneider:
On 19 September 1977, the Tukwila City Council passed the
Comprehensive Land Use Policy Plan and a companion ordinance,
No. 1035. The Comprehensive Plan Map designates your pro-
posed apartment site as "medium- density" residential. Medium -
density is defined in the Plan as 6 - 16 units per gross acre'
and is characterized by duplex, triplex, or four -plex develop-
ment. Ordinance 1035 requires a waiver for any land use action
which is not consistent with the Land Use Plan Map.
The density of your proposed apartment complex at 15200 - 65th
Avenue South is approximately 21.8 units per acre (48 units
2.2 acres = 21.8 units per gross acre). This density exceeds
that generally indicated on the Land Use Plan Map. In addition,
the structures proposed are bulkier than the duplex, triplex,
and four -plex guidelines suggested by the Land Use Plan Map.
Therefore, a waiver from Ordinance 1035 is required before we
can process your building permit any further. You may obtain
a copy of the waiver form from this office or you may call and
we will send one to you.
If you have any questions regarding this matter, please do not
hesitate to call.
Respectfully, j\Vbtbfrut4
1 i ed . Satterstrom
Planning Supervisor
FNS /ch •
cc: Frank Todd
6230 Southconter Boulevard y Tukwila, Washington 98188 U (206) 2.12 -2177
Schneider construction company, inc.
Koll Commerce Center • Andover Park • 665 Strander Boulevard • Tukwila, Washington 98188 • (206) 243 -5578
effective 4/15/78 (206) 575 -1510
,May 11, 1978.
Mr. Kjell Stoknes, Director.
Office of Community Development
City of Tukwila
6230 Southcenter Boulevard
Tukwila, WA 98188
Subject: Proposed 65th Avenue South Apartments
Dear Mr. Stoknes:
Following up on my April 27, 1978 letter to you, I am enclosing:
A) Two sets of our proposed construction.
B) Engineering Certification of Compliance with Soils Report #782 -49.
Our revised site plan shows the location of our buildings in compliance
with the soils report. It also shows adequate land area to accomodate
the structures, parking and other pertinent zoning requirements and
set backs.
In addition, the buildings have been located and staked on the site, in
order to provide a visual demonstration of compliance with the soils report
and zoning requirements.
Having met the conditions expressed in your March 30, 1978 letter to me,.
I am requesting that you proceed with our building permit application with
utmost haste.
GES /bjm
cc: Richard R. Wilson
STERLING ENGINEERING AND CONSTRUCTION .
665 STRANDER BOULEVARD
TUKWILA,,WASHINGTON '.98188
May 11,.1978
Mr.',;Gerald :E. Schneider
665 ;.',Strander Boulevard
:Tukwila, WA 98188
Subject: Proposed Apartment Construction
65th Avenue, South, Tukwila
Dear Jerry:
I have reviewed the subject. plans, drainage provisions and.
setbacks. The provisions shown and.indicated on Roger Newell's
drawings dated 5/11/78 are in conformance with., Cascades' soils
report . 4/782 -49,
Sincerely, • 4�'PE WASh 46trk
B1oBs 'o
w
P. E. #0016936 1) 9 cat ot� ?��
1sT
�..4, N A •,r•0: —
3 May 1978
CITY of 'TUKWILA
OFFICE of COMMUNITY DEVELOPMENT
Mr. Richard Wilson
403 Columbia Street
Seattle, Washington 98104
RE: Schneider Apartment Complex proposed on 65th Avenue South north of and
adjacent to Canyon Estates.
Dear Mr. Wilson:
This is to confirm our earlier conversation that the method upon which you are
proceding is consistent with the requirements of Resolution 489 and a waiver for
the development does not appear to be required.
This statement is made assuming the following items are satisfactorily done:
1. The development is constructed pursuant to the soils investigation that
was prepared for the City of Tukwila.
That no area within ten (10) feet of the bluff on the east end of the
property is to be disturbed.
3. That all runoff from impervious surfaces and buildings on the site will
be pipelined and run westerly into the City's storm water system.
4. That the proposed development meets all the requirements of the Ordinances
as administered by the various departments within the City of Tukwila.
It is my understanding that Mr. Schneider intends to redesign the buildings so
that there will be no disruption to the area located within ten (10) feet of the
slope on the eastern edge of the property. Also that all drainage will be pipe -
lined westward of the property and that the development will be done consistent
with the soils report prepared for the City of Tukwila. Under these conditions,
we will process the building permit in the normal manner as we do all other permits.
Very truly yours,
'r
Kjell Stoknes, Director
Office of Community Development
KS /ch
cc: Mayor Bauch, Pieper
6230 Southccntor Boulevard Y Tukwila, Washington 98288 N (206) 292 -2177
-
O$FICE MEMO
CITY OF TU KW I LA
March 3, 1978
TO: Al
FROM: Doris bt
SUBJECT: Test holes on Schneider development site, 65th Ave. So. & So. 152nd
During a telephone conversation with Dave Nelson, Cascade Testing Labs, I have
the following information -- preliminary -- prior to the issuance of their report:
The site is fairly stable with the exception of test hole site 4; the existing
buildings in the area show no sign of stress. Test hole 4 is of concern because
the material in the area is not uniform.
Recommend that a 10 -foot setback is adequate for the site except in the area of
test hole 4 where 25 -foot setback if recommended. For foundations, for the general
site, recommend 5 -foot depth for bearing area and use 2000 psf soil bearing pressure.
For the test hole 4 site, recommend at 25 -foot setback with 5 -foot depth for founda-
tions and reduce the bearing pressure in that area to 1500 psf.
Main concern is the control of drainage for ground water. Roof and foundation
drains should be directed toward street; catch basins will have to be sloped
away from the bank and no . local ponding, even in asphalted areas, will be
allowable.
June 16, 1977:
June 23, 1977:
June 30, 1977:
SEQUENCE OF EVENTS `'' OCD: 1/19/78
SCHNEIDER APARTMENT PROPOSAL
Building permit applied for and $701 plan check fee paid.
(Receipt is 6641) Two sets of drawings were received adequate
to meet building code requirements.
One set of drawings sent to Fire Department for reivew.
Environmental questionnaire for project was submitted. Ordi-
nance 986, Section 9 (1) states: "No application shall be con-
sidered complete with the environmental checklist."
July 6, 1977: Mr. Satterstrom called Mr. Schneider and informed him that Al
Pieper and he had visited the site and we were requiring him to
submit drawings depicting how the building would be supported on
the east side. Also mentioned that Resolution #489 might have
to be complied with here. Since some of the building overhung
the steep slope, Mr. Schneider said he would be in next week
with revised drawings.
July 18 - 22, 1977: Approximately during this time, Schneider came in and submitted
drawing showing how building sat on concrete pilings on east
side. He was informed at this time that waiver from #489 was
required. Schneider gave.no indication that he wished to pur-
sue a waiver. At this time the environmental questionnaire was
ruled unnecessary since one was not required for a waiver to
resolution #489. He was informed that the $50 fee for the envir-
onmental questionnaire could be refunded if he wished. He did
not request the refund.
July 25 - August
31,; 1977:
September 19, 1977:
September 22, 1977:
October 13, 1977:
October 19, 1977:
October 19, 1977:
October 20, 1977:
October 28, 1977:
Schneider in and out of office. on another matter at 65th Avenue
and Southcenter Boulevard. Finally, letter written to him (August
31, 1977) putting into writing what had been discussed at several
junctures either over phone or in person, that is, that a waiver
to resolution #489 was required.
Comprehensive Plan adopted and Ordinance 1035 adopted same night.
Ordinance #1035 published in Record Chronicle as required by law.
City receives revised site plan showing buildings setback 'further
from slope.
Mr. Satterstrom talked this day with Larry Hard and it was deter-
mined that Schneider had no "vested rights" under Resolution #489
by virtue of his inaction.
Since, pursuant to ordinance #1035, a full application was on
file, a negative declaration was made on the environmental
questionnaire.
Mr. Satterstrom talked with Schneider on phone informing him of
1035 waiver necessity.
Waiver application to Ordinance #1035 received and accepted by City.
,.J , SEQUENCE OF EVENTS
SCHNEIDER APARTMENT PROPOSAL
November 14, 1977:
November.
November
December
December
17, 1977:
21, 1977:
5
-9 1977:
15, 1977:
December 21, 1977:
January
City Council review waiver request in committee -of- the - whole.
Referred to next regular council agenda.
Date of landscape plan received by City.
Motion to approve waiver failed. City Council referred the
waiver to the Planning Commission for a density recommendation:
Planning Staff prepares staff report, analyzes Comprehensive Plan
and determines that 24 units would be allowed by plan.
On Planning Commission agenda. Continued until December 21, 1977.
Planning Commission recommended a density of 36 units for the
entire site.
1978: City Council reviews Planning Commission recommendation and
Schneider waiver and schedules for next meeting.
City Council considered the waiver at a regular meeting. Motion
to approve waiver fails. Referred to next committee -of- the -whole
meeting.
January 16, 1978:
January 23, 1978:
February 6, 1978:
Committee -of- the -whole meeting. Action,to be determined.
First upcoming meeting the Council can take action on the matter.
24 March 1978
CITY of TUKWILA
OFFICE of COMMUNITY DEVELOPMENT
Schneider Homes, Inc.
665 Strander Boulevard
Tukwila, Washington 98188
ATTN: Mr. Gerald Schneider
RE: Building Permit Application #77 -00
Dear Mr. Schneider:
This office has reviewed the drawings submitted in association with the above -
referenced application.,
Ordinance #1041 granting the C -1 classification of this property required Plan-
ning Commission review of development plans to "ensure the development design
complements the residential neighborhood." The Planning Commission approved .
revised development plans at their regular meeting conducted 19 December 1977.
Those plans reflect a post - development cross - section significantly different than
that depicted in application #77 -00. Specifically, the mounding of the foundation
area indicated in the permit drawings differs greatly from the below -grade first
floor depicted in the plans approved by the Planning Commission.
As you are well aware, considerable concern was expressed throughout the rezone
and plan review meetings regarding the effective height of this building and its
impact to the surrounding residential neighborhood. Inasmuch as this office
deems the permit drawings reflect a significant revision to the Planning Commission -
approved plans and the effect to the residential neighborhood is of known concern,
this office is unable to authorize issuance of the building permit.
Should you desire to pursue this matter, options available to you include:
A. Request Planning Commission review of the new drawings;
B. Revise the drawings to reflect the post - development cross - section depicted
in the plans already approved by the Planning Commission;
C. File written appeal of this administrative decision to the Board of Adjust-
ment within 30 calendar days of receipt of.this letter.
Please contact me at your convenience should you have any questions.
Si ncdrely,
A
G• r " Cru rchfi el d
Assistan Planner
GC /ch
cc: Dirr,QCD
g Off SENT CERTIFIED MAIL
6230 Southcenter Boulevard r Tukwila, Washington 98188 • (206) 242 -2177
C.
30 March 1978
CITY T LIKVI LA
OFFICE: ar COMMUNITY GEVCLOPMENT
Mr. Gerald E. Schneider
665 Strander Boulevard
Tukwila, Washington 98188
RE: Your proposed apartment complex on 65th Avenue South.
Dear Mr. Schneider:
As you may remember, the City Council at an earlier meeting, decided that a .
waiver to Ordinance #1035 was not required due to the time you submitted your
building permit application. Their action, however, was to refer it back to
the administration to determine if it required a waiver under resolution #489.
The administration's decision was to have a testing laboratory conduct a soils
investigation and to use that in determining if a waiver to resolution #489 was
required. We contacted you and got a release allowing Cascade Testing Laboratory
to go on your site to conduct the study. We are now in receipt of that study
which includes setback recommendations and foundation design recommendations
for the proposed structure.
In looking over your proposal, it is apparent that there is proposed excavation
that will occur in areas in access of 25% slope. This is not consistent with
Section 4.D.1 of resolution #489 and consequently a waiver is required.
I will reverse this requirement for a waiver if your site plan will show that
there will be no disruption to any of the land, and no grading done, at any
point within 10 feet of the top of the steep slope and no disruption to the
slope below the top. In addition, we will need the following information before
we will be in a position to issue the building permit:
1. A revised site plan showing the exact location of the buildings. This
must demonstrate compliance with the soils reports as far as setbacks go.
2. A certification by a professional engineer registered in the State of
Washington to the effect that the proposed development is in compliance
with the soils investigation report on the property submitted to the
City by Cascade Testing Laboratory.
3. Varification that there is actually adequate land area to contain the
proposed structures and parking lot recognizing the limitations of set-
backs, landscape area, and other restrictions of the property.
6230 Soutl:ct• :Iter Boulevard u Tukvi1a, Washi:Iton 93283 11 (206) 2:2 -2177
,fr. Gerald E. Schnei
Page'2,
30 March1978
As you can see, the burdw is now, .upon you to decide whether you want to pursue
a waiver or to modify your proposal to . not require a waiver. I will take no
further action on this application nor do any processing on it until such time as
I have received information back from you in writing indicating which direction
you intend to go. I,have included a copy of the soils investigation from Cascade
Testing Laboratory and a copy of resolution #489 with the application form should
you wish to pursue a waiver application.
If you have any questions on this or if you want to set up an appointment to
:discuss it, I would be happy to do so.
Very truly yours
e 1 :Stoknes, Director
Off ce of Community Development
cc: Mayor Bauch
Al Pieper
Attachments: Resolution #489
Soils Report
Application for Waiver
January 16, 1978
7:00 P.M.
FLAG SALUTE AND
CALL TO ORDER
ROLL CALL OF
COUNCIL MEMBERS
OFFICIALS IN
ATTENDANCE •
MINUTE APPROVAL
VOUCHER APPROVAL
APPOINTMENTS
Finance Director:
Ron F. Swanson
Public Works
Director:
Terence R.
Monaghan
79/
TUKWILA CITY COUNCIL
REGULAR MEETING Tukwila City Hall
Council Chambers
MINUTES
Mayor.Bauch, presiding, led the Pledge of Allegiance and called the
Regular Meeting of the Tukwila City Council to order.
LIONEL C. BOHRER, MABEL J. HARRIS, GEORGE D. HILL, Council President,
J. REID JOHANSON, DANIEL J. SAUL, DWAYNE D. TRAYNOR, GARY L. VAN DUSEN
LAWRENCE HARD, Deputy City Attorney; KJELL STOKNES, OCD Director;
RICHARD WILLIAMS, Acting Public Works Director; IIAXINE ANDERSON, City
Clerk.
MOVED BY HILL, SECONDED BY TRAYNOR, THAT THE MINUTES OF THE REGULAR
MEETING OF JANUARY 3, 1978 BE APPROVED AS PUBLISHED. MOTION CARRIED.
MOVED BY HILL, SECONDED BY TRAYNOR, THAT THE MINUTES OF THE SPECIAL
MEETING OF JANUARY 9, 1978 BE APPROVED AS PUBLISHED. MOTION CARRIED.
MOVED BY HILL, SECONDED BY TRAYNOR, THAT THE VOUCHERS BE ACCEPTED AND
WARRANTS BE DRAWN IN THEIR RESPECTIVE AMOUNTS. *
Mayor Bauch withdrew Vouchers No. 4798 and 4817 from payment. They
concern the uniform allowance for the Fire Chief and the Fire Marshal.
* MOTION CARRIED.
Final 1977 Expenditures: Vouchers No. 4743 - 4782
Current Fund 4743 - 4763
Street Fund 4764 - 4767
Water Fund 4768 - 4775
Sewer Fund 4776 - 4782
$ 9,100.94
575.13
11,824.25
12,126.12
$33,626.44
1978 Expenditures: Vouchers No. 4783 - 4921
Current Fund 4783 - 4890
Street Fund 4891 - 4898
Fed.Shared Rev. 4899
City Hall Const. 4900 - 4904
Water Fund 4905 - 4911
Sewer Fund 4912 - 4921
LID 27 C 38 & 39 $9,852.50
$ 38,680.60
1,704.01
368.90
57,629.24
1,486.11
10,460.67
$110,329.53
Rev 12 $9,852.50
Letter from Mayor Bauch dated January 12, 1978 was read for the record.
Mayor Bauch is asking Council to confirm Mr. Ron F. Swanson as Tukwila's
first Finance Director.
MOVED BY HILL, SECONDED BY MRS. HARRIS, THAT COUNCIL CONCUR WITH THE
MAYOR'S RECOMMENDATION OF RON F. SI•IANSON FOR FINANCE DIRECTOR.
MOTION CARRIED.
Mayor Bauch's letter presenting Mr. Terence R. Monaghan to Council to
fill the position of Public Works Director was read for the record.
MOVED BY HILL, SECONDED BY MRS. HARRIS, THAT COUNCIL CONCUR WITH THE
MAYOR'S APPOINTMENT OF TERENCE R. MONAGHAN AS PUBLIC WORKS DIRECTOR. *
Mayor Bauch pointed out to Council that the proposed budgeted salary
was at Grade 1, Step 1 but he has offered Grade 1, Step III for this •
position.
* MOTION CARRIED
TUKWILA CITY COUNCIL REGULAR1 _ETING
January 16, 1978
Page 2
PUBLIC HEARINGS
Cable TV Rate
Increase
This being the time and date advertised, the Public Hearing is being
held on a rate increase proposed by TelePrompTer Cable TV. Mayor
Bauch explained that the franchise allows TelePrompTer to raise the
rates but also gives the City Council the right to protest if they
find the increase unfair.
Mayor Bauch declared the Public Hearing open. Mr. Jim Hurd, Office of
Cable Communications, offered to explain the rate increase if there
were any questions. There being no questions or comments from the
audience, Mayor Bauch declared the Public Hearing closed.
PETITIONS, COMMUNICATIONS, APPEALS AND SIMILAR MATTERS
Claim for Damages: Submitted claim for damages arose over an accident involving the
Karen Smallbeck claimant, Karen Smallbeck, and a Tukwila Police vehicle. Repair
estimate of $227.66 is below the $250 deductible provided by the
City's existing liability coverage.
John McFarland, Administrative Assistant, recommended that the claim
be awarded in the amount of $227.66.
OLD BUSINESS
Discussion on
density for
Schneider Apts.,
65th Ave. So.
MOVED BY TRAYNOR, SECONDED BY VAN DUSEN, THAT THE CITY PAY THE CLAIM
FOR DAMAGES. MOTION CARRIED.
MOVED BY HILL, SECONDED BY VAN DUSEN, THAT COUNCIL CONCUR WITH THE
PLANNING COMMISSION'S RECOMMENDATION OF 36 UNITS. *
Richard Wilson, Attorney for Schneider Homes, asked to speak against
the motion as Mr. Hill has phrased it and explained his reasons why.
Schneider applied for a Building Permit for 48 units on 65th Ave. South
between the Maple Crest and Canyon Estates Apartments. As a clear
legal matter, they feel they are entitled to a building permit for the
full 48 units. We have gone through the requirements for a waiver
under Resolution #1035, but under protest. This application was filed
on June 30, 1977 before, both the adoption of Resolution #1035 and
the Comprehensive Plan. If any thing applies it may be old Resolution
#489. The law in Washington is very clear. It says that if the
owner of a piece of property applies for a building permit under its
current zone the laws that are in effect at the date of application are
the ones that have to apply. Therefore, Resolution #1035 can't be
applied to this one.
Mr. Wilson continued to explain that this is good apartment project and
it makes sense for that location. It lies between two high density
developments. The proposed plan is for attractive, low apartments.
The soils report is excellent, there is no problem with building.
The plan was reduced by six units to move it back further from the
top of the slope. The development fronts on a major collector arterial
street.
Mr. Wilson stated that 36 units are not economically feasible and he
asked the Council to approve the waiver to Resolution #1035 for a full
48 units.
Councilman Bohrer asked, why 48 units? Mr. Wilson explained that this
represents a basic good return on the property and gives a decent
layout of units while it still provides for adequate parking
Councilman Traynor asked about the density per acre and Mr. Wilson
said the number is between the Canyon Estates and Maple Crest - Canyon
Estates 24.9, Maple Crest 18.8 and theirs is 22.
Kjell Stoknes, OCD Director, commented that the application before
Council is for 48 units and he felt Council is obligated to act on this,
not on the 36 units.
TUKWILA CITY COUNCIL REGC. tR MEETING
January 16, 1978
Page 3
OLD BUSINESS - CONTINUED
Discussion on
density for
Schneider Apts.,
65th Ave. So. -
Continued.
Councilman Hill explained that, since this proposed development lies
between two high density apartment complexes the applicant might have
a problem renting the units if they are at a lower density and higher
quality. We can't penalize the applicant when he is already quite a
number of units below the maximum for the present zoning.
Pttorney Hard sited a State Supreme Court opinion that involves a piece
of property in Seattle. The case concerned vested rights and the court
says that an applicant for a building permit has vested rights at the
time they file the permit and the City can't require new procedure
because the code was changed after the permit was filed. This opinion
might have some bearing on this case. The applicant is saying they
have the right to proceed under the requirements of June 1977 without
regard to Resolution #1035.
Councilman Van Dusen asked if the City delayed the granting of the
building permit. Kjell Stoknes reviewed the order of events as they
happened in the processing of this permit. The building permit
application was received on June 30, 1977. In July the applicant was
notified that the City wanted drawings to show how the building
would be supported on the east (slope) side and also that Resolution
#489 might have to be complied with. The applicant submitted the
drawings and at that time was notified that the waiver to #489 was
required. In late August a letter was mailed reminding Mr. Schneider
that he still needed the waiver to #489. At that time, he was also
notified that if the buildings were set back further from the bluff
a waiver may not be needed. On September 19, 1977 the Comprehensive
Plan and Resolution #1035 were adopted. Shortly after, the applicant
was notified he needed a waiver to Resolution #1035. At this time, Mr.
Schneider had not filed the waiver to Resolution #489.
Councilman Johanson asked if the City requires drawings be submitted
at the time an applicant files for a building permit and was told
they do.
Kjell Stoknes explained that in this case it is a matter of which comes
first; the waiver to Resolution #489 or the building permit processing.
In this case the waiver to #489 has to come first to determine if the
Building Official can accept the permit application.
Attorney Hard explained that there are two issues here - the vesting
question and the question of location. The site is between two existing
developments.
Attorney Wilson stated that he feels there was confusion, uncertainty
and lack of communication on both sides. From their standpoint, they
did not need a waiver from #489. He continued to explain their position,
Councilman Harris asked if it was after the building permit application
was filed and it was determined the buildings were too close to the
bluff that they were told the waiver was needed. Mr. Wilson acknowledge(
that he. believed this is what the Planning Department decided.
Mayor Bauch asked if the City accepted the fee for the building permit
and was told no, the waiver requirement has to be satisfied first.
Councilman Bohrer asked if the applicant did not file his waiver to
Resolution #489 before the Comprehensive Plan and Resolution #1035.
were passed, then proceeded with the waiver under Resolution #1035, did
he waive his rights to vested interest under Resolution #489 and the
original zoning? Attorney Hard said if the application under Resolution
#1035 was filed "under protest" clearly there would not be a waiver.
The applicant is saying he does not need a waiver to either Resolution
#489 or #1035. 1035 was not in effect at the time of application and
the property does not meet the conditions described in #489.
TUKWILA CITY COUNCIL REGULAR k tTING
January 16, 1978
Page 4
OLD BUSINESS - CONTINUED
Discussion on
density for
Schneider Apts.,
65th Ave. So. -
Continued
Mayor's letter to
Council regarding
Attorney's
opinion on Jack
Anderson property
in McMicken
Heights
RECESS:
8:25 P.M. -
8:35 P.M.
NEW. BUSINESS
Election of
Council President
for 1978
Councilman Johanson asked if the steep slope is included in the calculatic
of the density and was told that it is.
Attorney Wilson stated that they would be glad to apply, "under Protest ",
for a waiver under Resolution #489. This is a valid, worthwhile project.
Kjell Stoknes recommended to Council that they vote No on the motion
on the floor then vote on the waiver as presented.
* MOTION FAILED
MOVED BY HILL, SECONDED BY VAN DUSEN, THAT COUNCIL GRANT THE WAIVER
TO RESOLUTION NO. 1035. *
Councilman Hill asked what happens if the waiver is granted? Attorney
Hard explained that it will allow them to proceed with the building
permit under the usual manner, following all requirements.
* MOTION FAILED WITH HILL AND VAN DUSEN VOTING YES.
Councilman Traynor stated that Council needs more discussion on this
as there are still concerns that have not been answered.
Mr. Schneider explained the procedure he has followed in applying for
the waiver and that he did pay the plan check fee at the time of
application.
MOVED BY TRAYNOR, SECONDED BY VAN DUSEN, THAT COUNCIL REFER THIS ITEM
TO THE COMMITTEE OF THE WHOLE MEETING ON JANUARY 23, 1978. *
He suggested a field trip to the site prior to the meeting.
Attorney Hard read from the Supreme Court opinion, "the State Environmenta'
Policy Act of 1971 and the other statutes and Ordinances administered
by the Building Department serve legitimate functions none of which
is intended to be used by a government agency to block the construction
of projects mearly because they are unpopular ".
* MOTION CARRIED.
Mayor Bauch called for this item, but there was no comment.
MOVED BY HILL, SECONDED BY SAUL, THAT COUNCIL RECESS FOR TEN MINUTES.
MOTION CARRIED.
Mayor Bauch called the meeting back to order with all Council Members
present as previously reported.
In accordance with Ordinance No. 1048, the Council shall elect a new
president at the second regular meeting in January of each year.
Councilman Traynor commented that Council President Hill has done a good
job of representing the Council. He has helped improve the image of the
Council.
TRAYNOR NOMINATED COUNCILMAN SAUL FOR COUNCIL PRESIDENT FOR THE YEAR 1978
NOMINATION SECONDED BY BOHRER.
HILL NOMINATED COUNCILMAN VAN DUSEN FOR COUNCIL PRESIDENT. NOMINATION
SECONDED BY MRS. HARRIS.
Councilman Hill suggested the voting be done by ballot.
TUKWILA CITY COUNCIL REGULAR MEETING
January 16, 1978 •
Page 5
NEW BUSINESS - Cont.
Election of Councilman Johanson commented that he would like the Council'President
Council President to be a person that could coordinate the Council. This job is one that
for 1978 - Cont. takes considerable time.
BALLOTS WERE CAST. MAYOR BAUCH ANNOUNCED THAT COUNCILMAN VAN DUSEN WILL
BE PRESIDENT FOR THE YEAR OF 1978.
Councilman Van Dusen thanked Council for their confidence in him.
RESOLUTIONS
Resolution #610 - MOVED BY VAN DUSEN, SECONDED BY HILL, THAT THE PROPOSED RESOLUTION BE
authorizing the READ BY TITLE ONLY. MOTION CARRIED.
Mayor to enter into
a contract with Deputy City Attorney Hard read a resolution authorizing the mayor to enter
Stevens, Thompson, into a contract with Stevens, Thompson and Runyan„ Incorporated for design
and Runyan for and preliminary engineering on a signal system at South 180th and Andover
signals at Park West.
South 180th and
Andover Park West MOVED BY VAN DUSEN, SECONDED BY HILL, THAT RESOLUTION NO. 610 BE ADOPTED
AS READ. MOTION CARRIED.
Resolution #611 - MOVED BY VAN DUSEN, SECONDED BY HILL, THAT THE PROPOSED RESOLUTION BE
Transfering certain READ BY TITLE ONLY. MOTION CARRIED.
Community Develop-
ment Block Grant Deputy City Attorney Hard read a resolution transfering certain Community
some monies from Development Block Grant some monies from an approved trails development
an approved trails project to undergrounding assistance for low and moderate income persons.
development project
to undergrounding MOVED BY VAN DUSEN, SECONDED BY HILL, THAT RESOLUTION NO. 611 BE ADOPTED
assistance for AS READ.*
low and moderate
income persons Mayor Bauch explained that the City Attorney determined that Revenue
Sharing monies cannot be used for assistance for low income families. The
Block Grant money is eligible for this use.
* MOTION CARRIED.
Proposed Resolution MOVED BY VAN DUSEN, SECONDED BY HILL, THAT THE PROPOSED RESOLUTION BE READ
establishing a wage BY TITLE ONLY. MOTION CARRIED.
and salary plan
Deputy City Attorney Hard read a resolution establishing a wage and
salary plan for all full -time permanent positions with the City of Tukwila
and providing for the administration of such plan.
MOVED BY HILL, SECONDED BY JOHANSON, THAT THIS ITEM BE PLACED ON THE
AGENDA FOR THE COMMITTEE OF THE WHOLE MEETING OF JANUARY 23, 1978.
MOTION CARRIED.
DEPARTMENT REPORTS
Mayor's Report Mayor Bauch called everyone's attention to the plaque that will be
installed at Fort Dent.
MISCELLANEOUS AND FURTHER AUDIENCE COMMENTS
Jack Anderson Attorney Hard noted that Mr. William H. Goucher was in the audience to
property - hear Item 9b, letter concerning Jack Anderson property in McMicken Heights
McMicken Heights Mayor Bauch explained that he had written a letter to the Council concernir
the proposed development. Council had the chance to discuss it but
chose not to.
TUKWILA CITY COUNCIL REGULAR MEETING
January 16, 1978
Page 6
MISCELLANEOUS AND FURTHER AUDIENCE COMMENTS Cont.
Fire Department Councilman Traynor commended the Fire Department for-their physical..
fitness program.
EXECUTIVE' SESSION:'
9:00 P.M. -
9:30 P.M.
MOVED BY SAUL, SECONDED. BY HILL, THAT COUNCIL GO INTO EXECUTIVE SESSION.
CARRIED.
Executive Session was called by the City Attorney to discuss Foster
Golf Course.
MOVED BY TRAYNOR, SECONDED BY SAUL, THAT THE EXECUTIVE SESSION BE CLOSED.
.MOTION CARRIED.
Regular Meeting Council went back into'Regular Session.
Foster Golf Course MOVED BY MRS. HARRIS, SECONDED BY VAN DUSEN, THATTHE ALIMENTS BE
OFFERED 2.1 MILLION DOLLARS FOR THEIR PROPERTY; IF THEY DON',T ACCEPT,
THE PROPERTY WILL BE CONDEMNED. MOTION CARRIED. -
ADJOURNMENT
9:40 P.M. MOVED BY SAUL, SECONDED BY TRAYNOR, THAT THE REGULAR MEETING OF THE
TUKWILA CITY COUNCIL ADJOURN. MOTION CARRIED.
e ,.:, r t,r,C. ie3.'r. .:.tUin n x.�a .ii..,.Y:::;•i�i ;'tk::G';�.f�'l::a'r :.t :hut ; "LS' :F.�%hi
PLANNING
PARKS &
RECREATION
BUILDING
CITY of TUKWILA
OFFICE of COMMUNITY DEVELOPMENT
TO. Al per, Building Official
FROM Fre N. Satterstrom, Planning Supervisor
SUBJECT: Sch eider Apartments Building Permit
Please attach the following requirements to the above - referenced building
permit:
L. Provision of 72 useable parking stalls on- site.
'., Installation of 4 -foot high decorative fence and low
evergreen shrubbery or groundcover at parking lot entrance,
pursuant to TMC 18.56.070.
▪ No area within ten (10) feet of the top of the bank, as
indicated on the site plan dated 25 May 1978, is to be.
disturbed.
• Front yard and side yards shall, be landscaped:`
,'.6230,Southcenter Boulevard • .TuJWila,.Washington 98188 • (206) 242 -2177.
ROGER H. NEWELL; AIA ARCHITECT
DATE 610/5/70
7v
PROJECT
TO
_111111-
MINIMUM
1102 19TH AVENUE EAST SEATTLE 98112 (206) 322 -1192
JOB #
, COPIES
GI { ! OF - 0.31c44b6-
DATE DESCRIPTION
REMARKS
li LoIe,iM 1Op1 oniCi l'F)
approved
site plan
vicinity map legal description
T.
iiaa wY
•
•
w`
•L4 `fi 1b -,� -
x& ....` �..... ,,,,,, r� ....,�.
t"
`_. , • -*".
_.____� ' ...,.....�.....,L..
TT.-
.••
;1
;
111ret ..,KM.4
•, .- "•"mss•: * •
•
1.
� -- r � a \ r .r • ' may- : ri •
�, .;,,..• r ...., i *- 3•-"' l�' ) i
• .._. ...._._....o...............�.._
_ .�.�.......�.....
hwai
1
11 !
4
TTITT,71riiT
r;- stia.•�svtw=wl
.
)i?': iI -
r-
-------- r..r,•,
r
11 ; i
yl
1
-a
•
i
i
.q-
J
'1 I
.. _._ .
—
I
•.1
/•
r7' °`- -
A'. -. �' .
elevation plan section
elevations
plan
plan
foundaiton plan
footing detail
typical sections
elevations
floor structure roof structure
framing plan
floor plan