HomeMy WebLinkAboutCOW 2008-01-28 Item 4G - Bid Award - Lakeside Paving Company for Interurban Avenue South Pavement Repair for $28,574 COUNCIL AGENDA SYNOPSIS
<c Initials ITEM NO.
vz
1 1t, Meetin Date Prepared by Mayor's review 1 council review
,u'S,�.. I 1 01/28/08 1 BG
02/04/08 1 BG V
1 1 1 I I I
ITEM INFORMATION
I CAS NUMBER: 08-011 I ORIGINAL AGENDA DATE: JANUARY 28, 2008
AGENDA ITEM TITLE Bid Award for Interurban Ave 5 Pavement Repair Project
CATEGORY Discussion Motion Resolution Ordinance Bid Award Public Hearing Other
Mtg Date 01/28/08 Mtg Date Mtg Date Mtg Date Alts Date 02/04/08 Mtg Date Mt1 Date
SPONSOR Council El Mayor Adra Svcs DCD Finance Fire Legal Pe'R Police PW
SPONSOR'S The recent Fort Dent /Interurban Ave S sewer project left a very rough pavement
SUMMARY surface. Six bids were received for this overlay project from the Small Works Roster. The
low bid of $28,574.00 was from Lakeridge Paving Company. Lakeridge Paving has
completed several recent projects for the City, including the 2007 Overlay and Repair
Project and has performed very good work.
REVIEWED BY COW Mtg. CA &P Cmte F &S Cmte Transportation Cmte
Utilities Cmte Arts Comm. Parks Comm. El Planning Comm.
DA'l't: 01/15/08
RECOMMENDATIONS:
SPONSOR /ADMIN. Award contract to Lakeridge Paving Co.
COM IITi'L.E Unanimous approval; forward to COW.
COST IMPACT FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$28,574.00 $700,00
Fund Source: 104.02 Commercial Streets Annual Overlay Repair (pages 44, 2008 CIP)
Comments:
MTG. DATE I RECORD OF COUNCIL ACTION
01/28/08 1
I
02/04/08 1
MTG. DATE I ATTACHMENTS
01/28/08 1 Information Memo dated January 9, 2008
Bid Tabulation
1 1 Map of Project Location
1 Transportation Committee Meeting Minutes from January 15, 2008
02/04/08 1
INFORMATION MEMO
To: Mayor Haggerton
From: Public Works Director
Date: January 9, 2008
Subject: Interurban Ave S Pavement Repair (14900 Interurban Ave S Vicinity)
Project No. 07 -RWO1
BID AWARD
ISSUE
Award the Interurban Avenue South Pavement Repair contract to Lakeridge Paving Company.
BACKGROUND
The recent Fort Dent/Interurban Ave South sewer project left a very rough pavement surface. While the
sewer contractor met the design and specifications for that project, the wearing surface is very rough and
trucks bounce over the bumps and rattle the windows at the Interurban Plaza building (14900 Interurban Ave
South).
ACTION TAKEN
After field reviewing the rough road situation, a design was completed for a small pavement repair project
(see attached vicinity map). The budget for this project will be the Annual Overlay and Repair Program.
Letters requesting bids were sent out to companies on the Small Works Roster qualified for this type of work.
Six (6) bids were received with Lakeridge Paving Company submitting the lowest bid at $28,574.00. The
remaining bids, from low to high, were received from Western Asphalt at $33,736.00, Watson Asphalt at
$35,900.00, Superior Asphalt at $43,225.00, Lakeside Industries at $52,600.00 and AA Asphalt at
$63,731.00. The bid tabulation is attached.
Lakeridge Paving Company has completed several recent projects for the City, including the 2007 Overlay
Program, and has performed very good work.
BUDGET AND BID SUMMARY
Bid Results Eneineer's Estimate Budget
Bid Amount $28,574.00 $30,000.00 $700,000.00
Contingency (10 2.857.40 3.000.00
Total 31.431.40 33.000.00 $700.000.00
RECOMMENDATION
Award the construction contract for the Interurban Ave. S. Pavement Repair project to Lakeridge Paving
Company in the amount of $28,574.00.
Attachment: Bid Tabulation
Vicinity Map
P :IPROJECTS\A. RW RS Projects107RWOl 2007 Overlay114900 Interurban SWR fix\Info Memo Bid Award IU Pvmt Rpr.doc
INTERURBAN AVENUE SOUTH PAVEMENT REPAIRS
07RW01
1
N .1 g
Z
W
0 0
a 1
I18_
ti U) Lu
2 I L' i 1.1.1 2
L M J`� Ce
�I Cea
-t4g L 4 AO effIGII MEI I i I I ll LL
Era
1
z
W
GI M
GO=
0
0
O
i
W
J 0?zw n
moa z m x NMI
r- m
w z r 3 5
CI 3 N V E a a a a
cc N BBRMM
Z
1 d w u-
L3 ,g 9
V♦ U z ozw� 1,a
Z �cc F ¢am
W o
Ww o s ®ooac•_
�C9��� z- z o
O GJ Q jQ J N o N o. rN
Z WZ J W d
�w Q
z Q Q a
Q >a� o
ili w ws
Q CC Al
Q 0
W C
W 2 o 8 g
N 3
a CI
kW re W z J
�a Ww Wo
IX Q ao Zo z v
CI c�a
m r4 m U m LLI
Z
CC O ul E.3
zm W rN rn w
Q -D o m O N
6 Q co
a
L,T,
Transportation Committee Minutes January 75. 2008 Pace 2
will adopt the applicable standards and meet state requirements. UNANIMOUS APPROVAL.
FORWARD TO JANUARY 28 COW.
D. Interurban Avenue Pavement Repair Bid Award
Staff has identified an extremely rough surface area on Interurban Avenue South near Fort Dent
Park. Historically this area has produced a rough roadway due to soil problems in there area. It is
likely that the worsening surface area is a result of the recent Fort Dent/Interurban Avenue South
Sewer Project.
1j
Staff is recommending pavement repair of the area and is seeking full Council approval to award a
bid in the amount of $28,574 to Lakeridge Paving Company for the project. UNANIMOUS
APPROVAL. FORWARD TO JANUARY 28 COW.
E. South 144 Street Improvements Contract Acceptance and Closeout
Staff is seeking full Council approval for project completion, contract acceptance and authorization
to release retainage for the South 144 Street Improvements which were completed on June 15, 2007.
This project boasts is the first officially marked and signed bike lane in the City of Tukwila.
UNANIMOUS APPROVAL. FORWARD TO JANUARY 22 REGULAR CONSENT AGENDA.
F. 2008 Transportation Issues
Staff prepared a list of issues that they believe will be brought to and addressed by the Transportation
Committee during 2008. Additionally, staff requested input from Committees member on issues the may
like to discuss during the year.
A lengthy discussion followed regarding traffic calming issues which were identified by staff as a
potential pnority for discussion. Interest existed on the Committee to revisit this issue during the year.
Committee members suggested additions for future discussions:
Identify the transportation needs of Tukwila residents located on the west side of the highway
to City services (i.e.: TCC, City Hall, City sponsored events and programs, etc) Explore
possible options for meeting these needs and identify budget funding if appropriate.
Address and discuss ways to accomplish the 2008 Council Goal Work together in
cooperation with nearby cities to address common problems in the Highway 99 corridor and
Military Road.
Consider a joint meeting with SeaTac's corresponding Transportation Committee to talk
about issues affecting both of our communities as well as share information and ideas.
DISCUSSION ONLY.
III. ANNOUNCEMENTS No announcements.
IV. MISCELLANEOUS Meeting adjourned at 6:30 p.m.
Next meeting: Tuesday, January 29, 2008 5:00 p.m. Conference Room #1
Committee Chair Approval
Minutes by K4M.