HomeMy WebLinkAboutCOW 2006-11-13 Item 4A - Resolution - Land Use Fee Schedule COUNCIL AGENDA SYNOPSIS
O i 2 s Initials ITEM NO.
Q t- 1%:1�+ Meeting Date 1 Prepared by Mayor's review 6puncil jview
kisk _�w 11/13/06 l h�-� 1 /C I
ITEM INFORMATION
CAS NUMBER: 06-129 I ORIGINAL AGENDA DATE: 10/16/2006
AGENDA ITEM TITLE Fee Resolution updating land use fees and adding three new fees for Wireless
Telecommunication Facility Permits.
CA t'EGORY Discussion Motion Resolution Ordinance Bid Award Public Hearing Other
Mtg Date 11/13/06 Mtg Date Mtg Date 11/20/06 Mtg Date Mtg Date Mtg Date Mtg Date
SPONSOR Council Mayor Adm Svcs DCD Finance Fire Legal P &R Police PIV
SPONSOR'S Staff is proposing all Planning fees be increased by approximately four percent for 2007.
SUMMARY Three new permit applications were created by the new Wireless Communications Chapter
and fees need to be provided for those permits.
REVIEWED BY COW Mtg. CA &P Cmte F &S Cmte Transportation Cmte
Utilities Cmte Arts Comm. Parks Comm. Planning Comm.
DATE: 11/06/06
RECOMMENDATIONS:
SPONSOR /ADMir Adopt Fee Resolution as submitted.
COiNEMITTEE Adopt Fee Resolution as submitted
COST IMPACT FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$N /A $N /A $N /A
Fund Source: N/A
Comments: N/A
MTG. DATE RECORD OF COUNCIL ACTION
MTG. DATE ATTACHMENTS
11/13/06 Staff Memo
Proposed Resolution
Last Year's Fee Resolution, Resolution No. 1603
Minutes from the November 6, 2006 Finance and Safety Meeting
N11Lq, /1
G ityulc;vv ila y
o; O of T Steven M. Mullet Mayor
4 ibt
Department of Community Development Steve Lancaster, Director
19
TO: Committee of the Whole
FROM: Steve Lancaster, Director
RE: Permit Fees
DATE: November 7, 2006
Issue
Last year when the City Council updated land use fees, the Council requested that fees be
revaluated on a regular basis. Additionally, the City has modified the land use review for
wireless telecommunication facilities which creates three new permits.
Background
The Mayor's 2007 budget includes an increase of four percent for general operation
expenditures. Staff is proposing all Planning fees be increased by approximately four
percent for 2007, as provided by the draft resolution, attached. Also attached for your
information is the fee schedule resolution for 2006.
Three new permit applications were created by the new Wireless Communications
Chapter. Staff proposes that the following fees be used for wireless applications:
Wireless Communication Facility, Minor $230
Wireless Communication Facility, Administrative $470
(This is the same fee that the City charges for design review)
Wireless Communication Facility, Major or Height Waiver $2,340
Request
(This is the same fee that the City charges for a CUP)
Finance and Safety
Finance and Safety recommended approval of the proposed fee scheduled after the
November 6, 2006 meeting.
Next Sten
Staff recommends that the draft resolution be forwarded to regular council for review and
approval.
6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 431 -3665
DRAFT
A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF TUKWILA, WASHINGTON, ADOPTING
A LAND USE FEE SCHEDULE.
WHEREAS, the City Council has requested that staff review and update fees on a
regular basis; and
WHEREAS, the City intends to update these fees on an annual basis with any
increases tied to growth in City expenses; and
WHEREAS, the Mayor's 2007 budget calls for a minimal general fund increase of
4% for general operations; and
WHEREAS, the City needs to provide permit fees for the new land use
applications created by the Wireless Telecommunication Chapter; and
WHEREAS, the City intends to periodically review the fees in comparison to those
charged by neighboring jurisdictions;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Land use permit and processing fees will be charged according to the following
schedule:
All other
LDR Zones
Type 1 I Appeal of Type 1 Decision $105 I $205
1 Boundary Line Adjustment $295 $525
1 Lot Consolidation $90 $175
1 Permanent Sign Permit $120 $120
Temporary Sign Permit $60 1 $60
1 Tree Permit and Exceptions (TMC 18.54.140) $25 I $25
Wireless Communication Facility, Minor
(TMC 18.71) $230 $230
Type 2 Administrative Design Review 1 $470 1 $470
Administrative Planned Residential
Development $585 $585
1 Appeal of Type 2 Decision $105 1 $205
1 Appeal of Sign Code Decision $105 1 $205
1 Binding Site Improvement Plan $1,170 $1,170
1 Code Interpretation $105 I $105
Environmentally Sensitive Areas Deviation
(TMC 18.45.080 and .100) $230 $350
C:\Documents and Settings\All Users Desktop \Kelly\MSDATA\Resolutions\Land Use Fee Schedule 11 -06.doc
NG:kn 11/6/2006 Page 1 of 3
Type 2 All other
Cont'd LDR Zones
Exception from Single Family Design
Standard $230 N/ A
1 Shoreline Substantial Development Permit 1 $2,340 1 $2,340 1
1 Short Plat (2-4 lots) 1 $585 1 $1,170 1
Short Plat (5 -9 lots) 1 $1,170 1 $1,170 1
Special Permission Cargo Container
(TMC 18.50.060) $230 $350
Special Permission Landscape Requirement
Deviations (TMC 18.52.020) $230 $350
Special Permission Parking and
Modifications to Certain Parking Standards
(TMC 18.56.065 .070) $230 $350
Special Permission Sign and Sign Area
Increase, except "unique sign" (various
sections of TMC Title 19) $230 $350
Wireless Communication Facility,
Administrative $470 $470
Type 3 1 Variance $700 1 $1,170
Type 4 1 Appeal of Type 4 Decision $105 1 $205
Conditional Use Permit $2,340 1 $2,340
Shoreline Conditional Use Permit $2,340 1 $2,340
Public Hearing Design Review $1,635 1 $1,635
1 Design Review Major Modification $470 $470
Parking Variance, Modification or Waiver
(TMC 18.56.130, .140) $230 $350
1 Reasonable Use Exception (TMC 18.45.180) $700 1 $1,170
$3,375 $3,375
$115 per $115 per
Subdivision Preliminary Plat (10+ lots) new unit new unit
Unique Sign Determination (TMC 19.28.010) 1 $230 1 $350
Wireless Communication Facility, Major or
Height Waiver Request $2,340 $2,340
Type 5 1 Comprehensive Plan Amendment 1 $1,170 1 $1,170
$2,900 $2,900
$115 per $115 per
Planned Residential Development new unit new unit
Rezone (Map Change) or Zoning Code Text
Amendment $590 $590
$1,170 $1,170
$60 per $60 per
Subdivision Final Plat (10+ lots) new unit new unit
1 Sensitive Area Master Plan Overlay 1 $1,170 1 $1,170 1
1 Shoreline Environment Redesignation 1 $1,170 1 $1,170
Unclassified Use Permit 1 $2,340 1 $2,340 1
C:\Documents and SettingsWl Users Desktop \Kell}hMSDATA1Resolutions\Land Use Fee Schedule 11- 06.doc
NG:kn 11/912006 Page 2 of 3
All other
Cont'd LDR Zones
Accessory Dwelling Unit
Other Approval /Inspection $105 2 N/A i
Pre application Meeting I $230 1 $230 1
Public Notice Mailing Labels 1 $105 $105
SEPA Checklist $590 $590
SEPA EIS Administrative Fee $1,170 $1,170
SEPA MDNS Appeal 1 $105 $205 1
SEPA Planned Action 1 N/ A $295 1
Shoreline Permit Exemption Letter 1 $0 $120
Zoning Verification Letter $0 $120
1 Pre application fee credited toward applications submitted within
90 days.
2 Fee would be waived through 12/31/2007 and not charged for new
units created with a building permit, because they would not require
any additional inspections.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUK■ILA, WASHINGTON,
at a Regular Meeting thereof this day of 2006.
ATTEST/ AUTHENTICATED:
Dennis Robertson, Council President
Jane E. Cantu, CMC, City Clerk
APPROVED AS TO FORM BY:
Filed with the City Clerk:
Passed by the City Council:
Office of the City Attorney Resolution Number:
C:\Documents and Settings\A11 UsecslDesktop \Kelly4MSDATA\Resolutions\and Use Fee Schedule 11- 06.doc
NG:kn 11/62006 Page 3 of 3
J
J� q t
4 ut ,f 2 f
1908
City of Tukwila
Washington
Resolution No. /6 03
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF TUKWILA, WASHINGTON, ADOPTING A LAND
USE FEE SCHEDULE.
WHEREAS, Tukwila's land use fees have remained unchanged since 2002, and
WHEREAS, the fees have not kept pace with increased City expenses to process
permits and provide services; and
WHEREAS, the City intends to update these fees on an annual basis with any
increases tied to growth in City expenses, and
WHEREAS, the City intends to periodically review the fees in comparison to those
charged by neighbormg jurisdictions,
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Land use permit and processing fees will be charged according to the following
schedule:
All other
LDR Zones
Type 1 I Appeal of Type 1 Decision $100 $200
1 Boundary Line Adjustment $285 $510
1 Lot Consolidation $85 $170
1 Permanent Sign Permit $115 $115
1 Temporary Sign Permit $55 555
1 Tree Permit and Exceptions (TMC 18.54.140) $25 $25
Type 2 1 Administrative Design Review $455 $455
Administrative Planned Residential
Development 5570 $570
Appeal of Type 2 Decision 1 5100 $200
1 Appeal of Sign Code Decision 1 5100 1 $200
1 Binding Site Improvement Plan J $1,135 I $1,135
f Code Interpretation 8100 5100
Environmentally Sensitive Areas Deviation
(TMC 18.45.080 and .100) 5225 $340
Exception from Single Family Design
Standard $225 NA
1 Shoreline Substantial Development Permit 52,270 1 $2,270 1
1 Short Plat (2 -4 lots) 1 5570 1 $1,135 1
1 Short Plat (5 -9 Lots) 1 $1,135 1 $1,135 1
Special Permission Cargo Container (TMC
18 50 060) 5225 53 40
C \Documents and Settings\AlL Users' Desktop \Ketty‘MSDATA\Resolotions\ Land Use Fee Scheduie.doc
NG:kn 3/17/2006 Page 1 of 3
II
All other
Cont'd LDR Zones
Special Permission Landscape Requirement
Type 2 Deviations (TMC 18.52.020) $225 $340
Special Permission Parking and
Modifications to Certain Parking Standards
(TMC 18.56.065 .070) $225 $340
Special Permission Sign and Sign Area
Increase, except "unique sign" (various
sections of TMC title 19) $225 $340
Type 3 1 Variance 1 $680 $1,135
Type 4 1 Appeal of Type 4 Decision 1 $100 $200
1 Conditional Use Permit $2,270 $2,270
1 Shoreline Conditional Use Permit 1 $2,270 $2,270
Public Hearing Design Review J $1,590 $1,590
Design Review Major Modification $455 $455
Parking Variance, Modification or Waiver
(TMC 18.56.130, .140) $225 $340
Reasonable Use Exception (TMC 18 45.180) $680 1 $1,135
$3,375 $3,375
$115 per $115 per
Subdivision Preliminary Plat(10+ lots) new unit new unit
1 Unique Sign Determination (TMC 19.28.010) 1 $225 1 $340 1
Type 5 1 Comprehensive Plan Amendment 1 $1,135 1 $1,135 1
$2815 $2815
$115 per $115 per
Planned Residential Development new unit new unit
Rezone (Map Change) or Zoning Code Text
Amendment $570 $570
$1,135 $1,135
$60 per $60 per
Subdivision Final Plat (10+ lots) new unit new unit
1 Sensitive Area Master Plan Overlay $1,135 1 $1,135
1 Shoreline Environment Redesignation $1,135 1 $1,135
1 Unclassified Use Permit 1 $2,270 1 $2,270
Accessory Dwelling Unit
Other Approval /Inspection $100 2 NA
1 Pre application Meeting 8225 1 $225 1
1 Public Notice Mailing Labels $100 $100
1 SEPA Checklist $570 $570
1 SEPA EIS Administrative Fee $1,135 1 $1,135
1 SEPA MDNS Appeal $100 1 $200
1 SEPA Planned Action NA $285
1 Shoreline Permit Exemption Letter $0 I $115
1 Zoning Verification Letter $0 $115
1 Pre application fee credited toward applications submitted within
90 days.
2 Fee would be waived through 6/1/2007 and not charged for new
uruts created with a building permit because they would not require
any additional inspections.
C\Documents and SettingsWl Users Desktop \Kelly\MSDATA\ResolutionsI Land Use Fee Schedule doe
NG:kn 3/17/2006 Page 2 of 3
PASSED BY THE CITY COUNCIL OF THE CITY 90F TUKWILA, WASHINGTON,
at a Regular Meeting thereof this r/,) day of �g� 2006
ATTEST/ AUTHENTICATED:
D ennis Robertson, Council President
J E. Cantu; CMC, City Clerk
APPROVED AS T• ?iRM BY:
9 Filed with the City Clerk. -a— /(o C
Passed by the City Council:
Offic c Ze ttorney Resolution Number: /(00
C /Documents and SettingsWl Users Desktop UCelty+MSDATA\Resolutions\Land Use Fee Schedule.doc
NG:kn 3/172006 Page 3 of 3
Finance Safety Committee
Nov. 6, 2006 5:00 p.m.
Present: Pam Carter, Chair; Jim Haggerton and Verna Griffin, Council members.
Rhonda Berry, City Administrator; Kevin Fuhrer Director of Finance; Steve Lancaster; Director
of Community Development; Brandon Miles, Assistant Planner; Jim Morrow, Director of Public
Works; Gail Labanara, Public Works Analyst; Viki Jessop, Director of Administrative Services;
Mary Miotke, IT Manager; Trish Kinlow, Court Administrator; Nick Olivas, Fire Chief; Loren
McFarland, Fire Lt.; Steve Rydeen, firefighter Joel Curl, firefighter; Diane Jenkins,
Administrative Assistant to the Council; and Chuck Parrish, community member.
Business Agenda
A. A resolution approving a land use fee schedule
Mr. Miles indicated that last year the Council decided it would be appropriate to review the land use fees
on a regular basis. The Mayor's proposed budget includes a 4% increase for general operation
expenditures. It is proposed to increase all planning fees by 4 He pointed out that three new fees
were included for wireless applications. Also, Mr. Miles commented that the $25 fee for tree clearing
will stay the same since that fee was adopted by ordinance and cannot be changed by resolution.
Unanimous approval to forward to 11/13 Committee of the Whole.
B. 2007 proposed property tax increase
Mr. Fuhrer conveyed that the City is in receipt of correspondence and preliminary levy limit worksheet
from King County. He reviewed how the levy is calculated. The City must submit its proposed
property tax levy by December 1. This will be discussed at the November 13 Committee of the Whole
meeting. It was proposed to submit an $11.2 million property tax levy based on the valuation of King
County Assessor. This incorporates the 1% limitation imposed by I -747 and captures new construction
and increases in utility values. The 2007 levy proposed is 2.5% over 2006. The levy is set at a higher
rate since you do not want to leave "money sitting on the table." When the final amounts are
determined, if necessary, the levy amount will be rolled back. He explained the impact of I -747.
Mr. Fuhrer continued and noted that in 2006, the rate was $3.03 per $1,000 assessed valuation. Under
the proposed levy amount, it will be $2.86 per $1,000 assessed valuation. Ms. Carter asked what was
the City's highest levy rate. Mr. Fuhrer replied $3.13. Mr. Parrish asked if the 1% limitation is based
on the previous year's levy amount. Mr. Fuhrer explained that it is based on the total levy amount,
excluding new construction. Ms. Berry noted that some residents may see more than a 1% increase.
Ms. Carter pointed out that there are many other items included under "property tax" on resident's
property tax statements schools, State, etc. Unanimous approval to forward to COW.
Status on Flooding
Mr. Morrow provided a status report on flooding within the City of Tukwila. 17 hot spots were
identified. There were the four areas still being monitored: 1) A detention pond behind Park Place on
Southcenter Blvd flooding was occurring due to the amount of water but the pond has gone down 12"
since this afternoon; 2) On S. 180, near Claim Jumper's, a pump broke down the other three pumps
are managing the load; 3) Strander and Andover Park W this handles all flows from the north part of
the City and ties into the Metro sewer main. There is a blockage on Metro's main, under the river.
Because of the blockage, the overflow is flowing into the City's system. Metro was not going to address
the situation until tomorrow but the City insisted that a contractor be brought in tonight. These pumps
are running at full speed; and 4) Green River is above flood stage 2 and heading toward 8,000 cfs. It is
expected to crest at 9,000 cfs tomorrow morning. High tide is at 4:00 a.m.