ITEM INFORMATION
I CAS NUMBER: 05-014 Ref. 04-155 I ORIGLNAL AGENDA DATE: FEBRUARY 7, 2005
AGENDA ITEM TrrLE Allentown /Foster Point Water Sewer Improvement Project Cost Saving Measures
CATEGORY Disaiftian Motion Resolution Ordinance Bid Award Public Hearing Other
Mcg Date 2 /7/05 elfig Dah Mtg Date ditg Doh Mtg Date lftg Date Mfg Date
'SPONSOR Counal Major Adm Sea DCD Finance Fin Legal POR Police PJV J
SPONSOR'S All six bids submitted for the Allentown /Foster Point Water Sewer Improvement Project
SLNLMARY were over the budgeted amount. Possible changes in scope to reduce costs include
itemizing road improvements (exempts most sales tax on labor equipment), eliminating
water line upgrades to Foster Point and Poverty Hill, using native soil instead of new,
imported gravel for foundation and backfill and eliminating Foster Point sidewalk. The
project will be rebid in February.
REVIEWED BY COW Mtg. CA&P Cmte F&S Cmte
Transportation Cmte
Utilities Cmte Arts Comm Parks Comm. Planning Comm.
DATE: 1/19/05
RECOMMENDATIONS:
SPONSOR /ADIQNN. Approve cost saving measures.
CO?di\HTIEE To COW for discussion and approval.
COST IMPACT FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGEIbD APPROPRIATION REQUIRED
Fund Source: 403.01 Water, 403.02 Sewer 412 Surface Water
Comments:
I MTG. DATE 1 RECORD OF COUNCIL ACTION
I 11/15/04 1 Approved Resolution #1566 to reject all bids
2/07/05 1
1 1
I
MTG. DATE I ATTACHMENTS
I 2/07/05 1 Information Memo dated January 11, 2005
Utilities Committee Minutes from January 19, 2005
1 I
Th'FORiv1ATION J\IEMO
To:
From:
Date:
Subject:
Mayor Mullet
Public Works Directo~
January 11,2005
AllentownlFoster Point Water & Sewer Improvements (Proiect No. Ol-SW02)
Re-bid Cost Saving Measures
ISSUE
The six bids for the AllentownfFoster Point Water and Sewer Improvements came in over budget by
approximately $900,000.00, and Council rejected all bids on November 15, 2004. This memo
addresses areas of cost savings that will be realized through changes in the plans and specifications.
BACKGROUND
In the year 2000, the City of Tukwila began design of sanitary sewers for the AllentownfFoster Point
neighborhoods of Tukwila. The funding source was to be City monies and a low interest loan from the
Washington State Public Works Trust Fund Board. The loan was secured in the spring of 2004, with
construction slated for late 2004 and 2005.
Ai....ALySIS
City staff and their consultants have reviewed the plans, specifications, and the new Geotechnical
Engineering Study by HW A GeoSciences. The following items will be revised in the redesign and
re-bid:
1) No Sales Tax on Road Material (RuIe 171).
2) Eliminate water line upgrades between Foster Point and
Allentown along the river (continue to use WD 125 lines).
3) Revise pipe trench sections to eliminate the use of new,
imported foundation gravel and allow use of native soil.
4) Revise pipe trench sections to allow native materials as
backfill. The current detail requires new, imported gravel.
5) Eliminate sidewalks, curbs, and gutters in Foster Point.
Replace with thickened edge pavement sections to direct
drainage to proposed catch basins.
6) Eliminate the sanitary sewer line to the base of Poverty Hill.
7) Eliminate the water line upgrades to Poverty Hill. Make
the upgrades a 2006 CIP item.
Total Possible Savings
Amount Saved
$200,000.00
100,000.00
50,000.00
300,000.00
100,000.00
100,000.00
50,000.00
$900,000.00
These savings are dependent on the bidding climate and current workload of bidders. The savings are
conservative and couId be greater if contractors bid this project aggressively. All indications are that
the bidding climate is favorable and many contractors remain interested in this project.
RECOMMENDATION
For information.
MC:lw
(p:Proj?:G'-~- sw Pro-;c.:z',l)JSV;U2'.Cost~..tp 0;--:):.::$ UCOlllCO)
Utilities Committee
January 19,2005
Present:
Dave Fenton, Chair; Joan Hernandez, Jim Haggerton
Jim Morrow, Bob Giberson, Pat Brodin, lv1ike Cusick, Gai] Labanara
A. 2003 SmaIJ Drainaze Prozram. Proiect Completion and Acceptance This contract caned for
drainage improvements to five locations throughout the City. One project was eliminated due to the
planned improvements on Southcenter Ph.'wy, which caused a reduction of 55,087.47. DL Asahara
was slow on cleanup of their punchlist items, thus the deJay in closing out the project. Recommend
move to Re!!ular consent a!!enda for approval.
B. Generator InstaIJation at the Emer2:encv Operations Center. Project Completion and
Acceptance Tnis contract instaIJed a generator to run the Emergency Operations Center (EOe) at the
golf maintenance facility. Additional work was needed at a cost of 59,050.00, which included
additional L&1 electrical requirements and Puget Sound Energy and their contractor PiJchuk for the
relocation of the transfonner. There was no impact to the players at the golf course. Dave also asked
about fueling vehicles in an emergency and what happens ifthe power goes out. Jim infonned him
that we have worked with Pride Pacific on Interurban and have a hoo1..'l.lp for a portable generator for
the gas pumps. Recommend move to Re!!ular consent a2:enda for approval.
C. AlIentown/Foster Point "Vater & Sewer Improvements. Re-bid Cost Savin!!s lVleasures In Nov.
2004, bids came in approximately 5900,000 over budget and were rejected. We presented possible
cost savings options to investigate. Since that time, we have done some additional geotechnical work
on the soils. In the original contract, we had planned on clean imported fill for the trenches. We have
now found that in some locations we will be able to use the existing native soil for backfiIJ (;';'3 & ;';'4).
We wiIJ also implement this as a road project to have Ru]e 171 applicable (no sales tax). We were
also going to take over Water District 125 customers in the Foster Point area and upgrade the water
~ 1,'.1' lines. WD 125 already has 8" water lines, so now the plan is to have aIJ of Foster Point in WD 125.
X-- Foster Pt. \\~IJ then have an inCTease in water pressure since our customers were only serviced by 2-4"
water lines. We will also eliminate the planned sidewalk in Foster Point and just do thickened edge on
the curb, but we will put the Foster Pt sidewaU, as an additive in the bid. Fina]]y, no upgrades to the
base of Poverty Hi]], which were planned due to construction in the area. Scheduled to advertise in
February and hopefu]]y bids wiIJ be more favorable the second time around. Recommend move to
Re!!ular for discussion and approval.
D. "Vater and Sewer Rates Annual re\~ew of water and sewer rates as reported to the Association of
Washington Cities. Some discussion on the utility rate package presented for the Council retreat.
Committee requested that we get the sewer rates that were not submitted, especiaIJy from adjoining
areas, as there were some question if the King County Metro charge was added or just the City charge
was submitted to the survey. Information.
R. Surface Water Rates Jim M. stated that with the huge amount of infrastructure added each year, the
City rea]]y does not have a replacement schedule besides the CIP. Dave and Jim H. suggested that we
should discuss rates at the retreat and proposed residential rates be 570.00 (35% increase) but keep
commercial customers at a 20% increase as listed in the budget. Especially since the average
residential rate is 585.00. Joan was hesitant about such a large inCTease. Information.
Other Reported on flood conditions (s]ides at Ryan Hill near 1-5 access and SR-599 across from the
SCL switch station). The City overall is fine even thought the Corps has the river very high. Also
reported that there would be two lanes closed on S. ]80"' Sr underpass to construct underdrains.
Re er board is up infonning drivers of four weeks of traffic disruption starting 217/05.
Committee Chair Approva]