Loading...
HomeMy WebLinkAboutReg 2004-05-03 Item 3G - Loan Acceptance - Public Works Trust Fund Loan for Cascade View Neighborhood DrainageCOL. TCIL AGENDA SE OPSIS Initials Meeting Date 1 Prepared by 1 Mayor's review 1 Council review 4/26/04 R 3tfl `en Q.3/ 04 BB for A, N ITB 1KM. S12, IO Original Agenda Date: 1 CAS Number: 04-060 Agenda Item Title: Accept Public Works Trust Fund loan of $4,196,056.00 for construction of Cascade View Neighborhood Drainage Project. I Original Sponsor: Timeline: Sponsor's Summary: O� -0 O Council Admin. The Public Works Trust Fund has approved our application of a loan for $4,196,056.00 to construct a storm drainage system for the Cascade View neighborhood. Improvements to the storm drains, water mains and street restorations will be included. Recommendations: Sponsor: Authorize Mayor to sign the loan agreement with Public Works Trust Fund. Committee: Forward to COW and the Regular Council with approval. Administration: Same as sponsor. Cost Impact (if known): $4,196,056.00 loan at 1% per annum for a term of 20 years. Fund Source (if known): 412 Fund Surface Water (pg. 112 2004 CIP) Meeting Date 1 4/26/04 Meeting bate 4/26/04 5/0/04 MifeQSAV,..WP Attachments Information Memo dated April 14, 2004 Loan Agreement with Public Works Trust Fund Utility Committee Meeting Minutes from April 20, 2004 Memorandum to Mayor dated April 14, 2004. April 26, 2004 Public Works ITEMNO. Action COW; Discussion. Council consensus existed to forward the item to the May 3, 2004 Regular meeting for action. INFORMATION M~MO To: Mayor Mullet From: Public Works Directort~"l'~ Date: April 14, 2004 Subject: Cascade View Drainage Improvements Public Works Trust Fund Loan Acceptance ISSUE In May 2003, the City of Tukwila Public Works Department applied for a $4,196,056 Public Works Trust Fund loan to construct neighborhood improvements for thc Cascade View area of Tukwila. This loan was recently approved by the Governor and now awaits formal acceptance by the City. BACKGROUND Design of the Cascade View drainage and roadway improvements is underway and is scheduled to be completed by the end of the year. Construction is anticipated m begin in early 2005. Estimated Project Costs Fundine Sources Preliminary Engineering $ 515,000 CDBG Grants $ 306,715 Construction 3,450,000 PWTF Design Loan (5 yr) 100,000 Construction Engineering 690,000 City Revenue 466,229 Contingency 414,000 PWTF Loan (20 yr) 4,196,056 Total $5,069,000 Total $5,069,000 The PWTF loan is for $4,196,056 at 1% interest per annum over 20 years. The debt service is estimated to be approximately $230,000 per year but will not be confmned until after the project has been constructed and the costs are finalized. RECOMMENDATION Forward to Council with the recommendation to accept the loan from the Public Works Trust Fund for the Cascade View Drainage Improvements. RL:ad attachment: Loan Agreement with PWTF file: 00-DR06.2