HomeMy WebLinkAboutPermit D03-350 - DHS BUILDING - WALL RDHS BUILDING -
WALL "R"
12500 TUKWILA
INTERNATIONAL BLVD
D03 -350
Parcel No.: 7340600602
Address: 12500 TUKWILA INTERNATIONAL BL TUKW
Suite No:
Tenant:
Name:
Address:
Owner:
Name:
Address:
Contact Person:
Name:
Address:
Contractor:
Name:
Fire Loop Hydrant:
Flood Control Zone:
Hauling:
Land Altering:
Landscape Irrigation:
Moving Oversize Load:
Sanitary Side Sewer:
Sewer Main Extension:
Storm Drainage:
Street Use:
Water Main Extension:
Water Meter:
doc: Devperm
City of Tukwila
Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670
DHS BUILDING - WALL 'R'
12500 TUKWILA INTERNATIONAL BL, TUKWILA WA
INTRNL GATEWAY EAST III
12201 TUKWILA INTRNTL BLVD, SEATTLE WA
RALPH HAGLER
12201 TUKWILA INTERNATIONAL BL, TUKWILA WA
SABEY CONSTRUCTION INC.
Value of Construction: $ $50,000.00
Type of Fire Protection:
Type of Construction:
Public Works Activities:
Channelization / Striping: N
Curb Cut / Access / Sidewalk / CSS: N
N
N
N
N
N
N
N
N
N
N
N
N
DEVELOPMENT PERMIT
Number: 0
Start Time:
Volumes: Cut
Start Time:
Private: N
Profit: N
Private: N
D03 -350
Permit Number:
Issue Date:
Permit Expires On:
Phone:
Phone: 206 281 -8700
Phone: 206 - 281 -4700
Address: 12201 TUKWILA INTERNATIONAL BLVD, SEATTLE WA
Contractor License No: SABEYCI033KM Expiration Date:01 /06/2005
DESCRIPTION OF WORK:
CONSTRUCTION WALL "R" MODULAR BLOCK WALL FOR PORTION OF THE NORTH PARKING LOT.
Size (Inches): 0
End Time:
0 c.y. Fill 0 c.y.
End Time:
Public:
Non - Profit:
Public:
DO3 -350
12/31/2003
06/28/2004
Fees Collected: $1,576.69
Uniform Building Code Edition: 1997
Occupancy per UBC:
N
N
N
Printed: 12 -31 -2003
Signature:
doc: Devperm
City of Tukwila
Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670
Permit Center Authorized Signature:
Date: u,3
I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and
ordinances governing this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws
regulating con strw�tion Qr the pformance of work. I am authorized to sign and obtain this development permit.
D03 -350
Print Name: � A.11(� L ig,
This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is
suspended or abandoned for a period of 180 days from the last inspection.
Printed: 12 -31 -2003
City of Tukwila
Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670
z
• z
re w
QQ �
J U
O 0 0
CO
W=
F-
w 0
2
g
I
�
z =
4: All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1997 z O
Edition) as amended, Uniform Mechanical Code (1997 Edition), and Washington State Energy Code (1997 Edition).
n 0
5: Validity of Permit. The issuance of a permit or approval of plans, specifications, and computations shall not be 0 D-
construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any in H
other ordinance of the jurisdiction. No permit presuming to give authority to violate or cancel the provisions of this w • w
code shall be valid.
u- O
w z
U =
0
I
Parcel No.: 7340600602 Permit Number: D03 -350
Address: 12500 TUKWILA INTERNATIONAL BL TUKW Status: ISSUED
Suite No: Applied Date: 11/10/2003
Tenant: DHS BUILDING - WALL 'R' Issue Date: 12/31/2003
1: ** *BUILDING DEPARTMENT CONDITIONS * **
2: No changes will be made to the plans unless approved by the Engineer and the Tukwila Building Division.
3: All permits, inspection records, and approved plans shall be available at the job site prior to the start of any
construction. These documents are to be maintained and available until final inspection approval is granted.
6: ** *PUBLIC WORKS DEPARTMENT CONDITIONS * **
PERMIT CONDITIONS
7: Contractor shall notify Public Works Utility Inspector at (206)433 -0179 of commencement and completion of work at least
24 hours in advance.
8: Work affecting traffic flows shall be closely coordinated with the City Utilities Inspector. Traffic Control Plans
shall be submitted to the Inspector for prior approval.
9: Flagging, signing and coning shall be in accordance with MUTCD for Traffic Control. Contractor shall provide certified
flagmen for traffic control. Sweep or otherwise clean streets to the satisfaction of Public Works each night around
hauling route (No flushing allowed). Notify City Inspector before 12:00 Noon on Friday preceding any weekend work.
10: Any material spilled onto any street shall be cleaned up immediately.
11: A copy of the Certificate of Insurance Coverage (minimum of $1,000,000 naming the City of Tukwila as additionally
insured).
12: A map which shows the haul route.
13: Hauling over 50 cubic yards shall require application for a Hauling Permit prior to any associated activity.
14: Clean and remove debris from City catch basin in and around hauling routes. Provide adequate temporary access as not to
interfere with other vehicle movement or cause trucks to travel over curbs. All vehicles must make a complete stop
prior to entering public right -of -way.
15: Business License with the City of Tukwila.
16: Route Map.
doc: Conditions
D03 -350
Printed: 12 -31 -2003
' e s:�iJr'ri ;;xJtisL'�t,Yt1 aV.. 4.1 • •
z
Signature:
doc: Conditions
City of Tukwila
Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670
I hereby certify that I have read these conditions and will comply with them
governing this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or
regulating construction or the performance of work.
Print Name: 0Axt 44 LEN67
D03 -350
as outlined. All provisions of law and ordinances
cancel the provision of any other work or local laws
Date: 12 ( VO3
Printed: 12 -31 -2003
•
YPIT r" '
e • '4 yt" 1424 yin4,
"L'V'AtitVA'
, A
King Co Assessor's Tax No.:
Site Address: /0G Tlik0 i L94P7a-7 g , Suite Number:
Tenant Name: DNS Heidckni edaW * . f "
Property Owners Name: ..(1742_ei C.c;), 17;t4 eN1
Mailing Address: /22 77/ktot /cc, eryi SIP/7a / te/vd. Tt;hivilet. , WA-, ?8(68- 57Z
City State Zip
#09/ei-
Mailing Address: /02
Name:
E-Mail Address:
Company Name: C4t Lkkini/v.
Mailing Address:
City
Day Telephone:
Fax Number:
Contact Person:
E-Mail Address:
Contractor Registration Number: Expiration Date:
**An original or notarized copy of current Washington State Contractor License must be presented at the time of permit issuance**
ARCHITE
Company Name:
Mailing Address:
State
Contact Person:
E-Mail Address:
Company Name:
Mailing Address:
Contact Person:
E-Mail Address:
\applicationskpemni application (3.2003)
3/2003
CITY OF TUKWILA
Community Development Department
Public Works Department
Permit Center
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
Applications and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or by fax.
**Please Print**
rita
David ti/ah5 avid 117c5cacdes
0 rioe. V 7± 2a7 E
*pp•
coyvi
efikk.W; W.PPMP,ii , Falai(
• -V - t2r 04. 14 ! •
•1.140 ' • tg v .
Page 1
vra
Day Telephone:( 2-c9/- 7
V , 1- Wikc
city
Fax Number:
New Tenant:
•• .
- 754zo0 -a6az
-1
D..No
Floor:
D.... Yes
State
State
8
8 5
Zip
Zip
Zip
t,
•
City
Day Telephone:
Fax Number:
City State
25y --4-
Day Telephone: (425
Fax Number: (4/ is 2 Z 7t9
\applications ■permit application (3.2003)
3/2003
Page 2
FIRE PROTECTION/HAZARDOUS MATERIALS:
❑ .. Sprinklers 0 ..Automatic Fire Alarm ❑ ..None
. Other (specify)
.,
Valuation df'Project (contractor's bid price): $ 5O, 000 Existing Building Valuation: s
Scope of Work (please provide detailed information): Celn 5+I(V.C.)t (1:>:.A../( I (34 tt
Will there be new rack storage? 0 ..Yes 0.. No If "yes ", see Handout No. for requirements.
Proytde Al! Building Areas in Squalre FdotageBelow
• l "'Floo r..:: ;
Y ..
20O.FloOt
3f° Floor
Floors
thni
Basement
Accessory Structures
:Attached. Garage :.,.
Detached Garage
Attached ; •
Detached Carport
Covered Deck ::
•
:'Uncovered Peck
"Addition °Cd
Extstmg.,
. fracture
`Type Qf;;
Constructioin
per UBC
Type of
Occupancy per
UBC
PLANNING DIVISION:
Single- family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches)
*For an Accessory dwelling, provide the following:
Lot Area (sq ft): Floor area of principal dwelling: Floor area for accessory dwelling:
*Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence.
Number of Parking Stalls Provided: Standard: Compact: Handicap:
Will there be a change in use? 0 ....Yes 0 ..No If "yes ", explain:
Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑..Yes []..No
If "yes", attach list of materials and storage locations on a separate 8 -1/2 x I I paper indicating quantities and Material Safety Data Sheets.
5J;
:g �n•Y±± r �. y .�. . J 7t , . " aa.�w` } ak•
:n (t »r 7t !"rrfrr •vli+xc t r K� Y i !xY t°} ,x t �i r y 1 .M&Ai
ifiar:? tl,: 1jY: �" c: j?'_ W•:... :p�'� :�te• , fb�i''s�'�lt�� + h.�'e .ti ir, .�. . r ..��f "Fn �.raa
Scope of Work (please provide detailed information):
lease refer to.Put li&Works Bulletin #1:for fees and estimate sheet.
Water District
❑ ...Tukwila 0... Water District #125
❑ ...Water Availability Provided
Sewer District
❑ ...Tukwila ❑ ... ValVue ❑ .. Renton ❑ ...Seattle
❑ ...Sewer Use Certificate 0... Sewer Availability Provided ❑ .. Approved Septic Plans Provided
❑ ...Septic System - For onsite septic system, provide 2 copies of a current septic design approval by King County Health Department.
Submitted with Application (mark boxes which apply):
❑ ...Civil Plans (Maximum Paper Size — 22" x 34 ")
❑...Technical Information Report (Storm Drainage)
❑ ...Bond ❑ .. Insurance ❑ .. Easement(s)
Proposed Activities (mark boxes that apply):
❑ ...Right -of -way Use - Nonprofit for less than 72 hours
❑ ...Right -of -way Use - No Disturbance
❑ ...Construction/Excavation/Fill - Right -of -way
Non Right -of -way
❑ ...Total Cut
❑ ...Total Fill
■applicationa\permit application (3 -2003)
3/2003
cubic yards
cubic yards
❑...Sanitary Side Sewer
❑ ...Cap or Remove Utilities
❑...Frontage Improvements
❑ ...Traffic Control
❑ ...Backflow Prevention - Fire Protection
Irrigation
Domestic Water
❑...Permanent Water Meter Size...
❑...Temporary Water Meter Size..
❑ ...Water Only Meter Size
❑ ...Sewer Main Extension Public
❑ ...Water Main Extension Public _
❑ .. Abandon Septic Tank
❑ .. Curb Cut
❑ .. Pavement Cut
❑ .. Looped Fire Line
/
Call before you Dig: 1- 800 - 424 -5555
W.O#
WO#
WO#
Private
Private
❑ .. Highline
❑ .. Work in Flood Zone
❑ .. Storm Drainage
Page 3
❑ ...Renton
❑ .. Geotechnical Report ❑...Traffic Impact Analysis
❑ .. Maintenance Agreement(s) ❑...Hold Harmless
❑ .. Right -of -way Use - Profit for less than 72 hours
❑ .. Right -of -way Use — Potential Disturbance
❑ .. Grease Interceptor
❑ .. Channelization
❑ .. Trench Excavation
❑ .. Utility Undergrounding
❑ ...Deduct Water Meter Size
FINANCE INFORMATION
Fire Line Size at Property Line
❑...Water ❑ ...Sewer
Monthly Service Billing to:
Name:
Mailing Address:
Water Meter Refund/Billing:
Name:
Mailing Address:
Number of Public Fire Hydrant(s)
❑ ...Sewage Treatment
Day Telephone:
City
State
Zip
Day Telephone:
City
Stale
Zip
.`t":,`;•� , {+�,�v:4.�;ct�a7iiviiaY'i �!SG!:ai�7,`.�,".'W:•+i
Unit Type: :
Qty
':Unit TYPe� '.
Qty
Type:.
yp
Qty .,
.;Boiler /Compressor:
. Qty
Furnace <100K BTU
Air Handling Unit
>= 10,000 CFM
Other Mechanical
Equipment
0 -3 HP /100,000 BTU
Furnace>100K BTU
Evaporator Cooler
3 -15 HP /500,000 BTU
Floor Furnace
Ventilation Fan
15 -30 HP /1,000,000 BTU
Suspended/Wall/Floor
Mounted Heater
Ventilation System
30 -50 HP /1,750,000 BTU
Appliance Vent
Hood
50+ HP /1,750,000 BTU
Heat/Refrig/Cooling
System
Incinerator - Domestic
Air Handling Unit
<= 10,000 CFM
Incinerator — Comm/Ind
,m,� a'� , .r:.�t; ,�- k ,� �..'��'` , ,
MECHANICAL CONTRACTOR INFORMATION
Company Name:
Mailing Address:
City
Day Telephone:
Fax Number:
Contact Person:
E -Mail Address:
Contractor Registration Number:
Indicate type of mechanical work being installed and the quantity below:
Signature:
Print Name: E fr - fl'/ ero F a rte ' /
mays
Mailing Address:
\applications ■permit application (3.2003)
3/2003
3136
; 2C16�" 70
h ;at�rta
Page 4
Expiration Date:
City
State
**An original or notarized copy of current Washington State Contractor License must be presented at the time of permit issuance **
Valuation of Project (contractor's bid price): $
Scope of Work (please provide detailed information):
Use: Residential: New ....0 Replacement .... 0
Commercial: New ....0 Replacement ....0
Fuel Type: Electric Gas ....❑ Other:
Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject
to possible revision by the Permit Center to comply with current fee schedules.
Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation.
The Building Official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as
defined in Section 107.4 of the Uniform Building Code (current edition). No application shall be extended more than once.
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STAFF OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDING OWNER O UTHOR!ZED AQENT
Date: (/ —7- d 3
Day Telephone:(TZ' 2 - 5- 1 — `7'v '7?
�- zoo 0 am
State
2)
Zip
Date Application Accepted:
/i 7o - 03
Date Application Expires:
Staff Initials:
s
i
•L
Payee:
TRANSACTION LIST:
ACCOUNT ITEM LIST:
Description
doc: Receipt
City of Tukwila
6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670
Parcel No.: 7340600602 Permit Number: D03 -350
Address: 12500 TUKWILA INTERNATIONAL BL TUKW Status: APPROVED
Suite No: Applied Date: 11/10/2003
Applicant: DHS BUILDING - WALL 'R' Issue Date:
ID
gas
Receipt No.: R03 -01580 Payment Amount: 950.25 U
co
Initials: SKS Payment Date: 12/31/2003 01:48 PM 1 w
User ID: 1165 Balance: $0.00 Z 1
1— O
Z 1--
w uj
U c o
0-
O 1-
w w
= U '
Type Method Description Amount ~O
. Z
Payment Check 91104 950.25 U co
1--
O~
SABEY PROPERTIES LLC
BUILDING - NONRES
PW BASE APPLICATION FEE
PW PERMIT /INSPECTION FEE
STATE BUILDING SURCHARGE
Account Code Current Pmts
000/322.100
000/322.100
000/342.400
000/386.904
RECEIPT
643.75
172.00
130.00
4.50
Total: 950.25
, 12/3i. {1716 m rAL 6151.39
vog
Printed: 12 -31 -2003
Z
Z
Z
J U
00
O o
J • =
f—
U) u.
w
Receipt No.: R03 -01570 Payment Amount: 208.00 g
(o
Initials: LAW Payment Date: 12/29/2003 03:48 PM = w
f!— _
User ID: 1630 Balance: $950.25 Z
Payee: SABEY PROPERTIES LLC
ACCOUNT ITEM LIST:
Description
doc: Receipt
City of Tukwila
6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670
RECEIPT
Parcel No.: 7340600602 Permit Number: D03-350
Address: 12500 TUKWILA INTERNATIONAL BL TUKW Status: PENDING
Suite No: Applied Date: 11/10/2003
Applicant: DHS BUILDING - WALL 'W Issue Date:
TRANSACTION LIST:
Type Method Description Amount
Payment Check 91010 208.00
PW BASE APPLICATION FEE 000/322.100
PW PLAN REVIEW 000/345.830
Account Code Current Pmts
78.00
130.00
Total: 208.00
6053 12/30 9716 TOTAL. 3309.00
A
Printed: 12 -29 -2003
Parcel No.:
Address:
Suite No:
Applicant:
Initials: SKS
User ID: 1165
Payee:
ACCOUNT ITEM LIST:
Description
doc: Receipt
City of Tukwila
6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670
DHS BUILDING
Receipt No.: R03 -01359
SABEY PROPERTIES LLC
TRANSACTION LIST:
Type Method Description
Payment Check 90271
PLAN CHECK - NONRES
000/345.830
RECEIPT
7340600602
12500 TUKWILA INTERNATIONAL BL TUKW
Account Code
Permit Number:
Status:
Applied Date:
Issue Date:
Payment Amount: 418.44
Payment Date: 11/10/2003 03:23 PM
Balance: $648.25
Amount
418.44
Current Pmts
418.44
Total: 418.44
D03 -350
PENDING
11/10/2003
4579 .11/12 1716 TOTAL 4362.00
iA
Printed: 11 -10 -2003
z
U0
CO
• W
J
CO W
w0
Q 2
LLQ
= • d
w
z =
I-
I- 0
Z
• uj
2 • o'
U
O N .
o
w W
H H .
—
U. 0
Z
w
0
z
Project: 1:)"1AS
Type of Inspection:
r `
AdIres_ s:
Date Called:
�
Special Instructions:
Date Wanted:
p.m.
Requester:
Phone No:
INSPECTION RECORD
Retain a copy with permit
INSPECTION NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188
(206)431 -3670
171 . Approved per applicable codes. Corrections required prior to approval.
COMMENTS:
O
Inspector: r
Date:
$47.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be
paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
Receipt No.:
Date:
Projects )4 s
Type of Inspection: p w
Address:
25 TT B
Date Called:
eSi 0 Li
Special Instructions:
8
W A
Date Wanted:
9i/2j" / O
a.m.
p.m.
Requester:
D °VI/ S Phone cL4
No
5 1512.
4
INSPECTION RECORD
Retain a copy with permit
INSPECTION NO. PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431-3670
El Approved per applicable codes.
COMMENTS:
p,QA 60, Tit
N itby f AAteN‘
iii(ott rtAt.ek
c.e.meel ( r
T P-ef
git/Lot kA )2A .e.e,A 64 Os“(
Inspector:
6-0
Date:
q2),Voti
El $47.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be
paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
Receipt No.:
Date:
D
El Corrections required prior to approval.
Project:
(
Type of Inspection:
Address:
Date Called:
Special Instructions:
Date Wanted: �f,�
7–�,
,.
Requester: J
Phone No:
INSPECTION RECORD
Retain a copy with permit
INSPECTIO NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188
V Approved per applicable codes.
(206)431 -3670
COMMENTS:
El Corrections required prior to approval.
Date: "7
$47.0 EINSPECTION I EE REQUIRED. Prior to inspection, fee must be
paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
Receipt No.:
Date:
Project:
i
s
Type of Inspection:
Addres :
/— c 6��/ /�
Ft/3
Date Called:
Special Instructions:
Date Wanted:
Requester:
Phone No:
z
INSPECTION NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188
(Approved per applicable codes.
'COMMENTS:
INSPECTION RECORD
Retain a copy with permit
(206)431 -3670
El Corrections required prior to approval.
El $47.00 REiNSPECTION FEE4tEQUIRED. Prior to inspection, fee must be
paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
Receipt No.:
Date:
I
3
INSPECTION RECORD
Retain a copy with permit
INSPECTION NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 981 88
PERMI
(206)431-3670
I:I Approved per applicable codes. Corrections required prior to approval.
COMMENTS:
( 7 7 - ' 11 -e/( Cvo /4/4( 19)
r
• -.:.-',.•••
Date: 2,4?..oti ,
Ei $47.0 REINSPECTION FE5. REQUIRED. Prior to inspection, fee must be
paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
Receipt No.:
Date:
Type of Inspecp:
Aild(es.,.._ 1
6
Date Called: (.. V
Spdial Instructions:
Date Wanted:
tp.m.
Requester: i \......."
Phone No:
S/0 — 7S
I
3
INSPECTION RECORD
Retain a copy with permit
INSPECTION NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 981 88
PERMI
(206)431-3670
I:I Approved per applicable codes. Corrections required prior to approval.
COMMENTS:
( 7 7 - ' 11 -e/( Cvo /4/4( 19)
r
• -.:.-',.•••
Date: 2,4?..oti ,
Ei $47.0 REINSPECTION FE5. REQUIRED. Prior to inspection, fee must be
paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
Receipt No.:
Date:
Prot:
` 1
'„Q /r
. v l 1
Type of Inspe i •
jf
t� 1 V// d„..--)
39
Address.
t.
Date Called:
t zioz
� c� t ,
Special Instructions:
° I . aM(1
Date Wanted: ,rn
slab
��
Requester.
Phone No: — 1 ?() -() VV
i
INSPECTION RECORD
Retain a copy with permit
INSPECTION NO. PERMIT N
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670
pproved per applicable codes.
COMMENTS:
I
Corrections required prior to approval.
Inspecto
Date: v S _041
$47.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be
paid at 6300 Southcenter Bvd., Suite 100. Call to schedule reinspection.
Receipt No.:
Date:
A
MODULAR BLOCK WALL DESIGN
INS SEATTLE DISTRICT OFFICE
TUKWILA INTERNATIONAL BOULEVARD
TUKWILA, WASHINGTON
E- 2579 -44
February 26, 2003
PREPARED FOR
SABEY CORPORATION
'9\a
K apt 092\
0, �ha d ctc \.(. `�
ur
1 �,rti �-'•iS
5
1.9' . c :A ° ,.
Earth Consultants, Inc.
1805 - 136th Place Northeast, Suite 201
Bellevue, Washington 98005
(425) 643 -3780
Toll Free 1- 888 - 739 -6670
CITY �lU\
APPROVED
DEC 3 p 1 0133
AS NO
BU1!-
RgcMIV
NOV 1 0 1.003
PERMI (t,Lav I lk
Earth Consultants, Inc.
(;(•(,I(Y9111I('ill Iill);ill(t ts. Get)logitiis & Iifl \iru nlll( Mill ti( i(rnisiti
('nIstruti( Tesi » it, Kau ) : \\', \IU)hlsl xYli,nl:x•r\9l(:ti
February 26, 2003 E- 2579 -44
Sabey Corporation
12201 Tukwila International Boulevard
Fourth Floor
Seattle, Washington 98168 -5121
Attention: Mr. Ralph Hagler
Subject:
Dear Mr. Hagler:
Modular Block Wall Design
INS Seattle District Office
Tukwila International Boulevard
Tukwila, Washington
r--
Established 1975
In accordance with your request, Earth Consultants, Inc. (ECI) has prepared this modular
block wall design for the proposed site development. We understand mechanically
stabilized earth (MSE) fills and modular block wall construction is being considered
throughout portions of the site. The modular block wall heights and MSE fills could be on
the order of ten (10) to twenty -six (26) feet in some areas. Our scope of services
included review of the grading plan prepared by David Evans and Associates, engineering
analysis, and preparation of the attached drawing. This design includes the attached
drawings with recommendations for construction of the MSE walls, as well as
recommendations for seven and one half foot and ten foot high gravity walls.
MSE and Modular Block Wall Design
The design calculations for the MSE Wall and gravity modular block walls are included in
Appendix A. The reinforcement schedule and recommendations for the wall construction
are presented on the attached sheets SM1 and SM2. The soil parameters used in the
design assume the reinforced fill soils will be compacted to the specified relative
compaction of 90 percent of the maximum dry density as determined by the Modified
Proctor Method (ASTM D- 1557 -91). The wall design assumes drainage is provided, and
that hydrostatic pressures will not be allowed to mobilize. Additional drainage other than
what is shown on the drawings may be necessary, depending on soil and groundwater
conditions observed at the time of construction. The drainage shown on the drawings is
a minimum requirement. The installation of sheet drain may be necessary along the
contact between native cut and the reinforced fill zone, if groundwater seepage
conditions are encountered. ECI should observe the MSE and modular block wall
construction on a full -time basis. Supplement recommendations for drainage will be
made by ECI, if necessary.
1805 136th Place N.E., Suite 201, Bellevue, WA 98005
Bellevue (425) 643-3780 FAX (425) 746 -0860 Toll Free (888) 739 -6670
Sabey Corporation
February 26, 2003
For the MSE and modular block wall construction, a traffic surcharge of two hundred fifty
(250) pounds per square foot (psf) was assumed. The design should be reevaluated by
ECI for other surcharge loading conditions, where applicable. For the gravity walls, traffic
surcharge loading was not included, assuming that the gravity walls will be constructed
above the driveway areas or in the vicinity of the storm water detention pond. If the
surcharge loading will apply to the gravity walls, ECI should reevaluate the design.
Global stability of the proposed walls and fill areas was assessed in the geotechnical
engineering study prepared by ECI (see Geotechnical Engineering Study E- 2579 -44, dated
February 20, 2003). Global stability was assessed for both static and seismic loading.
Adequate factors -of- safety were calculated for the static and seismic loading.
We trust this design meets your current needs, and the submittal requirements. If you
have any questions or need additional information, please contact us.
Sincerely,
EARTH CONSULTANTS, INC.
IEXPli !ES 7_ / Z /Uo5
Raymond A. Coglas, P.E.
Project Manager
RAC /KRC /csm
Attachments: Appendix A - Calculations
Sheets SM1 and SM2
Earth Consultants, Inc.
Kyle R. Campbell, P.E.
Principal
E- 2579 -44
Page 2
NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR - THAN
THIS NOTICE IT'S DUE TO THE QUALITY OF THE DOCUMENT.
2
3
4
5
6
PROJECT Z�S
27,5' ' Y ez &. e ;( - Mss
Earth Consultants Inc.
(ki It t hnhml Engineers. Ckrdoµlses h IinvInn mint l Scientists
COMPUTED BY DATED ' 12. .5 I
CHECKED BY DATED
PROJECT NO. 257c '1 ' 4 / 1 1 SHEET I OF 1 ■
SUBJECT P \ac(e. L 4• �t �
=-�- Pk— �r - - ---c
'O ......_...._... •
• . .
rlc�t�
112)?
..: . ..
t ;
• 3;35
•
;;u ti81:. ��.,= it�`• ri�''. 1• �: eriw '.ti:t:;wt:iiif.�iriz�l''',�ul"' .°:fR:l(:i7i
44
45
COMPUTED BY DATED
Earth Consultants Inc.
CHECKED BY DATED
PROJECT NO. . 5 . 7 - 1 - 179 SHEET _ OF I t
SUBJECT
<kYNrr hr grill Engineers. Geologists & ISm•Inmme7uul Sclrrilisis
PROJECT
z.s' 10► Z.5 r-t3
s,o 2.c-‘ 71
7.5 1 4o1 I 1
12.s (0Z6 ' s6.5"`
I7,s . . 2 )2.5
z..z,s .. 1077- 1 r
zs . 0 1 k <bli 2,q 6a
2S.p
CIA, F-0.4.4ade,4 (_1"%e
N °4 ")
S (2s
o
Z, Z, 1 1�S 1
Z..0 .... .1.1.. __
5- ....,......._
3 S.
I. 0', ;
QQr 3� /
.1 ,I�.V..'. �t•. .� lO y �..
. 25'
•
• 0. LW. •-.c . 0 -43
, GE-11 CA
Fs • •
•
•
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
PROJECT
277.5 .1 11.
Gtsseclallty I I9,ginrr•rs. (wn lugisls & L3tvin mnx• ScIrnUsls
Earth Consultants Inc.
< L/ k
COMPUTED BY DATED
CHECKED BY DATED
PROJECT NO 2S -4 y SHEET . a OF
SUBJECT
i i � . ~i .� � / i may' I :• ~� CJ..�...t .._..__ i =+
.,•. � ........u.. � �„.ti1�!iie.ww:wv_R.w iaw.n�..o ro� �.n #��r.•r� ,�
ro 1 ! 4,
•
7.•rrrNN+ta
'1
= 17 c‘ i ?S - e .16s.
•
2
3
4
5
8
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
PROJECT
•
Earth Consultants Inc.
(ieOletfin Ingtne•re. G•oklgis(s & linvlrul oriental Scientists
(i..) • 02.
` .
6c)1 4 25` �-►�. • \L
Pea
tt\
COMPUTED BY DATED
CHECKED BY DATED
PROJECT NO 2 — J 4 SHEET 9- OF I I
SUBJECT
s j r ...: 1
I
.,. .+f..... ...,.d.14. ' :•xvaw,ut.,, 1...4vns.%. ..1, var'- o ....��•v • rb . , : • •:.
1 ► 1 l E ! c � •• i
L. ' � _.... . .....:_ {..._ •
i I
•i-
I 1 •
y I t
v 1
i
......••>•.... �n.1,..— .,. / .n.,,,,' ' .... jrw.. t r.a'✓w 4v.•4 .. 0:r.�r.w.u t um+rt, ?:.r.. % t
? ... ...4. .........1... i_ .. _4, . f_.. i .., _ .t_
ff
' •
... 4
f • a
4
•
Si i
•
A+J�'+K•r. u.\•'w,r.... ±niw t�.:w..rw.jr \fir p..,..rwr.:,�rv-. v.r.. • G . s.f:♦
7
•
2
3
4
5
6
7
a
9
10
11
12
13
14
15
16
17
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
PROJECT
1
Earth Consultants Inc.
(kr,urhnlcll Bngll1I tvs. Geologists & lin%InmureiI1I Sdc ,ULms
• -c \ t _L3
I
1 S i 1
1 V 1
4 , i ... .I
. N j I t f ` 1
r
,
... y- .w. .. .un +. , a..N'I.... .., „,„ . ±• .: ..... r , r ' -jn. :. i:x. r
e i
1 I
i !
_ ... ...
...._ .. 1
.
» ..,r �. „w......L
.I
f
• t
t •
1 ..
Y, •
.1
60, 7
,200
24 300
Zd �ZS
� 1
COMPUTED BY DATED
CHECKED BY DATED
PROJECT NO. l S:7 - yy SHEET - OF L
SUBJECT
VI ci9
I ci ) c9
0 30
I I ,
(n - 1.357
.167 7
:2,
A
•
1
ti
) i i f • { j
•...,. a,n•uw, m .'rwroeulwr..:.�.;nrr u.. n:�v. ` ' ! ' .".,%/••••• .
} I'.r�+ . l„ r6N. t• :L':::.w...Y'��eY:.YY:.r,ytN,'. �e:rv.n„.r..
,33
1.67
l
9
8
7
.3 .
0
3.8
4
6 7
Z,.
2.-
Z.
z.
2-
0
z QQ
z
cG 2
00
w�
N LL
w
Iw
-- =
Zo
O • N
O H
i z
w W.
�Z
0�..
z
I,
43
44
45
Earth Consultants Inc.
Geiger r linlcal Engineers. Geologists & Ens Ir tunenml Scientists
PROJECT
• C.-1G, S1 Ame._y,`d .107 = 0. 0.67)
Use_ I cc 'c,k 0 .
Pt-F1 o
()M_ ( - 0.30
Q 0 - � - �CCe Cm e►sn1� c \Cwt
r� = O ...SA-w► vv
0 ,5 o,30 \ 3s�c�
P p,v , - O. 1-t Z
- •30 , 135- X27 S
a�-
6.;
j x .. .;.
X ;x; :. .... ..-
v- .....! . _ .. . .... h ......: .....:.. ... a ...'— ..
I i
w • . r.N+{m .. ww,�y,...n ,.wwn ..1 . ..a..la -.� ... �. ,r, • -... •, r4 ■ •
COMPUTED BY DATED
CHECKED BY DATED
PROJECT NO. 7e 1'4 1 { SHEET e OF I t ,
SUBJECT
tS, -I 4 )/
WNW
PROJECT
ck. Stkc ( ,4c Cam` .�
Scce. (F P + +
IG,S4s+ Ig',3ly +- s.7743
co'ce._s.`s. C\ (Ft , e7 Cr, */ i CFocPA r i cam•
Earth Consultants Inc.
(k OII t hnlral IA:pinrrrs. Geologists & I;I W In) I11R•I11U1 Sc'II ,IILSI5
.S
= Z7,S ' •
1- 12 ) 06e
! • •
COMPUTED BY DATED
CHECKED BY DATED
PROJECT NO 2'579 -w 1 SHEET 7 OF
SUBJECT
1 07
/-I iS
4.
._ . ...,..r
... �,.....n• • » i�. - ...• '.....ae.e ■ : ',..., ' •.13.0 .n.,.•.u..•.j,..•. . �w.�.. u t... n,z.�. ;;... , r ,:. v..=. . ... .' .. .,r !�. «. v.. • ...
i a • w w
. i .
/
.
3
•
Earth Consultants Inc.
Gvrlechnie.:J Engineers. cev Aogisls A 19wlnxmxvnnl Scicnlists
PROJECT
`.51e ETC' i c� L = 7-2-4
. =
27.5 2LS . 61 ((75
� Iz= 11
•
•
•
Vfl = V ) 4"3 45 (cl•t + ■ ) 012.s. 1375 ,7 )6.S
'1 eG, G2 \u -Sri
cYNry 2)% 1 6 - zs 4 V/ - 1(U- es t1e&,bz) k_'
•
•
A .
;
.....�;.,.. . .,. s ;.w....b..,.0 . .�.»..e.:... . 1..,..,4....4..,.... .., e..�•
1
t '1'
■
COMPUTED BY DATED
CHECKED BY DATED 11 �
PROJECT NO -. 1- 5 )9 ' `{ SHEET \
OF
SUBJECT
4- Pte• i „e
MOM"
•
5
1is
7.S
5
Earth Consultants Inc.
Geol tihnh'tii lingirnrrs. Geologists /eFininntmentni Scientists
'ROJECT
231
(7.c1
er'37:3
oSo Liss a 1 "7 o 8
4376 3 l
\ P.
0$-Net
( "
F, C'1
3,512 1 .6.(, -r 3 3o7y
3,4
I 25:3 I-1:0G
la de
337Z `..
( L1 \ • 3
1 ; i . rt
7.1:305n Z 1 44z� I-1 17H I �Io \
( \•t5)
I co,573 3 Z 4c° 1 Z 162. 1
I e ci-t?
0 12. 1 326 11545c 2)2177 V`.3
21e
?? 7 -7.= •
I (f f I` )v l z l szr) ' I -1 861 5
COMPUTED BY DATED
CHECKED BY DATED
PROJECT NO l' 19 SHEET q OF
SUBJECT
7.s
11 z2-400 k
Cs -aGyoi
43
l�
l'
'-1
�.S
6
II
Z.Z.
Za
10
2
3
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
PROJECT SUBJECT
• Ck Q
•
Earth Consultants Inc.
(;trtlttihnlrtl Engineers. Genlagiste t4 I fl 110nlnt•mal Scientists
t,.S A U }}z 4 ‘ 0t.S'.-95/ )
(11 is-g
2 _01,
c ..... vee. taxsx
o .3c�
L �.( .. O•,t,
`el ( 9.;% 571 .
l o .
I I
(
_ i
•
�..1 —i _ . s
. i t \ . .
1 1
+ 1
COMPUTED BY DATED
CHECKED BY DATED
PROJECT NO.2. 7 '1 1 SHEET t 0 OF
30
730 t 'Sc?�
d t G � � 2-
2
3
4
5
8
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
Earth Consultants Inc.
((0t(c latintl Engineers. G e t & Environmental Sc)enllsts
PROJECT
•
•
��� \G�Ic.�SiC?Cls
`. .� . 2 - 3 ,712 p_4
Jr ' 2)eSE= 1-( 1 12 5
COMPUTED BY DATED
CHECKED BY DATED
PROJECT NO.2S 1 ^iy SHEET \ OF I t
SUBJECT
L I > L Ada - f
Z ss - ( ! (ue,.
(
! ! I i
1
_......_ ..... ; _....t.. ...... .... . r•-•• a
„„, „„ w,.. . - M• .r;.ww . .MU•�..0 ia+ w r. a� ', rv:xb. + » + ... :o� r r: , .:.r .. L:... v;.. u: r. r •rr.t...:.•..w «�•...r..- x n.:..- >.:.- ...,,.....,.,.
v L
w
y y
- _..._ .. � - .. ...
(t)c‘<\1
•
Gravity Wall Calculations
75 Fool Wall
Project Description: INS Building
ECI Job No. E- 2579 -44
February 2S, 2003
Wall height will be 7.5 feet maximum
Grade above wall will level
The blocks will consist of Lock - Blocks manufactured by
"Ultra- block" which have typical dimensions of 2.5 feet high,
2.5 feet wide, and 5.0 feet long
Soil Conditions:
Wall backflll will consist of native and imported silly SAND
with gravel
So il in front of wall will be native soil
The area below wall will be level
Lock -Block Wall Dimensions
Height of wall -- 7.5 feet (three blocks high)
H w : =7.5
Wall batter measured from vertical -- wall vertical, no batter
a : =0•deg
Wall embedment
H emb : =2
Exposed vertical wall height
H := Hw•cos(a)— Hemb
Bottom width of wall
B =5
Design wall height
H :=H H B b•sin(a)
Top width of wall
B t := 2.5
Inclination of ground slope behind wall measured from horizontal plane
l := 0 •deg
InclIna of back of wall measured clockwise from horizontal plane
atan B b — B t - 18.43 *deg 0 := 90 + a — 18.43
H
0 = 71.57
H e = 5.5
H = 7.5
Determination of Earth Pressures and Surcharge Loading
Backfill soil unit weight
y : =135
Friction angle of retained soils
4) :=30.deg
Inclination of back of wail measured from horizontal plane
0 :=71.57.deg
Angle of Backflll to Wall Interface with Soil
ly
Wall batter measured from the vertical
a : =0•deg
Friction between concrete Lock -Block and soil
8 := 28•deg
K : =.33
Resultant of active earth pressure
K a •y•H a
P :_
2
Horizontal Component of P
P H := P•cos(90 •deg — 0 + 8 )
Vertical Component of P
P P•sin(90•deg— 0 +8)
P = 1252.97
P H = 863.6
P v = 907.82
Mass Unit
Area
x'I
y'I
Weight
Mass Moment
x'
Mass Moment
y'
Sq. ft
ft
ft
k/ft
k -ft/lin foot
k -ft/lin foot
Block 1
12.5
2.5
1.25
1.75
4.375
2.19
Block 2
6.25
1.25
3.75
1.75
4.375
6.56
Block 3
6.25
1.25
6.25
0.875
0.9375
5.47
Soil 1
12.5
3.75
5
1.5
5.6
7.5
Total
16.25
5.875
15.2875
21.72
x'
2.60
y'
3.70
Evaluation of External Stability
Calculate Center of Gravity for Wall by taking moments of all resisting masses about
the toe of the wall and then dividing sum of resisting moments by weight of wall in x'y'
planes:
Horizontal distance of "O" measured from toe in xy' coordinates
x' : = 2.60
Vertical distance of "O" measured from toe in x'y' coordinates
y' := 3.70
Weight of wall and soil resisting overturning
W := 5875
Horizontal arm of W measured from toe in XY planes
a := cos(a)•(x' +y'•tan(a)) a = 2.6
Vertical arm of PH measured from toe In XY planes
b := H B b•sin(a) b = 2.25
3.34
Horizontal arm of Pv measured from toe in XY planes
e : =B b•sin(90•deg- a) - tan(90•deg- A)
3.34
e = 4.25
fC,. .�..,.., 'itii:,',.r..4i:.+i%`.• =x.Jui
Evaluation of Overturning Stability
Resisting Moment
M W•a1 -P �.e
Driving Moment
Md: =PH•b
Factor of Safety against overturning
Seismic
MR
FS :_
M
Driving Moment
M ds :_ (1 H •b) + 1139+ 427
Factor of Safety against overturning
M
FS os '_
Mds
M R = 19134.78
Md= 1939.21
FS =9.87
M d = 3505.21
FS os = 5.46
Evaluation of Sliding Stability
Coefficient of friction between wall and foundation soil
F :=tan(8)
Reaction at the base of wall
N := W•cos(a) + P vcos(a) + P H•sin(a)
K p := 350
Sum of forces providing resistance to sliding
F r : =N•F+ W•sin(a)+ P v •sin(a) + K
Sum of forces driving the wall in sliding
F d : =P H•cos(a)
Factor of Safety against sliding
F
FS s '_
Fd
Seismic
Sum of forces driving the wall in sliding
F d := (P H •cos(a )) + 1139+ 427
Factor of Safety against sliding
F
FS ss
F ds
F = 0.53
F r = 4306.49
Fd =863.6
FS s = 4.99
F d = 2429.6
FS ss = 1.77
Evaluation of Bearing Capacity and Foundation Stability
Width of wall footing
B B -0.5
Soil unit weight for bearing soil
y : =135
Friction angle of bearing soil
:=34.deg
Soil cohesion
c : =0
Surcharge
g := y'(Hemb +
Bearing Capacity Factors from table 4.4.7.1A, AASHTO 19900
N c := 42.16 N q := 29.44 N y '=41.06
Ultimate Bearing Capacity
gult c•Nc-t- 0.5•y•BfNy +q•Nq
Allowable Bearing Capacity
_ q ult
g all -
3
q = 337.5
q ult = 25179.53
q all = 8393.18
ltricity and Bearing Pressures
amming moments about the center of the footing base
:= W•cos(a)- F- P N = 6782.82
v :=N.cos(a) N v = 6782.82
H := N.sin(a) N H = 0
)rizontal distance of normal force from toe
, W.a-P -PH.b
N V I- N H •tan(a )
:centricity of the base reaction from the center of base of wall measured
mg the plane parallel to the base of the wall
f b
— = 1.67
3
Bb X
x • 2 cos(a)
X X 2'B b
-254 Bb- -246 -333
cos(a) 3
cos(a)
B b X and B b- x �b
3 cos(a) cos(a) 3
1.67 <- -2.54 and 2.46 <- -3.33
aximum bearing pressure
N 6 ' e x
9 max:=B b ' 1 + Bb
nimum bearing pressure
N 6.e x
g min : = 1- Bb
q max = 1299.32
g min = 1413.81
X = 2.54
ex = -0.04
Soil Conditions:
Gravity Wall Calculations
10.0 Foot Wall
Project Description: INS Building
ECI Job No. E- 2579 -44 '
February 26, 2003
Wall height will be 10.0 feet maximum
Grade above wall will be level
The blocks will consist of Lock - Blocks manufactured by
"Ultra- block" which have typical dimensions of 2.5 feet high,
2.5 feet wide, and 5.0 feet long
Wall backflll will consist of native and Imported silty SAND
with gravel
Soil in front of wall will be native soil
The area below wall will be level
Lock -Block Wall Dimensions
Height of wall - -10 feet (four blocks high)
H =10.0
Wall batter measured from vertical -- wall vertical, no batter
a : =0•deg
Wall embedment
Hemb := 1 . 5
Exposed vertical wall height
H := H w •cos(a) - H
Bottom width of wall
B =S
Design wall height
H := H +H -I-B b•sin(a)
Top width of wall
B : =2.5
Inclination of ground slope behind wall measured from horizontal plane
p : = 0•deg
Inclination of back of wall measured clockwise from horizontal plane
atan B b - B t - 14.04 °deg 0 :=90÷ a - 14.04 0 = 75.96
H
H = 8.5
H= 10
Determination of Earth Pressures and Surcharge Loading
Backfill soil unit weight
y: =135
i Z
re
u 6 D
JU.
0O
.
U.)
(n O,
W
LL Q:
a
= W
Z �
I— O..
Z I-
D:
0
;O
0 I--
W
I - U:
L I O
• Z.
U N
z
Friction angle of retained soils
:=30.deg
Inclination of back of wall measured from horizontal plane
0 := 75.96•deg
Angle of Backfill to Wall interface with Soil
:=- 2.74•deg
Wall batter measured from the vertical
a : =0•deg
Friction between concrete Lock -Block and soil
Resultant of active earth pressure
K a
P
Horizontal Component of P
P P•cos(90•deg— 0 +S)
S :=28.deg
K := 0.33
2
Vertical Component of P
P v := P•sin(90•deg— 0+8)
P = 2227.5
P 1654.31
v = 1491.64
Mass Unit
Area
x'l
y'I
Weight
Mass Moment
x'
Mass Moment
y'
Sq. ft
ft
ft
k/ft
k -ft/lin foot
k- ft/lin foot
Block 1
12.5
2.5
1.25
1.75
4.375
2.19
Block 2
12.5
2.5
3.75
1.75
4.375
6.56
Block 3
6.25
1.25
6.25
0.875
1.09
5.47
Block 4
6.25
1.25
8.75
0.875
1.09
7.66
Soil 1
12.5
3.75
7.5
1.562
5.8575
11.71
Total
27.5
6.75
16.7875
33.59
x'
2.49
y'
4.97
Evaluation of External Stability
Calculate Center of Gravity for Wall by taking moments of all resisting masses about
the toe of the wall and then dividing sum of resisting moments by weight of wall in x'y'
planes:
Horizontal distance of "O" measured from toe in x'y' coordinates
x' : =2.49
Vertical distance of "O" measured from toe in x'y' coordinates
y' : = 4.97
Weight of wall and soil resisting overturning
W : =6750
Horizontal arm of W measured from toe in XY planes
a:= cos(a)•(x'+y'•tan(a)) a = 2.49
Vertical arm of PH measured from toe in XY planes
b := H B b•sin(a) b = 2.99
3.34
Horizontal arm of Pv measured from toe in XY planes
e : =B b•sin(90•deg- a)- H .tan(90.deg- 0)
3.34
e = 4.25
M
FS os =
Evaluation of Overturning Stability
Resisting Moment
M R := W•a1 -P
Driving Moment
M d :=P1-1.13
Factor of Safety against overturning
M
FS 0
Md
M ds
Seismic
Driving Moment
M ds :_ (P H .b) - 2025} - 750
Factor of Safety against overturning
M 23148.91
M d = 4953.04
FS =4.67
M d = 7728.04
FS os =3
Evaluation of Sliding Stability
Coefficient of friction between wall and foundation soil
F := tan(8)
Reaction at the base of wall
N := W•cos(a)• P I- PH•sin(a)
K P := 350
Sum of forces providing resistance to sliding
F r := N•F-}- W.sin(a) -f- P vsin(a) + K p•H emb
Sum of forces driving the wall in sliding
F d : =P H•cos(a)
Factor of Safety against sliding
F
FS s :=
Fd
Seismic
Sum of forces driving the wall in sliding
F ds :_ (P H•cos(a)) -t- 2025+ 750
Factor of Safety against sliding
F
r
FS :=
F ds
F = 0.53
F r = 4907.16
F d = 1654.31
FS s = 2.97
F d = 4429.31
FSss= 1.11
Evaluation of Bearing Capacity and Foundation Stability
Width of wall footing
z
Bf := B +0.5 Q
Soil unit weight for bearing soil
y: =135 W
J U:
00
(.0
Friction angle of bearing soil
:=34.deg
Soil cohesion
c :=0
Surcharge
q : = y' (H emb+ 0.5)
q = 270
Bearing Capacity Factors from table 4.4.7.1A, AASHTO 1996
N : =42.16 N q : =29.44 N I : =41.06
Ultimate Bearing Capacity
q u i t := c•Nc +0.5•y•B fNy +q•N
Allowable Bearing Capacity
q ult
g all : = 3
q tilt = 23192.33
q a ll = 7730.78
W =
J �
Eccentricity and Bearing Pressures
Summing moments about the center of the footing base
N := W•cos(a) +Pvcos(a) +PH•sin(a) N = 8241.64
Nv := N•cos(a) N 8241.64
NH := N•sin(a) NH= 0
Horizontal distance of normal force from toe
W +P PH•b
X :=
N�+ NH-tan(a)
Eccentricity of the base reaction from the center of base of wall measured
along the plane parallel to the base of the wall
Bb X
e x' e 0.29
2 cos(a)
B b= 1.67 X _ X 2 ' B b
3 -279
cos(a) 2.21 B b cos(a) 3 - 3 33
Bb S --X- and B X b
3 cos(a) cos(a) 3
1.6751.95 and 3.0553.33
Maximum bearing pressure
N 6.e x
g max ' = —• 1+
B b B b
Minimum bearing pressure
N 6 ' e x
q min ' =— 1-
Bb B
q max = 2226.31
q mm = 1070.35
X = 2.21
June 17, 2004
Dear Permit Holder:
Sincerely,
Stefania Spencer
Permit Technician
Xc: Permit File No. D03 - 350
Bob Benedicto, Building Official
City of Tukwila
Department of Community Development Steve Lancaster, Director
Ralph Hagler
12201 Tukwila International Boulevard
Tukwila, WA 98168
RE: Permit Application No. D03 -350
12500 Tukwila International Boulevard
In reviewing our current records the above noted permit has not received a final inspection by the City of Tukwila
Building Division. Per the Uniform Building Code and /or Uniform Mechanical Code, every permit issued by the
Building Official under the provisions of this code shall expire by limitation and become null and void if the
building or work authorized by such permit is not commenced within 180 days from the date of such permit, or if
the building or work authorized by such permit is suspended or abandoned at any time after the work is
commenced for a period of 180 days.
Based on the above, you are hereby advised to:
• Call the City Of Tukwila Permit Center at (206) 431 -3670 to arrange for the next or final
inspection.
This inspection is intended to determine if substantial work has been accomplished since issuance of the permit
or last inspection; or if the project should be considered abandoned.
If such determination is made, the Building Code does allow the Building Official to approve a one -time
extension up to 180 days. Extension requests must be in writing and provide satisfactory reasons why
circumstances beyond the applicants control have prevented action from being taken.
In the event you do not call for the above inspection or request and receive an extension prior to July 13, 2004,
your permit will become null and void and any further work on the project will require a new permit and
associated fees.
Thank you for your cooperation in this matter.
Steven M. Mullet, Mayor
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431.3665
December 1, 2003
Ralph Hagler
12201 Tukwila International Blvd
Tukwila, WA 98168 -5121
Dear Ralph:
Sincerely,
Stefania Spencer
Permit Technician
encl
xc: File No. D03 -345
File No. D03 -346
File No. D03 -347
File No. D03 -348
File No. D03 -349
File No. D03 -350
File No. D03 -351
City of Tuki,vila Steven M. Mullet, Mayor
Department of Community Development Steve Lancaster, Director
RE: CORRECTION LETTER #1
Development Permit Application Numbers D03 -345 - Wall L, D03 -346 — Wall M, D03 -347 -
Wall Ml, D03 -348 — Wall M2, D03 -349 — Wall N, D03 -350 — Wall R and D03-351 — Wall P
DHS Building —12500 Tukwila International Boulevard
This letter is to inform you of corrections that must be addressed before your development permit(s) can
be approved. All correction requests from each department must be addressed at the same time and
reflected on your drawings. I have enclosed comments from the Public Works Department. At this time
the Fire, Planning and Building Departments have no comments.
Please address the attached comments in an itemized format with applicable revised plans,
specifications, and /or other documentation. The City requires that four (4) complete sets of revised
plans, specifications and /or other documentation be resubmitted with the appropriate revision
block.
In order to better expedite your resubmittal, a `revision sheet' must accompany every resubmittal. I have
enclosed one for your convenience. Corrections /revisions must be made in person and will not be
accepted through the mail or by a messenger service.
If you have any questions, please contact me at (206) 433 - 7165.
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 -431 -3665
Documents /routing slip,doc
2-28-02
PERMIT COORD COPY
PLAN REVIEW /ROUTING SLIP
ACTIVITY NUMBER: D03 -350 DATE: 12 -12 -03
PROJECT NAME: DHS BUILDING - WALL "R"
SITE ADDRESS: 12500 TUKWILA INTERNATIONAL BLVD
Original Plan Submittal Response to Incomplete Letter #
X Response to Correction Letter # Revision # after /before permit is issued
DEPARTMENTS:
Building Division ❑ Fire Prevention ❑ Planning Division ❑
Public Works • G /2- Structural ❑ Permit Coordinator
DETERMINATION OF COMPLETENESS: (Tues., Thurs.) DUE DATE: 12 -16 -03
Complete [11f
Comments:
Incomplete
Permit Center Use Only
INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED:
Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
TUES /THURS ROUTING:
Please Route If Structural Review Required ❑ No further Review Required ❑
REVIEWER'S INITIALS: DATE:
APPROVALS OR CORRECTIONS: DUE DATE: 01 -13 -04
Approved ❑ Approved with Conditions Not Approved (attach comments) ❑
Notation:
REVIEWER'S INITIALS:
Permit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
PERMIT COORD COPY
Not Applicable ❑
DATE:
. iiirdat4Syca4i .•'. -. ,Gr..:... -u..v .....:.w„
w..+wawuuw�wUa
PERMIT COORD COPY
PLAN REVIEW /ROUTING SLIP
ACTIVITY NUMBER: D03 -350 DATE: 11 -10 -03
PROJECT NAME: DHS BUILDING - WALL "R"
SITE ADDRESS: 12500 TUKWILA INTERNATIONAL BL
X Original Plan Submittal Response to Incomplete Letter #
Response to Correction Letter # Revision #_after /before permit is issued
DEPARTMENTS:
II- I�a3 Mc/ hlg. li g -o• 1/ 7 -0
Bui Division • Fire Prevention • Plar ping Division LE
Public W i'Ul, or, . l 6ii,lwr ' (Q � o , Structural ❑ Permit Coordinator
Ar
DETERMINATION OF COMPLETENESS: (Tues., Thurs.) DUE DATE: 11 -13 -03
Complete E l Incomplete ❑
Not Applicable ❑
Comments:
Permit Center Use Only
INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED:
Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
TUES /THURS R�TING:
Please Route Structural Review Required ❑ No further Review Required ❑
REVIEWER'S INITIALS: DATE:
APPROVALS OR CORRECTIONS:
REVIEWER'S INITIALS:
Documents /routing slip.doc
2 -28.02
PERMIT COORD COPY
DUE DATE: 12 -11 -03
Approved 0 Approved with Conditions ❑ Not App roved ( attach
comments)
Notation:
DATE:
Permit Center Use Only
CORRECTION LETTER MAILED: /Wet 10
Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PWW Staff Initials:
11/40 /vo nru ii.uo ritA hUU cot UahU aauey t.urpOraL1UII
1908
City of Tukwila
Department of Community Development - Permit Center
6300 Southcenter Blvd, Suite 100
Tukwila, WA 98188
(206)431 -3670
Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted
through the mail, fax, etc.
Date: / ? 0 3
Plan Check/Permit Number: 1)03 - 35
❑ Response to Incomplete Letter #
❑ Response to Correction Letter # /
❑ Revision # after Permit is Issued
❑ Revision requested by a City Building Inspector or Plans Examiner
td A U." i"
Project Name:
Project Address: /2500 ?Wed/0 /4/T4<VA7&v .1511/1. 7 Witt ci2va-672/
Contact Person: j,4i -/ iJ,( Phone Number:.206 -- eZ / Mc)
Summary of Revision:
,6E✓✓C04/)204 ADA&
70P GJA44-444-VA-77or•J5 44046$
,e4 77i✓0' L4rr✓ ,5/2 /11/4/. kt &5
Sheet Number(s):
"Cloud" or highlight all areas of revision including date of revision
Received at the City of Tukwila Permit Center by: ,�l6
Z S Entered in Permits Plus on 12-72-63
08/06/03
IgJUUb
•
I
SIM MINIM =I an
• MINI En BIN OM 1•11 MI MEI
0
imt ow or no or am an Num or NE elk"
0
l0
•■•
0 0
00
0
0
0
A •
, , •
0
......... IIIM IMP Elli MN MI NM INN MI I= MI NM NM MMMMMMMMMM ME 111•1 II= IMI NM En MMMMM NM IM II= MI NM NM MI MI =I •I•1 MN IN OM 1•0 MI =1 MI MN 11= UM MIS IMIN MI MI MI an =MI NM NW Mil INN MI =II MIR NM ME NM UM • • • • ■ Mil ••• 110 lin MI MI Mil MI MS NM NM mei im NE we am miti NM MI MN ONO no me mu no um re MI NM 1•111 MIN MU am ir ow me me MI MIN OM IIMI ---- NM Nall M
I -_. .–.."... .
• .._ I
I
0
0 0
0
0
11111,
0
0 0
411 ON las
--
— am U ow; En sr no
MM
0
0 1111111.0. I
•
1111kIIINE
0
yA u, t
Goi* toolefo
414,416 foopit
WALL 1.4-2'
WALL '14-i'
WALL
GRAVITY WALL
WALL 'A'
or
•
IN.203CLOCY
L-27.2I'
fri.752
•
WALL •A UNDER SEPAVA TE PERMit
A PORTION OF THE SE 1/4 OF THE SE 1/4, SECTION 9 AND A PORTION OF THE 8W 1/4 OF THE 8W 1/4, SECTION 10, ALL IN T. 23 N., R 4 E., W.M.
R•20250'
WALL 'A'
GRANTY MALL
+AI
•
WALL 'L'
• • I= MI NINI 1•• II1= MEI MIN NMI MMMMM MI MD OM MIN MI =IP INN 11•• all NMI =II MN UM II= in all OM 1=1 MO — •I• 11•1 MI MO IM• •I•
MMMMMMMM MIN MMMMMM 11= ime me mg MMMM ...... MINI NMI NM ME MIN MN 111= UM =I •111111 ..... INN OM • •
••■•■• ■•••••
_ . — _
--‘*/
EAST ONE"QUARIER QUARTER
SECTION t Wi.R4E• Sit
TC. r vatliass CAP
=NM
rm.
•
jimailask
.M1111. AMIN.
•••
1
PROJECT DATUIA•14.45
PINNIECT DATIAMIS NAto0 4. 0.3S FEET
•
.. _
_.......-------
.... --------- - RIVE
...__
„..„.---- ....
P\73 CGS ELL BE 611ACZ,',. TO
•i_ Ti S7. 7TE OF WC7.1( WITHOUT 1
r - : - .7),r OF TUKWILA, etnew3 oivr
- —.3 VAU F - - • " - .7 A !prof 04,104 r ' ' "titk
14
0
0
WALL V
WALL
■•••■•■...■1•1111■•■••■■•■■••
............. NMI ..... .110 ............ lin MI5 MIN NMI IM IMO MI MI NMI NM me or ••• NIB nil NU 11= •
• 1.1 111. •
1111111111111111111.111111.61 II IIIIIIIIIIIIIIII111111111/11111
mu.
anIMMIMM.
•111111111..... 01.111 11
41111.■=
- • -
— _ — . ••■••••■.!
F.
.1■11111•••
AgtenNa1200.....
1. CONSIRUCT1011 SPECIFICATIONS ARE PER THE "MODULAR
BLOCK WALL user REPORT PREPARED BY EARTH CONSULTANTS,
FOR THE OHS BUILDING, TUKVIILA, WA. DAM) FEB 26. 2003.
SHEETS SIN AND SIA2 CONTAIN SPECIFICATIONS. SCHEDULES AND VARIOUS DETAILS.
ow.
A
0
MI ......... MIN ..... ENO MIN OM MN MI 1=1 MI MN •
•
U U •
1 .111111111111111111111111
7.,.1r1s • •
wirib cirry..
ts and
— respons
10-, ;he adc,;iia(y no, rt14*-thotally_with thc
A,'..iiionc..',AHons or ro",sions to these
voii ths :fcc.crince
7c:'iirc 1 -,••:' of rev :, drawings
1: 3_Lcnc,ir, i .01hieLt to F.71,1 inv, by
ht_ inspec!or.
2)zic
•
that the an Check approvals are
subject to . • a , issions and approval of
plans does not et** :z , . ,, , . of any
adopted code or ordi• ,- ace. Receo. —• .
copy of approved plans
NI CD IFI
0 15 30 so
FILE COPY
e
•
V DAVID !IVANS
meo ASSOC I AT II 111 INC.
1620 W. Mann View Drive, Sues 200
Everett Washington e201
Phone: 425.250.4009
RCHITICTS • AlA
130 LAKESIDE • SEATTLE, WA 95122 • 206 325 2553
DEPARTMENT OF HOMELAND SECURITY
SEATTLE DISTRICT OFFICE
12500 TUKWILA INTEFINA11ONAL BLVD.
EATTLE, wAsiticiroN
ar7=771177
vim .0.
Ir
11•0■INLANK., 11/ AM/
111111/1=1111 111
':4 - :4 — :4& ■Noi
I
•
•
Mir CZIMIS EIMPAPIPPIPIMMIIIIMI11111111111 11111.111111111111111111111
1 111sil lw ,
Niihmeismia•
itiZEI =I I ii
111111111111111
et
• I
ID
$7.50'
12.50' 15.00'
307.50'
ins 17.55
1
- - t •
TOP
AT
242.50'
25.31'
IN202.50'
dp7011
45.00'
22.
21'
17.21'
11301 •
h4152'42"
2.93'
C
2100'
500'
"--
NONNI°
0
&so'
MINIM 11110111111111111111NIMINESERVA2 •
MON I iiiii11111111111111111,1111mmum
hommulmollIIIIIMININ1111111111111M1
111111111111111111111111151111 I MN
1111111111111111111Rfil
119111111111.1•11
II
47.50'
0+00
0+50
- 80
60
WO:-
1
so
WALL AREA ase SF
0+00
ELEW77.5
APPROX GRADE AT
FACE a AU.
W
WALL H-1 -----,
MN4 DEPTH OF WALL
BELOW GRADE
61■141Z5
_j
0+00
1+00
0+50
83.96
_j J
0+50
•
1+50
mmunownewasniummmonwimmuminumom
mlimmiampolimmummummumennummummimomi
INNIMINIONNOMIIIIIIIIMINOIMINIIINIIIIIIIIIMNIIIIII
IIMIONiiiimill MUL JO
iiiiim.
11911141111111
1111
r • 1'
1+00
40.00
ELE*47.5
ELEV.45.0
0
3.96
4000
E
11111/1111111111
111111111111111FA
11111111111111111FA
111111111111111111111511
11111111111111Eill
11111111111111111110111
1111111111111111ms
nimminnown
momrson
gam a
WALL 'N' PROFILE
SCALE:1' HORZ
r-i0' %CRT
APPROX GRADE AT
FACE OF WALL
= WIIII .
J111 lifirri.TIJ . 1111111111 - 1111_ I
musismoommiwommwommummieworillik, III 1111 I IV NIVIIIITRIIIIITIMILI E 3 2 I MP NMI I N I I I I I I NI I III I
-i arlibra _WWII' I M11111111111111111111111111111111111111111111111111111111111IMEMIZEMMIIIIIMINIMININI
I ,
; I Nina" .11%1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111NIMIIIiiiiiiM=2:1:MMICEMAIIIII
Millaiiiiiiiiiifisi•
WAU. AREA is,406 'ffiimasemscISENNIIIIMIIIIMIIIIIIIIIIIIIMEIMINIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII111111111111111111111111NMIIIIINIIIIIIIIIIIIIIN
GRADE Ai INIIIIIMMININSIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIMIEMIIMEMINIMI
- - grO WALL INSINIMMINIIIIIIIIIIIIIIIINIMINIIMINIIIIIIIIIIIIIIIIIIIIIIIIIIIM1111111111111111111111111111111111111111111111111111111111
W0tv MADE -.7- MEINNI11111111111111111111111111111111MMIIIIIIIIIIIIIIIIIIIIIIIIIIIIINIIIIIIIIIIIIIIIIINIMirommenm
loll DEPTH OF INA"
! ISHMIMINIIIMPIESFINNIIIIIMINIMIMMIIIMMIll 11111111111111111111 I IMMIErroglinIMUMI
MIN oriiiimilliiiil INININIIIIIIIIIIIIIII1111111111111111111111111111Mii iiiiliffiLMIIII
gm MENIIIIMMINIUMMI 1111111111111111111111111 WIN Mil 111111111011
111109M11111111111N111111111 MIN ill ill
Sail lifell11111111111111Mil I
EN 62311111111111170111
111111112151
NMI
285.00'
MIEIMMUM =
11/1NOMMOMENEMNIII0
MM
MM
=
MM
sari DEPTH OF WALL,
BELOW GRADE
2+00
1+50
WALL AREA 15178F
STEPS TO UPPER
SIDEWALK
WORONT OF WALL
4
2+50
2+00
100
STEPS TO UPPER
SIDEWALK '
• BEHIND WALL
r
FLOW
SO I ;
r -
3+00
GRADEAT -;
OF WAII (10.47.5
, ! ,
f
, i , - , WALL AREA 5825 SF
WALL 'M' PROFI' LE I i
,
,
1
SCALE:1".30' HO „
RZ ,
1 VERT I
i I
, .
! ,
2+50
0+00
10.0'
3+50
3+00
MIEN
111111INCRUNIIMI
111111111111111N5CREINIMII
mommir
111111111111111111110111111111MIERMIPM
111111111111111111111111111111MIMMOINI
11111111.1111111111111111111111111111MMOSHNOMI
angrommenumummuummummummiimplamm
........mmummumommummusiscumum
UMNOMMONIIMMOIMINiiiille AMMO IIIIIIRMA1111111111111111111MEMBSPOIM
karatigNMENNIMilj
AT %TM
0+50
670.00
4+00
3+50
•
277.50
4+50
4+00
5+00
375.00'
Top ...., LGR:E AT
w
NEM.77.6'
i APROX
;
•
. i CE OF
FA 1
1
4+50
2+00
5+50
5+00
___
OLE*47.5
, -
,
MOLL AA 5094
GRADE AT
TOP-BACK 03F WALL ;
FAO
.1,1151111221:211.11
FAIIN1111111111111111111110111111111111111111111iiiiiiisai.S2119M111111111111111
2 . 101111111111111111111111111111111111111111111111111111MiC
FAIIIIIIINIIII1111111111111111111111111•111111.11111111111111111111111111111111111111
1101111111111111111111101111111111111111111111111111111411111111111111
1/1111111111111.1119111111111111=111111111111111000.1111.9._
_ill 111,11111111ME 111.11,1,11,111111111111111EL...momigillalimis3
plarRIMOINN.m.olommenima m miii
, *A. 'P MALE
I I I SCALE: • a30' 14ORZ
1 I
1%40' J 1 VDU
_J. ,
1+00 1+50
APPROK
AT
MEM
MIN DEPTH OF WALL
BELOW GRADE
•
j100
so
1111104
W
6+00
MN OW TH OF WALL.
130.091 GRADE
5+50
8+50
viumxto
6+00
1
11LW17.6
7+00
6+50
AIM
7+50
80
. , 60
8+00
80
60
8+50
9+00
WALL, AREA 388 SF
WALL 'M-1' PROFILE
HORZ
ratter VERT
1 _ _
Loopmc NORTH
9+50
, 13,0 04G
Et 1Z 1".1
tovc.
omso
10+50
11+
WAU,' AlEA 388 SF
11+50
60
WALL 'M-2' PROFILE
. SCALE:1'040 HORZ ,
1 rsur :VERT LOOKING SOUTH
! .
,........_ ,
•
AREA 2496
SCALE:1"
1"
20
ao
60
27101911111
ilkiimisammu my ammo=
mismoriremmuumw
Whoommill
Mil I
TOP
get
0
6+00
Emmies
uIu -
Ego
marammusamommum
immummarasommegaunsummo
isiessmillAPROMOOlptemminim
OVENNIDWZIAMMOMMERamp
WALL AlEA 3344 SF mumnisir
375.00
, _. _.
I sPilith ACE OF "( WALL AT
i i t
; I
i . MIN DIM OF WALL
_ l aa __ VaCli I
itif . AL. Lw __ a r
0+50 1+00 - 1+50
1 HORZ
laRT
GRADE
BAOC OF
2+00
AT
WAU.
1
-.
3+50
80
STEPS BEHIND
. 100
60
111111 DAVID EVAN
AND ASSOCIATES me.
1620 W. Marine View Drtve, Sues 200
Everett Washington 96201
Phone: 425.250.4099
A C PI I 1r I C TS • A 1 A
130 LAKESIDE • SEATTLE, WA 98122 • 200 325 2553
umr7,7r7mrommommoommxn.
IIIMK7117777601111111111111EMME.1177479M
ONO
•
Geogrid Layer Spacing (Ft.)
(Measured From Bottom of Wall)
C _ -.
- (
"` r t. . _
i
Lock-Block
Wall Height (ft.)
Geogrid Length (ft.)
1
-
2
3
4
5
6
r
7
8
_
9
10
5.0
-
6.0
2.5
-
-
_
_
_
_
_
_
OP
7.5
8.0
2.5
5.0
T
-
-
-
-
_
-
ND
-
-
10.0
10.0
2.5
5.0
7.5
-
-
-
-
-
-
-
12.5
12.0
2.5
5.0
7.5
10.0
-
-
-
-
-
-
15.0
14.0
2.5
5.0
7.5
10.0
12.5
-
_
-
-
-
17.5
16.0
2.5
5.0
7.5
10.0
12.5
15.0
-
-
-
-
20.0
18.0
2.5
5.0
7.5
10.0
12.5
15.0
17.5
-
-
-
22.5
20.0
2.5
5.0
7.5
10.0
12.5
15.0
17.5
20.0
-
-
25.0
22.0
2.5
5.0
7.5
10.0
12.5
15.0
17.5
20.0
22.5
-
27.5
22.0
2.5
5.0
7.5
10.0
12.5
15.0
17.5
20.0
22.5
25.0
9
SPECIFICATIONS:
MODULAR BLOCK AND MSE WALL CONSTRUCTION
GENERAL.
A. Work shall consist of furnishing and construction of a Modular Block and MSE
Retaining Wall System in accordance with these specifications and in
reasonably doss conformity with the lines, grades, and dimensions shown on the plans.
B. Work includes preparing foundation soil, furnishing and installing leveling pads, drainage
fill and backfill to the lines and grades shown on the construction drawings.
C. Work Includes furnishing and installing geogrid soil reinforcement of the type, size,
location, and lengths designated on the construction drawings and MSE Wall Schedule.
SUBMITTALS
A. Contractor shall submit a Manufacturer's certification, prior to start of work, that the
retaining wall system components meet the requirements of this specification and the
structure design.
B. Contractor shall submit a test report documenting strength of specific modular concrete
unit and geogrid reinforcement connection. The maximum design tensile load of the
geogrid shall be equal to the laboratory tested ultimate strength of geogrid I facing unit
connection at a maximum normal force limited by the "Hinge Height" of the structure
divided by a safety factor of 1.5.
QUAUTY ASSURANCE
A. Contractor shall submit certification, prior to start of work, that the retaining wall system
(modular concrete units and specific geogrid) has been successfully utlilized on
similar projects, i.e., height, soil fill types, erection tolerances, etc.
B. Contractor shall demonstrate prior experience on projects of similar size
and magnitude where the specific retaining wall system has been
constructed successfully. Contact names and telephone numbers shall be listed for each
Proi -
C. Owner shall provide soil testing and quality assurance inspection on a full -time basis
during earthwork and wall construction operations. Owner's quality assurance program
does not relieve the contractor of responsibility for wall performance.
DELIVERY, STORAGE AND HANDLING
A. Contractor shall check all materials upon delivery to assure that the proper type, grade,
color, and certification has been received.
B. Contractor shall protect all materials from damage due to jobsite conditions and in
accordance with manufacturer's recommendations. Damaged materials shall not be
incorporated into the work.
PRODUCTS
DEFINITIONS
A. Modular Block a concrete retaining waH element machine made from
portland cement, water, and aggregates.
B. Structural Geogrid: a structural element formed by a regular network of integrally
connected tensile elements with apertures of sufficient size to allow interlocking with
surrounding soil, rock, or earth and function primarily as reinforcement.
C. Unit Drainage File drainage aggregate which is placed immediately behind
the modular concrete units.
D. Reinforced Backfill: compacted soil which is placed within the reinforced soil volume as
outlined on the plans.
MODULAR RETAINING WALL UNITS
A. Modular Block units shall conform to the following architectural requirements:
face color: concrete gray - standard manufacturers color may be specified by the
Owner.
bond configuration: running with bonds nominally located at midpoint vertically adjacent
units, in both straight and curved alignments.
8. Modular Block materials shall conform to the requirements of ASTM C1372-
Standard Specifications for Segmental Retaining Wall Units.
C. Modular Block units shall conform to the following structural and geometric
requirements measured in accordance with appropriate references:
compressive strength = 3000 psi minimum
absorption = 8% maximum (6% in northern states) for standard weight aggregates
unit size: 2.5' (H) x 5.0' (W) x 2.5' (D) minimum
unit weight: 4,320 lbs. I unit
BASE LEVEUNG PAD MATERIAL
A. Material shall consist of Drainage Fill (1" Minus Crushed Rock) and placed as
shown on the construction drawings.
DRAINAGE FILL
A. Unit drainage fill shall consist of clean 1" minus crushed rock meeting the following
gradation tested in accordance with ASTM D -422:
amain
1 inch
3/4 inch
No. 4
No. 50
PinifiLP
100
75-100
0 -10
0 -
I
REINFORCED RACKFILL
A. Reinforced baddill shall be free of debris and have a moisture content that is at or new
the optimum level.
B. The maximum aggregate size shall be limited to 1 1/2 inches unless field tests have been
performed to evaluate potential strength reductions to the geogrid design due to damage
during construction.
C. Unsuitable soils for backfill (high plastic clays or organic soils) shall not be used in the
backfill or in the reinforced soil mass.
The fill material shall meet the following gradation:
alava,,gii$ Peroont Paatipg
1 1/2 inch 100 - 75
3/4 inch 100 - 75
No. 40 0 - 60
No, 200 0 - 35
Fill that does not meet the above gradation must be approved by the geotechnical
engineer.
GEOGRID SOIL REINFORCEMENT
A. Geosynthetic reinforcement shall consist of geogrids manufactured specifically for soil
reinforcement applications and shall be manufactured from high tenacity polyester yam
or high density polyethylene. Polyester geogrid shall be knitted from high tenacity
polyester filament yam with a molecular weight exceeding 25,000 Meg/m and a carboxyl
end group values less than 30. Polyester geogrid shall be coated with an impregnated
PVC coating that resists peeling, cracking and stripping.
B. Geogrid long term design strength shall be at least 4,700 lbs./ft for walls 15.0 feet
or higher. For walls 12.5 feet or less, LiDS shall be at least 2,800 lbs./ft. The contractor
shall provide manufacturers specifications to the geotechnical engineer for review
and approval.
C. Manufacturing Quality Control
The geogrid manufacturer shall have a manufacturing quality control program that
includes QC testing by an independent laboratory.
The QC testing shall include:
Tensile Strength Testing
Melt Flow index (HDPE)
Molecular Weight (Polyester)
DRAINAGE PIPE
A. The drainage pipe shall be rigid perforated PVC pipe manufactured in accordance
with ASTM D-3034.
EXECUTION
EXCAVATION
A. Contractor shall excavate to the lines and grades shown on the construction drawings.
The geotechnical engineer shall observe the excavation and approve prior to placement
of leveling material or fill soils. Proof roll foundation area as recommended by the
geotechnical engineer to determine if remedial work is required.
B. Over- excavation and replacement of unsuitable foundation soils and replacement with
approved compacted fill will be compensated as agreed upon with the Owner.
BASE LEVEUNG PAD
A. Leveling pad material shall consist of Drainage Fill, and shall be placed as shown on
the construction drawings, to a minimum thickness of 12 inches.
B. Soil leveling pad materials shall be compacted to a minimum of 95% Modified Proctor
density per ASTM D- 1557 -91.
Leveling pad shall be prepared to insure full contact to the base surface of the concrete
units.
MODULAR -BLOCK UNIT INSTALLATION
A. First course of Modular Blocks shall be placed on the leveling pad at the appropriate line and
grade. Alignment and level shall be checked in all directions and insure that all units are
in full contact with the base and properly seated.
B. Place the front units side - by - side. Do not leave gaps between adjacent units. Layout
of corners and curves shall be in accordance with manufacturer's recommendations.
C. Place and compact drainage fill behind Modular Block wall units. Place and
compact reinforced backfill soil behind drainage fill. Follow wall erection and drainage fill
closely with structural backlit!.
D. Maximum stacked vertical height of Modular Block wall units, prior to unit drainage fill and
backfill placement and compaction, shall not exceed two courses (5 feet).
STRUCTURAL GEOGRID INSTALLATION
A. The geogrid strength, perpendicular to the wall alignment, shall meet the strength
specifications.
B. Geogrid reinforcement shall be placed at the strengths, lengths, and elevations shown on
the construction design drawings or as directed by the Engineer.
•
C. The geogrid shall be laid horizontally on compacted backfill and attached to the Lodc -Block
modular wall units. Place the next course of modular concrete units over the geogrid. The
geogrid shall be pulled taut, and anchored prior to baddill placement on the geogrid.
0. Geogrid reinforcements shall be oontinous throughout their embedment lengths and
placed side-by -side to provide 100% coverage at each level. Spliced connections
between shorter pieces of geogrid or gaps between adjacent pieces of geogrid we not
permitted.
REINFORCED IACKFILL PLACEMENT
A. Reinforced backfill shall be placed, spread, and compacted in such a manner that
minimizes the development of slack in the wowed and installation damage.
B. Reinforced baddill shall be placed and compacted in lifts not to exceed 6 inches where
hand compaction is used, or 10 inches where heavy compaction equipment such as rollers
is used. Lift thickness shall be decreased to achieve the required density as required.
C. Reinforced backfill shall be compacted to 90% of the maximum density as determined
by ASTM D- 1557 -91. The moisture content of the backfill material prior to and during
compaction shaN be at or near the optimum moisture content.
D. Only lightweight hand - operated equipment shall be allowed within 3 feet from the
modular concrete unit.
E. Tracked construction equipment shall not be operated directly upon the geogrid
reinforcement. A minimum fill thickness of 6 inches is required prior to operation of
tracked vehicles over the geogrid. Tracked vehicle turning should be kept to a minimum
to prevent tracks from displacing the fill and damaging the geogrid.
F. Rubber tired equipment may pass over geogrid reinforcement at slow speeds, less than
10 MPH. Sudden braking and sharp turning shall be avoided.
G At the end of each day's operation, the Contractor shall slope the last lift of reinforced
backfill away from the wall units to direct runoff away from wall face. The Contractor
shall not allow surface runoff from adjacent areas to enter the wall construction site.
AS -BUILT CONSTRUCiiON TOLERANCES
A. Vertical alignment: +1.5" over any 10' distance
B. Wall Batter. within 2 degrees of design batter
C. Horizontal alignment: +1.5" over any 10' distance
Comers, bends, curves +1 ft. to theoretical location
D. Full contact between blocks shall be maintained.
FIELD QUAUTY CONTROL
A. The wall construction shall be observed by the geotechnical engineer on a full time
basis. Testing of the compacted backfill shall be performed by the geotechnical
engineer.
B. As a minimum, quality assurance shall include foundation soil inspection, soil and
backfill testing, verification of design parameters, and observation of construction for
general compliance with design drawings and specifications.
•
NOTE: For tiered walls consider the overall effective height of the tiered wall system
required geogrid length from the reinforcement schedule.
•
when arrrinirf�
C L.
MODULAR BLOCK - MSE WALL : REINFORCEMENT SCH LE 5
PI cy
col
P. 9.:
ter! off'
►�+.
a •
b a v
C
r. r-� ►-. c
r;
{
!3
0
(7
C.
c.
r
v
Q
ri
r.
'
M
3•
C-
.
r
r
C;
r .
0
CD
C
•
0
tc)
ciN
,.-
•
e S