Loading...
HomeMy WebLinkAboutPermit D03-350 - DHS BUILDING - WALL RDHS BUILDING - WALL "R" 12500 TUKWILA INTERNATIONAL BLVD D03 -350 Parcel No.: 7340600602 Address: 12500 TUKWILA INTERNATIONAL BL TUKW Suite No: Tenant: Name: Address: Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Fire Loop Hydrant: Flood Control Zone: Hauling: Land Altering: Landscape Irrigation: Moving Oversize Load: Sanitary Side Sewer: Sewer Main Extension: Storm Drainage: Street Use: Water Main Extension: Water Meter: doc: Devperm City of Tukwila Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 DHS BUILDING - WALL 'R' 12500 TUKWILA INTERNATIONAL BL, TUKWILA WA INTRNL GATEWAY EAST III 12201 TUKWILA INTRNTL BLVD, SEATTLE WA RALPH HAGLER 12201 TUKWILA INTERNATIONAL BL, TUKWILA WA SABEY CONSTRUCTION INC. Value of Construction: $ $50,000.00 Type of Fire Protection: Type of Construction: Public Works Activities: Channelization / Striping: N Curb Cut / Access / Sidewalk / CSS: N N N N N N N N N N N N N DEVELOPMENT PERMIT Number: 0 Start Time: Volumes: Cut Start Time: Private: N Profit: N Private: N D03 -350 Permit Number: Issue Date: Permit Expires On: Phone: Phone: 206 281 -8700 Phone: 206 - 281 -4700 Address: 12201 TUKWILA INTERNATIONAL BLVD, SEATTLE WA Contractor License No: SABEYCI033KM Expiration Date:01 /06/2005 DESCRIPTION OF WORK: CONSTRUCTION WALL "R" MODULAR BLOCK WALL FOR PORTION OF THE NORTH PARKING LOT. Size (Inches): 0 End Time: 0 c.y. Fill 0 c.y. End Time: Public: Non - Profit: Public: DO3 -350 12/31/2003 06/28/2004 Fees Collected: $1,576.69 Uniform Building Code Edition: 1997 Occupancy per UBC: N N N Printed: 12 -31 -2003 Signature: doc: Devperm City of Tukwila Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 Permit Center Authorized Signature: Date: u,3 I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating con strw�tion Qr the pformance of work. I am authorized to sign and obtain this development permit. D03 -350 Print Name: � A.11(� L ig, This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. Printed: 12 -31 -2003 City of Tukwila Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 z • z re w QQ � J U O 0 0 CO W= F- w 0 2 g I � z = 4: All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1997 z O Edition) as amended, Uniform Mechanical Code (1997 Edition), and Washington State Energy Code (1997 Edition). n 0 5: Validity of Permit. The issuance of a permit or approval of plans, specifications, and computations shall not be 0 D- construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any in H other ordinance of the jurisdiction. No permit presuming to give authority to violate or cancel the provisions of this w • w code shall be valid. u- O w z U = 0 I Parcel No.: 7340600602 Permit Number: D03 -350 Address: 12500 TUKWILA INTERNATIONAL BL TUKW Status: ISSUED Suite No: Applied Date: 11/10/2003 Tenant: DHS BUILDING - WALL 'R' Issue Date: 12/31/2003 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 2: No changes will be made to the plans unless approved by the Engineer and the Tukwila Building Division. 3: All permits, inspection records, and approved plans shall be available at the job site prior to the start of any construction. These documents are to be maintained and available until final inspection approval is granted. 6: ** *PUBLIC WORKS DEPARTMENT CONDITIONS * ** PERMIT CONDITIONS 7: Contractor shall notify Public Works Utility Inspector at (206)433 -0179 of commencement and completion of work at least 24 hours in advance. 8: Work affecting traffic flows shall be closely coordinated with the City Utilities Inspector. Traffic Control Plans shall be submitted to the Inspector for prior approval. 9: Flagging, signing and coning shall be in accordance with MUTCD for Traffic Control. Contractor shall provide certified flagmen for traffic control. Sweep or otherwise clean streets to the satisfaction of Public Works each night around hauling route (No flushing allowed). Notify City Inspector before 12:00 Noon on Friday preceding any weekend work. 10: Any material spilled onto any street shall be cleaned up immediately. 11: A copy of the Certificate of Insurance Coverage (minimum of $1,000,000 naming the City of Tukwila as additionally insured). 12: A map which shows the haul route. 13: Hauling over 50 cubic yards shall require application for a Hauling Permit prior to any associated activity. 14: Clean and remove debris from City catch basin in and around hauling routes. Provide adequate temporary access as not to interfere with other vehicle movement or cause trucks to travel over curbs. All vehicles must make a complete stop prior to entering public right -of -way. 15: Business License with the City of Tukwila. 16: Route Map. doc: Conditions D03 -350 Printed: 12 -31 -2003 ' e s:�iJr'ri ;;xJtisL'�t,Yt1 aV.. 4.1 • • z Signature: doc: Conditions City of Tukwila Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 I hereby certify that I have read these conditions and will comply with them governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or regulating construction or the performance of work. Print Name: 0Axt 44 LEN67 D03 -350 as outlined. All provisions of law and ordinances cancel the provision of any other work or local laws Date: 12 ( VO3 Printed: 12 -31 -2003 • YPIT r" ' e • '4 yt" 1424 yin4, "L'V'AtitVA' , A King Co Assessor's Tax No.: Site Address: /0G Tlik0 i L94P7a-7 g , Suite Number: Tenant Name: DNS Heidckni edaW * . f " Property Owners Name: ..(1742_ei C.c;), 17;t4 eN1 Mailing Address: /22 77/ktot /cc, eryi SIP/7a / te/vd. Tt;hivilet. , WA-, ?8(68- 57Z City State Zip #09/ei- Mailing Address: /02 Name: E-Mail Address: Company Name: C4t Lkkini/v. Mailing Address: City Day Telephone: Fax Number: Contact Person: E-Mail Address: Contractor Registration Number: Expiration Date: **An original or notarized copy of current Washington State Contractor License must be presented at the time of permit issuance** ARCHITE Company Name: Mailing Address: State Contact Person: E-Mail Address: Company Name: Mailing Address: Contact Person: E-Mail Address: \applicationskpemni application (3.2003) 3/2003 CITY OF TUKWILA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** rita David ti/ah5 avid 117c5cacdes 0 rioe. V 7± 2a7 E *pp• coyvi efikk.W; W.PPMP,ii , Falai( • -V - t2r 04. 14 ! • •1.140 ' • tg v . Page 1 vra Day Telephone:( 2-c9/- 7 V , 1- Wikc city Fax Number: New Tenant: •• . - 754zo0 -a6az -1 D..No Floor: D.... Yes State State 8 8 5 Zip Zip Zip t, • City Day Telephone: Fax Number: City State 25y --4- Day Telephone: (425 Fax Number: (4/ is 2 Z 7t9 \applications ■permit application (3.2003) 3/2003 Page 2 FIRE PROTECTION/HAZARDOUS MATERIALS: ❑ .. Sprinklers 0 ..Automatic Fire Alarm ❑ ..None . Other (specify) ., Valuation df'Project (contractor's bid price): $ 5O, 000 Existing Building Valuation: s Scope of Work (please provide detailed information): Celn 5+I(V.C.)t (1:>:.A../( I (34 tt Will there be new rack storage? 0 ..Yes 0.. No If "yes ", see Handout No. for requirements. Proytde Al! Building Areas in Squalre FdotageBelow • l "'Floo r..:: ; Y .. 20O.FloOt 3f° Floor Floors thni Basement Accessory Structures :Attached. Garage :.,. Detached Garage Attached ; • Detached Carport Covered Deck :: • :'Uncovered Peck "Addition °Cd Extstmg., . fracture `Type Qf;; Constructioin per UBC Type of Occupancy per UBC PLANNING DIVISION: Single- family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area for accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? 0 ....Yes 0 ..No If "yes ", explain: Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑..Yes []..No If "yes", attach list of materials and storage locations on a separate 8 -1/2 x I I paper indicating quantities and Material Safety Data Sheets. 5J; :g �n•Y±± r �. y .�. . J 7t , . " aa.�w` } ak• :n (t »r 7t !"rrfrr •vli+xc t r K� Y i !xY t°} ,x t �i r y 1 .M&Ai ifiar:? tl,: 1jY: �" c: j?'_ W•:... :p�'� :�te• , fb�i''s�'�lt�� + h.�'e .ti ir, .�. . r ..��f "Fn �.raa Scope of Work (please provide detailed information): lease refer to.Put li&Works Bulletin #1:for fees and estimate sheet. Water District ❑ ...Tukwila 0... Water District #125 ❑ ...Water Availability Provided Sewer District ❑ ...Tukwila ❑ ... ValVue ❑ .. Renton ❑ ...Seattle ❑ ...Sewer Use Certificate 0... Sewer Availability Provided ❑ .. Approved Septic Plans Provided ❑ ...Septic System - For onsite septic system, provide 2 copies of a current septic design approval by King County Health Department. Submitted with Application (mark boxes which apply): ❑ ...Civil Plans (Maximum Paper Size — 22" x 34 ") ❑...Technical Information Report (Storm Drainage) ❑ ...Bond ❑ .. Insurance ❑ .. Easement(s) Proposed Activities (mark boxes that apply): ❑ ...Right -of -way Use - Nonprofit for less than 72 hours ❑ ...Right -of -way Use - No Disturbance ❑ ...Construction/Excavation/Fill - Right -of -way Non Right -of -way ❑ ...Total Cut ❑ ...Total Fill ■applicationa\permit application (3 -2003) 3/2003 cubic yards cubic yards ❑...Sanitary Side Sewer ❑ ...Cap or Remove Utilities ❑...Frontage Improvements ❑ ...Traffic Control ❑ ...Backflow Prevention - Fire Protection Irrigation Domestic Water ❑...Permanent Water Meter Size... ❑...Temporary Water Meter Size.. ❑ ...Water Only Meter Size ❑ ...Sewer Main Extension Public ❑ ...Water Main Extension Public _ ❑ .. Abandon Septic Tank ❑ .. Curb Cut ❑ .. Pavement Cut ❑ .. Looped Fire Line / Call before you Dig: 1- 800 - 424 -5555 W.O# WO# WO# Private Private ❑ .. Highline ❑ .. Work in Flood Zone ❑ .. Storm Drainage Page 3 ❑ ...Renton ❑ .. Geotechnical Report ❑...Traffic Impact Analysis ❑ .. Maintenance Agreement(s) ❑...Hold Harmless ❑ .. Right -of -way Use - Profit for less than 72 hours ❑ .. Right -of -way Use — Potential Disturbance ❑ .. Grease Interceptor ❑ .. Channelization ❑ .. Trench Excavation ❑ .. Utility Undergrounding ❑ ...Deduct Water Meter Size FINANCE INFORMATION Fire Line Size at Property Line ❑...Water ❑ ...Sewer Monthly Service Billing to: Name: Mailing Address: Water Meter Refund/Billing: Name: Mailing Address: Number of Public Fire Hydrant(s) ❑ ...Sewage Treatment Day Telephone: City State Zip Day Telephone: City Stale Zip .`t":,`;•� , {+�,�v:4.�;ct�a7iiviiaY'i �!SG!:ai�7,`.�,".'W:•+i Unit Type: : Qty ':Unit TYPe� '. Qty Type:. yp Qty ., .;Boiler /Compressor: . Qty Furnace <100K BTU Air Handling Unit >= 10,000 CFM Other Mechanical Equipment 0 -3 HP /100,000 BTU Furnace>100K BTU Evaporator Cooler 3 -15 HP /500,000 BTU Floor Furnace Ventilation Fan 15 -30 HP /1,000,000 BTU Suspended/Wall/Floor Mounted Heater Ventilation System 30 -50 HP /1,750,000 BTU Appliance Vent Hood 50+ HP /1,750,000 BTU Heat/Refrig/Cooling System Incinerator - Domestic Air Handling Unit <= 10,000 CFM Incinerator — Comm/Ind ,m,� a'� , .r:.�t; ,�- k ,� �..'��'` , , MECHANICAL CONTRACTOR INFORMATION Company Name: Mailing Address: City Day Telephone: Fax Number: Contact Person: E -Mail Address: Contractor Registration Number: Indicate type of mechanical work being installed and the quantity below: Signature: Print Name: E fr - fl'/ ero F a rte ' / mays Mailing Address: \applications ■permit application (3.2003) 3/2003 3136 ; 2C16�" 70 h ;at�rta Page 4 Expiration Date: City State **An original or notarized copy of current Washington State Contractor License must be presented at the time of permit issuance ** Valuation of Project (contractor's bid price): $ Scope of Work (please provide detailed information): Use: Residential: New ....0 Replacement .... 0 Commercial: New ....0 Replacement ....0 Fuel Type: Electric Gas ....❑ Other: Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 107.4 of the Uniform Building Code (current edition). No application shall be extended more than once. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STAFF OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER O UTHOR!ZED AQENT Date: (/ —7- d 3 Day Telephone:(TZ' 2 - 5- 1 — `7'v '7? �- zoo 0 am State 2) Zip Date Application Accepted: /i 7o - 03 Date Application Expires: Staff Initials: s i •L Payee: TRANSACTION LIST: ACCOUNT ITEM LIST: Description doc: Receipt City of Tukwila 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 Parcel No.: 7340600602 Permit Number: D03 -350 Address: 12500 TUKWILA INTERNATIONAL BL TUKW Status: APPROVED Suite No: Applied Date: 11/10/2003 Applicant: DHS BUILDING - WALL 'R' Issue Date: ID gas Receipt No.: R03 -01580 Payment Amount: 950.25 U co Initials: SKS Payment Date: 12/31/2003 01:48 PM 1 w User ID: 1165 Balance: $0.00 Z 1 1— O Z 1-- w uj U c o 0- O 1- w w = U ' Type Method Description Amount ~O . Z Payment Check 91104 950.25 U co 1-- O~ SABEY PROPERTIES LLC BUILDING - NONRES PW BASE APPLICATION FEE PW PERMIT /INSPECTION FEE STATE BUILDING SURCHARGE Account Code Current Pmts 000/322.100 000/322.100 000/342.400 000/386.904 RECEIPT 643.75 172.00 130.00 4.50 Total: 950.25 , 12/3i. {1716 m rAL 6151.39 vog Printed: 12 -31 -2003 Z Z Z J U 00 O o J • = f— U) u. w Receipt No.: R03 -01570 Payment Amount: 208.00 g (o Initials: LAW Payment Date: 12/29/2003 03:48 PM = w f!— _ User ID: 1630 Balance: $950.25 Z Payee: SABEY PROPERTIES LLC ACCOUNT ITEM LIST: Description doc: Receipt City of Tukwila 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 RECEIPT Parcel No.: 7340600602 Permit Number: D03-350 Address: 12500 TUKWILA INTERNATIONAL BL TUKW Status: PENDING Suite No: Applied Date: 11/10/2003 Applicant: DHS BUILDING - WALL 'W Issue Date: TRANSACTION LIST: Type Method Description Amount Payment Check 91010 208.00 PW BASE APPLICATION FEE 000/322.100 PW PLAN REVIEW 000/345.830 Account Code Current Pmts 78.00 130.00 Total: 208.00 6053 12/30 9716 TOTAL. 3309.00 A Printed: 12 -29 -2003 Parcel No.: Address: Suite No: Applicant: Initials: SKS User ID: 1165 Payee: ACCOUNT ITEM LIST: Description doc: Receipt City of Tukwila 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 DHS BUILDING Receipt No.: R03 -01359 SABEY PROPERTIES LLC TRANSACTION LIST: Type Method Description Payment Check 90271 PLAN CHECK - NONRES 000/345.830 RECEIPT 7340600602 12500 TUKWILA INTERNATIONAL BL TUKW Account Code Permit Number: Status: Applied Date: Issue Date: Payment Amount: 418.44 Payment Date: 11/10/2003 03:23 PM Balance: $648.25 Amount 418.44 Current Pmts 418.44 Total: 418.44 D03 -350 PENDING 11/10/2003 4579 .11/12 1716 TOTAL 4362.00 iA Printed: 11 -10 -2003 z U0 CO • W J CO W w0 Q 2 LLQ = • d w z = I- I- 0 Z • uj 2 • o' U O N . o w W H H . — U. 0 Z w 0 z Project: 1:)"1AS Type of Inspection: r ` AdIres_ s: Date Called: � Special Instructions: Date Wanted: p.m. Requester: Phone No: INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 171 . Approved per applicable codes. Corrections required prior to approval. COMMENTS: O Inspector: r Date: $47.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: Projects )4 s Type of Inspection: p w Address: 25 TT B Date Called: eSi 0 Li Special Instructions: 8 W A Date Wanted: 9i/2j" / O a.m. p.m. Requester: D °VI/ S Phone cL4 No 5 1512. 4 INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431-3670 El Approved per applicable codes. COMMENTS: p,QA 60, Tit N itby f AAteN‘ iii(ott rtAt.ek c.e.meel ( r T P-ef git/Lot kA )2A .e.e,A 64 Os“( Inspector: 6-0 Date: q2),Voti El $47.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: D El Corrections required prior to approval. Project: ( Type of Inspection: Address: Date Called: Special Instructions: Date Wanted: �f,� 7–�, ,. Requester: J Phone No: INSPECTION RECORD Retain a copy with permit INSPECTIO NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 V Approved per applicable codes. (206)431 -3670 COMMENTS: El Corrections required prior to approval. Date: "7 $47.0 EINSPECTION I EE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: Project: i s Type of Inspection: Addres : /— c 6��/ /� Ft/3 Date Called: Special Instructions: Date Wanted: Requester: Phone No: z INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (Approved per applicable codes. 'COMMENTS: INSPECTION RECORD Retain a copy with permit (206)431 -3670 El Corrections required prior to approval. El $47.00 REiNSPECTION FEE4tEQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: I 3 INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 981 88 PERMI (206)431-3670 I:I Approved per applicable codes. Corrections required prior to approval. COMMENTS: ( 7 7 - ' 11 -e/( Cvo /4/4( 19) r • -.:.-',.••• Date: 2,4?..oti , Ei $47.0 REINSPECTION FE5. REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: Type of Inspecp: Aild(es.,.._ 1 6 Date Called: (.. V Spdial Instructions: Date Wanted: tp.m. Requester: i \......." Phone No: S/0 — 7S I 3 INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 981 88 PERMI (206)431-3670 I:I Approved per applicable codes. Corrections required prior to approval. COMMENTS: ( 7 7 - ' 11 -e/( Cvo /4/4( 19) r • -.:.-',.••• Date: 2,4?..oti , Ei $47.0 REINSPECTION FE5. REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: Prot: ` 1 '„Q /r . v l 1 Type of Inspe i • jf t� 1 V// d„..--) 39 Address. t. Date Called: t zioz � c� t , Special Instructions: ° I . aM(1 Date Wanted: ,rn slab �� Requester. Phone No: — 1 ?() -() VV i INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT N CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 pproved per applicable codes. COMMENTS: I Corrections required prior to approval. Inspecto Date: v S _041 $47.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Bvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: A MODULAR BLOCK WALL DESIGN INS SEATTLE DISTRICT OFFICE TUKWILA INTERNATIONAL BOULEVARD TUKWILA, WASHINGTON E- 2579 -44 February 26, 2003 PREPARED FOR SABEY CORPORATION '9\a K apt 092\ 0, �ha d ctc \.(. `� ur 1 �,rti �-'•iS 5 1.9' . c :A ° ,. Earth Consultants, Inc. 1805 - 136th Place Northeast, Suite 201 Bellevue, Washington 98005 (425) 643 -3780 Toll Free 1- 888 - 739 -6670 CITY �lU\ APPROVED DEC 3 p 1 0133 AS NO BU1!- RgcMIV NOV 1 0 1.003 PERMI (t,Lav I lk Earth Consultants, Inc. (;(•(,I(Y9111I('ill Iill);ill(t ts. Get)logitiis & Iifl \iru nlll( Mill ti( i(rnisiti ('nIstruti( Tesi » it, Kau ) : \\', \IU)hlsl xYli,nl:x•r\9l(:ti February 26, 2003 E- 2579 -44 Sabey Corporation 12201 Tukwila International Boulevard Fourth Floor Seattle, Washington 98168 -5121 Attention: Mr. Ralph Hagler Subject: Dear Mr. Hagler: Modular Block Wall Design INS Seattle District Office Tukwila International Boulevard Tukwila, Washington r-- Established 1975 In accordance with your request, Earth Consultants, Inc. (ECI) has prepared this modular block wall design for the proposed site development. We understand mechanically stabilized earth (MSE) fills and modular block wall construction is being considered throughout portions of the site. The modular block wall heights and MSE fills could be on the order of ten (10) to twenty -six (26) feet in some areas. Our scope of services included review of the grading plan prepared by David Evans and Associates, engineering analysis, and preparation of the attached drawing. This design includes the attached drawings with recommendations for construction of the MSE walls, as well as recommendations for seven and one half foot and ten foot high gravity walls. MSE and Modular Block Wall Design The design calculations for the MSE Wall and gravity modular block walls are included in Appendix A. The reinforcement schedule and recommendations for the wall construction are presented on the attached sheets SM1 and SM2. The soil parameters used in the design assume the reinforced fill soils will be compacted to the specified relative compaction of 90 percent of the maximum dry density as determined by the Modified Proctor Method (ASTM D- 1557 -91). The wall design assumes drainage is provided, and that hydrostatic pressures will not be allowed to mobilize. Additional drainage other than what is shown on the drawings may be necessary, depending on soil and groundwater conditions observed at the time of construction. The drainage shown on the drawings is a minimum requirement. The installation of sheet drain may be necessary along the contact between native cut and the reinforced fill zone, if groundwater seepage conditions are encountered. ECI should observe the MSE and modular block wall construction on a full -time basis. Supplement recommendations for drainage will be made by ECI, if necessary. 1805 136th Place N.E., Suite 201, Bellevue, WA 98005 Bellevue (425) 643-3780 FAX (425) 746 -0860 Toll Free (888) 739 -6670 Sabey Corporation February 26, 2003 For the MSE and modular block wall construction, a traffic surcharge of two hundred fifty (250) pounds per square foot (psf) was assumed. The design should be reevaluated by ECI for other surcharge loading conditions, where applicable. For the gravity walls, traffic surcharge loading was not included, assuming that the gravity walls will be constructed above the driveway areas or in the vicinity of the storm water detention pond. If the surcharge loading will apply to the gravity walls, ECI should reevaluate the design. Global stability of the proposed walls and fill areas was assessed in the geotechnical engineering study prepared by ECI (see Geotechnical Engineering Study E- 2579 -44, dated February 20, 2003). Global stability was assessed for both static and seismic loading. Adequate factors -of- safety were calculated for the static and seismic loading. We trust this design meets your current needs, and the submittal requirements. If you have any questions or need additional information, please contact us. Sincerely, EARTH CONSULTANTS, INC. IEXPli !ES 7_ / Z /Uo5 Raymond A. Coglas, P.E. Project Manager RAC /KRC /csm Attachments: Appendix A - Calculations Sheets SM1 and SM2 Earth Consultants, Inc. Kyle R. Campbell, P.E. Principal E- 2579 -44 Page 2 NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR - THAN THIS NOTICE IT'S DUE TO THE QUALITY OF THE DOCUMENT. 2 3 4 5 6 PROJECT Z�S 27,5' ' Y ez &. e ;( - Mss Earth Consultants Inc. (ki It t hnhml Engineers. Ckrdoµlses h IinvInn mint l Scientists COMPUTED BY DATED ' 12. .5 I CHECKED BY DATED PROJECT NO. 257c '1 ' 4 / 1 1 SHEET I OF 1 ■ SUBJECT P \ac(e. L 4• �t � =-�- Pk— �r - - ---c 'O ......_...._... • • . . rlc�t� 112)? ..: . .. t ; • 3;35 • ;;u ti81:. ��.,= it�`• ri�''. 1• �: eriw '.ti:t:;wt:iiif.�iriz�l''',�ul"' .°:fR:l(:i7i 44 45 COMPUTED BY DATED Earth Consultants Inc. CHECKED BY DATED PROJECT NO. . 5 . 7 - 1 - 179 SHEET _ OF I t SUBJECT <kYNrr hr grill Engineers. Geologists & ISm•Inmme7uul Sclrrilisis PROJECT z.s' 10► Z.5 r-t3 s,o 2.c-‘ 71 7.5 1 4o1 I 1 12.s (0Z6 ' s6.5"` I7,s . . 2 )2.5 z..z,s .. 1077- 1 r zs . 0 1 k <bli 2,q 6a 2S.p CIA, F-0.4.4ade,4 (_1"%e N °4 ") S (2s o Z, Z, 1 1�S 1 Z..0 .... .1.1.. __ 5- ....,......._ 3 S. I. 0', ; QQr 3� / .1 ,I�.V..'. �t•. .� lO y �.. . 25' • • 0. LW. •-.c . 0 -43 , GE-11 CA Fs • • • • 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 PROJECT 277.5 .1 11. Gtsseclallty I I9,ginrr•rs. (wn lugisls & L3tvin mnx• ScIrnUsls Earth Consultants Inc. < L/ k COMPUTED BY DATED CHECKED BY DATED PROJECT NO 2S -4 y SHEET . a OF SUBJECT i i � . ~i .� � / i may' I :• ~� CJ..�...t .._..__ i =+ .,•. � ........u.. � �„.ti1�!iie.ww:wv_R.w iaw.n�..o ro� �.n #��r.•r� ,� ro 1 ! 4, • 7.•rrrNN+ta '1 = 17 c‘ i ?S - e .16s. • 2 3 4 5 8 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 PROJECT • Earth Consultants Inc. (ieOletfin Ingtne•re. G•oklgis(s & linvlrul oriental Scientists (i..) • 02. ` . 6c)1 4 25` �-►�. • \L Pea tt\ COMPUTED BY DATED CHECKED BY DATED PROJECT NO 2 — J 4 SHEET 9- OF I I SUBJECT s j r ...: 1 I .,. .+f..... ...,.d.14. ' :•xvaw,ut.,, 1...4vns.%. ..1, var'- o ....��•v • rb . , : • •:. 1 ► 1 l E ! c � •• i L. ' � _.... . .....:_ {..._ • i I •i- I 1 • y I t v 1 i ......••>•.... �n.1,..— .,. / .n.,,,,' ' .... jrw.. t r.a'✓w 4v.•4 .. 0:r.�r.w.u t um+rt, ?:.r.. % t ? ... ...4. .........1... i_ .. _4, . f_.. i .., _ .t_ ff ' • ... 4 f • a 4 • Si i • A+J�'+K•r. u.\•'w,r.... ±niw t�.:w..rw.jr \fir p..,..rwr.:,�rv-. v.r.. • G . s.f:♦ 7 • 2 3 4 5 6 7 a 9 10 11 12 13 14 15 16 17 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 PROJECT 1 Earth Consultants Inc. (kr,urhnlcll Bngll1I tvs. Geologists & lin%InmureiI1I Sdc ,ULms • -c \ t _L3 I 1 S i 1 1 V 1 4 , i ... .I . N j I t f ` 1 r , ... y- .w. .. .un +. , a..N'I.... .., „,„ . ±• .: ..... r , r ' -jn. :. i:x. r e i 1 I i ! _ ... ... ...._ .. 1 . » ..,r �. „w......L .I f • t t • 1 .. Y, • .1 60, 7 ,200 24 300 Zd �ZS � 1 COMPUTED BY DATED CHECKED BY DATED PROJECT NO. l S:7 - yy SHEET - OF L SUBJECT VI ci9 I ci ) c9 0 30 I I , (n - 1.357 .167 7 :2, A • 1 ti ) i i f • { j •...,. a,n•uw, m .'rwroeulwr..:.�.;nrr u.. n:�v. ` ' ! ' .".,%/••••• . } I'.r�+ . l„ r6N. t• :L':::.w...Y'��eY:.YY:.r,ytN,'. �e:rv.n„.r.. ,33 1.67 l 9 8 7 .3 . 0 3.8 4 6 7 Z,. 2.- Z. z. 2- 0 z QQ z cG 2 00 w� N LL w Iw -- = Zo O • N O H i z w W. �Z 0�.. z I, 43 44 45 Earth Consultants Inc. Geiger r linlcal Engineers. Geologists & Ens Ir tunenml Scientists PROJECT • C.-1G, S1 Ame._y,`d .107 = 0. 0.67) Use_ I cc 'c,k 0 . Pt-F1 o ()M_ ( - 0.30 Q 0 - � - �CCe Cm e►sn1� c \Cwt r� = O ...SA-w► vv 0 ,5 o,30 \ 3s�c� P p,v , - O. 1-t Z - •30 , 135- X27 S a�- 6.; j x .. .;. X ;x; :. .... ..- v- .....! . _ .. . .... h ......: .....:.. ... a ...'— .. I i w • . r.N+{m .. ww,�y,...n ,.wwn ..1 . ..a..la -.� ... �. ,r, • -... •, r4 ■ • COMPUTED BY DATED CHECKED BY DATED PROJECT NO. 7e 1'4 1 { SHEET e OF I t , SUBJECT tS, -I 4 )/ WNW PROJECT ck. Stkc ( ,4c Cam` .� Scce. (F P + + IG,S4s+ Ig',3ly +- s.7743 co'ce._s.`s. C\ (Ft , e7 Cr, */ i CFocPA r i cam• Earth Consultants Inc. (k OII t hnlral IA:pinrrrs. Geologists & I;I W In) I11R•I11U1 Sc'II ,IILSI5 .S = Z7,S ' • 1- 12 ) 06e ! • • COMPUTED BY DATED CHECKED BY DATED PROJECT NO 2'579 -w 1 SHEET 7 OF SUBJECT 1 07 /-I iS 4. ._ . ...,..r ... �,.....n• • » i�. - ...• '.....ae.e ■ : ',..., ' •.13.0 .n.,.•.u..•.j,..•. . �w.�.. u t... n,z.�. ;;... , r ,:. v..=. . ... .' .. .,r !�. «. v.. • ... i a • w w . i . / . 3 • Earth Consultants Inc. Gvrlechnie.:J Engineers. cev Aogisls A 19wlnxmxvnnl Scicnlists PROJECT `.51e ETC' i c� L = 7-2-4 . = 27.5 2LS . 61 ((75 � Iz= 11 • • • Vfl = V ) 4"3 45 (cl•t + ■ ) 012.s. 1375 ,7 )6.S '1 eG, G2 \u -Sri cYNry 2)% 1 6 - zs 4 V/ - 1(U- es t1e&,bz) k_' • • A . ; .....�;.,.. . .,. s ;.w....b..,.0 . .�.»..e.:... . 1..,..,4....4..,.... .., e..�• 1 t '1' ■ COMPUTED BY DATED CHECKED BY DATED 11 � PROJECT NO -. 1- 5 )9 ' `{ SHEET \ OF SUBJECT 4- Pte• i „e MOM" • 5 1is 7.S 5 Earth Consultants Inc. Geol tihnh'tii lingirnrrs. Geologists /eFininntmentni Scientists 'ROJECT 231 (7.c1 er'37:3 oSo Liss a 1 "7 o 8 4376 3 l \ P. 0$-Net ( " F, C'1 3,512 1 .6.(, -r 3 3o7y 3,4 I 25:3 I-1:0G la de 337Z `.. ( L1 \ • 3 1 ; i . rt 7.1:305n Z 1 44z� I-1 17H I �Io \ ( \•t5) I co,573 3 Z 4c° 1 Z 162. 1 I e ci-t? 0 12. 1 326 11545c 2)2177 V`.3 21e ?? 7 -7.= • I (f f I` )v l z l szr) ' I -1 861 5 COMPUTED BY DATED CHECKED BY DATED PROJECT NO l' 19 SHEET q OF SUBJECT 7.s 11 z2-400 k Cs -aGyoi 43 l� l' '-1 �.S 6 II Z.Z. Za 10 2 3 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 PROJECT SUBJECT • Ck Q • Earth Consultants Inc. (;trtlttihnlrtl Engineers. Genlagiste t4 I fl 110nlnt•mal Scientists t,.S A U }}z 4 ‘ 0t.S'.-95/ ) (11 is-g 2 _01, c ..... vee. taxsx o .3c� L �.( .. O•,t, `el ( 9.;% 571 . l o . I I ( _ i • �..1 —i _ . s . i t \ . . 1 1 + 1 COMPUTED BY DATED CHECKED BY DATED PROJECT NO.2. 7 '1 1 SHEET t 0 OF 30 730 t 'Sc?� d t G � � 2- 2 3 4 5 8 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 Earth Consultants Inc. ((0t(c latintl Engineers. G e t & Environmental Sc)enllsts PROJECT • • ��� \G�Ic.�SiC?Cls `. .� . 2 - 3 ,712 p_4 Jr ' 2)eSE= 1-( 1 12 5 COMPUTED BY DATED CHECKED BY DATED PROJECT NO.2S 1 ^iy SHEET \ OF I t SUBJECT L I > L Ada - f Z ss - ( ! (ue,. ( ! ! I i 1 _......_ ..... ; _....t.. ...... .... . r•-•• a „„, „„ w,.. . - M• .r;.ww . .MU•�..0 ia+ w r. a� ', rv:xb. + » + ... :o� r r: , .:.r .. L:... v;.. u: r. r •rr.t...:.•..w «�•...r..- x n.:..- >.:.- ...,,.....,.,. v L w y y - _..._ .. � - .. ... (t)c‘<\1 • Gravity Wall Calculations 75 Fool Wall Project Description: INS Building ECI Job No. E- 2579 -44 February 2S, 2003 Wall height will be 7.5 feet maximum Grade above wall will level The blocks will consist of Lock - Blocks manufactured by "Ultra- block" which have typical dimensions of 2.5 feet high, 2.5 feet wide, and 5.0 feet long Soil Conditions: Wall backflll will consist of native and imported silly SAND with gravel So il in front of wall will be native soil The area below wall will be level Lock -Block Wall Dimensions Height of wall -- 7.5 feet (three blocks high) H w : =7.5 Wall batter measured from vertical -- wall vertical, no batter a : =0•deg Wall embedment H emb : =2 Exposed vertical wall height H := Hw•cos(a)— Hemb Bottom width of wall B =5 Design wall height H :=H H B b•sin(a) Top width of wall B t := 2.5 Inclination of ground slope behind wall measured from horizontal plane l := 0 •deg InclIna of back of wall measured clockwise from horizontal plane atan B b — B t - 18.43 *deg 0 := 90 + a — 18.43 H 0 = 71.57 H e = 5.5 H = 7.5 Determination of Earth Pressures and Surcharge Loading Backfill soil unit weight y : =135 Friction angle of retained soils 4) :=30.deg Inclination of back of wail measured from horizontal plane 0 :=71.57.deg Angle of Backflll to Wall Interface with Soil ly Wall batter measured from the vertical a : =0•deg Friction between concrete Lock -Block and soil 8 := 28•deg K : =.33 Resultant of active earth pressure K a •y•H a P :_ 2 Horizontal Component of P P H := P•cos(90 •deg — 0 + 8 ) Vertical Component of P P P•sin(90•deg— 0 +8) P = 1252.97 P H = 863.6 P v = 907.82 Mass Unit Area x'I y'I Weight Mass Moment x' Mass Moment y' Sq. ft ft ft k/ft k -ft/lin foot k -ft/lin foot Block 1 12.5 2.5 1.25 1.75 4.375 2.19 Block 2 6.25 1.25 3.75 1.75 4.375 6.56 Block 3 6.25 1.25 6.25 0.875 0.9375 5.47 Soil 1 12.5 3.75 5 1.5 5.6 7.5 Total 16.25 5.875 15.2875 21.72 x' 2.60 y' 3.70 Evaluation of External Stability Calculate Center of Gravity for Wall by taking moments of all resisting masses about the toe of the wall and then dividing sum of resisting moments by weight of wall in x'y' planes: Horizontal distance of "O" measured from toe in xy' coordinates x' : = 2.60 Vertical distance of "O" measured from toe in x'y' coordinates y' := 3.70 Weight of wall and soil resisting overturning W := 5875 Horizontal arm of W measured from toe in XY planes a := cos(a)•(x' +y'•tan(a)) a = 2.6 Vertical arm of PH measured from toe In XY planes b := H B b•sin(a) b = 2.25 3.34 Horizontal arm of Pv measured from toe in XY planes e : =B b•sin(90•deg- a) - tan(90•deg- A) 3.34 e = 4.25 fC,. .�..,.., 'itii:,',.r..4i:.+i%`.• =x.Jui Evaluation of Overturning Stability Resisting Moment M W•a1 -P �.e Driving Moment Md: =PH•b Factor of Safety against overturning Seismic MR FS :_ M Driving Moment M ds :_ (1 H •b) + 1139+ 427 Factor of Safety against overturning M FS os '_ Mds M R = 19134.78 Md= 1939.21 FS =9.87 M d = 3505.21 FS os = 5.46 Evaluation of Sliding Stability Coefficient of friction between wall and foundation soil F :=tan(8) Reaction at the base of wall N := W•cos(a) + P vcos(a) + P H•sin(a) K p := 350 Sum of forces providing resistance to sliding F r : =N•F+ W•sin(a)+ P v •sin(a) + K Sum of forces driving the wall in sliding F d : =P H•cos(a) Factor of Safety against sliding F FS s '_ Fd Seismic Sum of forces driving the wall in sliding F d := (P H •cos(a )) + 1139+ 427 Factor of Safety against sliding F FS ss F ds F = 0.53 F r = 4306.49 Fd =863.6 FS s = 4.99 F d = 2429.6 FS ss = 1.77 Evaluation of Bearing Capacity and Foundation Stability Width of wall footing B B -0.5 Soil unit weight for bearing soil y : =135 Friction angle of bearing soil :=34.deg Soil cohesion c : =0 Surcharge g := y'(Hemb + Bearing Capacity Factors from table 4.4.7.1A, AASHTO 19900 N c := 42.16 N q := 29.44 N y '=41.06 Ultimate Bearing Capacity gult c•Nc-t- 0.5•y•BfNy +q•Nq Allowable Bearing Capacity _ q ult g all - 3 q = 337.5 q ult = 25179.53 q all = 8393.18 ltricity and Bearing Pressures amming moments about the center of the footing base := W•cos(a)- F- P N = 6782.82 v :=N.cos(a) N v = 6782.82 H := N.sin(a) N H = 0 )rizontal distance of normal force from toe , W.a-P -PH.b N V I- N H •tan(a ) :centricity of the base reaction from the center of base of wall measured mg the plane parallel to the base of the wall f b — = 1.67 3 Bb X x • 2 cos(a) X X 2'B b -254 Bb- -246 -333 cos(a) 3 cos(a) B b X and B b- x �b 3 cos(a) cos(a) 3 1.67 <- -2.54 and 2.46 <- -3.33 aximum bearing pressure N 6 ' e x 9 max:=B b ' 1 + Bb nimum bearing pressure N 6.e x g min : = 1- Bb q max = 1299.32 g min = 1413.81 X = 2.54 ex = -0.04 Soil Conditions: Gravity Wall Calculations 10.0 Foot Wall Project Description: INS Building ECI Job No. E- 2579 -44 ' February 26, 2003 Wall height will be 10.0 feet maximum Grade above wall will be level The blocks will consist of Lock - Blocks manufactured by "Ultra- block" which have typical dimensions of 2.5 feet high, 2.5 feet wide, and 5.0 feet long Wall backflll will consist of native and Imported silty SAND with gravel Soil in front of wall will be native soil The area below wall will be level Lock -Block Wall Dimensions Height of wall - -10 feet (four blocks high) H =10.0 Wall batter measured from vertical -- wall vertical, no batter a : =0•deg Wall embedment Hemb := 1 . 5 Exposed vertical wall height H := H w •cos(a) - H Bottom width of wall B =S Design wall height H := H +H -I-B b•sin(a) Top width of wall B : =2.5 Inclination of ground slope behind wall measured from horizontal plane p : = 0•deg Inclination of back of wall measured clockwise from horizontal plane atan B b - B t - 14.04 °deg 0 :=90÷ a - 14.04 0 = 75.96 H H = 8.5 H= 10 Determination of Earth Pressures and Surcharge Loading Backfill soil unit weight y: =135 i Z re u 6 D JU. 0O . U.) (n O, W LL Q: a = W Z � I— O.. Z I- D: 0 ;O 0 I-- W I - U: L I O • Z. U N z Friction angle of retained soils :=30.deg Inclination of back of wall measured from horizontal plane 0 := 75.96•deg Angle of Backfill to Wall interface with Soil :=- 2.74•deg Wall batter measured from the vertical a : =0•deg Friction between concrete Lock -Block and soil Resultant of active earth pressure K a P Horizontal Component of P P P•cos(90•deg— 0 +S) S :=28.deg K := 0.33 2 Vertical Component of P P v := P•sin(90•deg— 0+8) P = 2227.5 P 1654.31 v = 1491.64 Mass Unit Area x'l y'I Weight Mass Moment x' Mass Moment y' Sq. ft ft ft k/ft k -ft/lin foot k- ft/lin foot Block 1 12.5 2.5 1.25 1.75 4.375 2.19 Block 2 12.5 2.5 3.75 1.75 4.375 6.56 Block 3 6.25 1.25 6.25 0.875 1.09 5.47 Block 4 6.25 1.25 8.75 0.875 1.09 7.66 Soil 1 12.5 3.75 7.5 1.562 5.8575 11.71 Total 27.5 6.75 16.7875 33.59 x' 2.49 y' 4.97 Evaluation of External Stability Calculate Center of Gravity for Wall by taking moments of all resisting masses about the toe of the wall and then dividing sum of resisting moments by weight of wall in x'y' planes: Horizontal distance of "O" measured from toe in x'y' coordinates x' : =2.49 Vertical distance of "O" measured from toe in x'y' coordinates y' : = 4.97 Weight of wall and soil resisting overturning W : =6750 Horizontal arm of W measured from toe in XY planes a:= cos(a)•(x'+y'•tan(a)) a = 2.49 Vertical arm of PH measured from toe in XY planes b := H B b•sin(a) b = 2.99 3.34 Horizontal arm of Pv measured from toe in XY planes e : =B b•sin(90•deg- a)- H .tan(90.deg- 0) 3.34 e = 4.25 M FS os = Evaluation of Overturning Stability Resisting Moment M R := W•a1 -P Driving Moment M d :=P1-1.13 Factor of Safety against overturning M FS 0 Md M ds Seismic Driving Moment M ds :_ (P H .b) - 2025} - 750 Factor of Safety against overturning M 23148.91 M d = 4953.04 FS =4.67 M d = 7728.04 FS os =3 Evaluation of Sliding Stability Coefficient of friction between wall and foundation soil F := tan(8) Reaction at the base of wall N := W•cos(a)• P I- PH•sin(a) K P := 350 Sum of forces providing resistance to sliding F r := N•F-}- W.sin(a) -f- P vsin(a) + K p•H emb Sum of forces driving the wall in sliding F d : =P H•cos(a) Factor of Safety against sliding F FS s := Fd Seismic Sum of forces driving the wall in sliding F ds :_ (P H•cos(a)) -t- 2025+ 750 Factor of Safety against sliding F r FS := F ds F = 0.53 F r = 4907.16 F d = 1654.31 FS s = 2.97 F d = 4429.31 FSss= 1.11 Evaluation of Bearing Capacity and Foundation Stability Width of wall footing z Bf := B +0.5 Q Soil unit weight for bearing soil y: =135 W J U: 00 (.0 Friction angle of bearing soil :=34.deg Soil cohesion c :=0 Surcharge q : = y' (H emb+ 0.5) q = 270 Bearing Capacity Factors from table 4.4.7.1A, AASHTO 1996 N : =42.16 N q : =29.44 N I : =41.06 Ultimate Bearing Capacity q u i t := c•Nc +0.5•y•B fNy +q•N Allowable Bearing Capacity q ult g all : = 3 q tilt = 23192.33 q a ll = 7730.78 W = J � Eccentricity and Bearing Pressures Summing moments about the center of the footing base N := W•cos(a) +Pvcos(a) +PH•sin(a) N = 8241.64 Nv := N•cos(a) N 8241.64 NH := N•sin(a) NH= 0 Horizontal distance of normal force from toe W +P PH•b X := N�+ NH-tan(a) Eccentricity of the base reaction from the center of base of wall measured along the plane parallel to the base of the wall Bb X e x' e 0.29 2 cos(a) B b= 1.67 X _ X 2 ' B b 3 -279 cos(a) 2.21 B b cos(a) 3 - 3 33 Bb S --X- and B X b 3 cos(a) cos(a) 3 1.6751.95 and 3.0553.33 Maximum bearing pressure N 6.e x g max ' = —• 1+ B b B b Minimum bearing pressure N 6 ' e x q min ' =— 1- Bb B q max = 2226.31 q mm = 1070.35 X = 2.21 June 17, 2004 Dear Permit Holder: Sincerely, Stefania Spencer Permit Technician Xc: Permit File No. D03 - 350 Bob Benedicto, Building Official City of Tukwila Department of Community Development Steve Lancaster, Director Ralph Hagler 12201 Tukwila International Boulevard Tukwila, WA 98168 RE: Permit Application No. D03 -350 12500 Tukwila International Boulevard In reviewing our current records the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the Uniform Building Code and /or Uniform Mechanical Code, every permit issued by the Building Official under the provisions of this code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days. Based on the above, you are hereby advised to: • Call the City Of Tukwila Permit Center at (206) 431 -3670 to arrange for the next or final inspection. This inspection is intended to determine if substantial work has been accomplished since issuance of the permit or last inspection; or if the project should be considered abandoned. If such determination is made, the Building Code does allow the Building Official to approve a one -time extension up to 180 days. Extension requests must be in writing and provide satisfactory reasons why circumstances beyond the applicants control have prevented action from being taken. In the event you do not call for the above inspection or request and receive an extension prior to July 13, 2004, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Steven M. Mullet, Mayor 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431.3665 December 1, 2003 Ralph Hagler 12201 Tukwila International Blvd Tukwila, WA 98168 -5121 Dear Ralph: Sincerely, Stefania Spencer Permit Technician encl xc: File No. D03 -345 File No. D03 -346 File No. D03 -347 File No. D03 -348 File No. D03 -349 File No. D03 -350 File No. D03 -351 City of Tuki,vila Steven M. Mullet, Mayor Department of Community Development Steve Lancaster, Director RE: CORRECTION LETTER #1 Development Permit Application Numbers D03 -345 - Wall L, D03 -346 — Wall M, D03 -347 - Wall Ml, D03 -348 — Wall M2, D03 -349 — Wall N, D03 -350 — Wall R and D03-351 — Wall P DHS Building —12500 Tukwila International Boulevard This letter is to inform you of corrections that must be addressed before your development permit(s) can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the Public Works Department. At this time the Fire, Planning and Building Departments have no comments. Please address the attached comments in an itemized format with applicable revised plans, specifications, and /or other documentation. The City requires that four (4) complete sets of revised plans, specifications and /or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a `revision sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections /revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, please contact me at (206) 433 - 7165. 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 -431 -3665 Documents /routing slip,doc 2-28-02 PERMIT COORD COPY PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: D03 -350 DATE: 12 -12 -03 PROJECT NAME: DHS BUILDING - WALL "R" SITE ADDRESS: 12500 TUKWILA INTERNATIONAL BLVD Original Plan Submittal Response to Incomplete Letter # X Response to Correction Letter # Revision # after /before permit is issued DEPARTMENTS: Building Division ❑ Fire Prevention ❑ Planning Division ❑ Public Works • G /2- Structural ❑ Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) DUE DATE: 12 -16 -03 Complete [11f Comments: Incomplete Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES /THURS ROUTING: Please Route If Structural Review Required ❑ No further Review Required ❑ REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 01 -13 -04 Approved ❑ Approved with Conditions Not Approved (attach comments) ❑ Notation: REVIEWER'S INITIALS: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: PERMIT COORD COPY Not Applicable ❑ DATE: . iiirdat4Syca4i .•'. -. ,Gr..:... -u..v .....:.w„ w..+wawuuw�wUa PERMIT COORD COPY PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: D03 -350 DATE: 11 -10 -03 PROJECT NAME: DHS BUILDING - WALL "R" SITE ADDRESS: 12500 TUKWILA INTERNATIONAL BL X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision #_after /before permit is issued DEPARTMENTS: II- I�a3 Mc/ hlg. li g -o• 1/ 7 -0 Bui Division • Fire Prevention • Plar ping Division LE Public W i'Ul, or, . l 6ii,lwr ' (Q � o , Structural ❑ Permit Coordinator Ar DETERMINATION OF COMPLETENESS: (Tues., Thurs.) DUE DATE: 11 -13 -03 Complete E l Incomplete ❑ Not Applicable ❑ Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES /THURS R�TING: Please Route Structural Review Required ❑ No further Review Required ❑ REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: REVIEWER'S INITIALS: Documents /routing slip.doc 2 -28.02 PERMIT COORD COPY DUE DATE: 12 -11 -03 Approved 0 Approved with Conditions ❑ Not App roved ( attach comments) Notation: DATE: Permit Center Use Only CORRECTION LETTER MAILED: /Wet 10 Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PWW Staff Initials: 11/40 /vo nru ii.uo ritA hUU cot UahU aauey t.urpOraL1UII 1908 City of Tukwila Department of Community Development - Permit Center 6300 Southcenter Blvd, Suite 100 Tukwila, WA 98188 (206)431 -3670 Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: / ? 0 3 Plan Check/Permit Number: 1)03 - 35 ❑ Response to Incomplete Letter # ❑ Response to Correction Letter # / ❑ Revision # after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner td A U." i" Project Name: Project Address: /2500 ?Wed/0 /4/T4<VA7&v .1511/1. 7 Witt ci2va-672/ Contact Person: j,4i -/ iJ,( Phone Number:.206 -- eZ / Mc) Summary of Revision: ,6E✓✓C04/)204 ADA& 70P GJA44-444-VA-77or•J5 44046$ ,e4 77i✓0' L4rr✓ ,5/2 /11/4/. kt &5 Sheet Number(s): "Cloud" or highlight all areas of revision including date of revision Received at the City of Tukwila Permit Center by: ,�l6 Z S Entered in Permits Plus on 12-72-63 08/06/03 IgJUUb • I SIM MINIM =I an • MINI En BIN OM 1•11 MI MEI 0 imt ow or no or am an Num or NE elk" 0 l0 •■• 0 0 00 0 0 0 A • , , • 0 ......... IIIM IMP Elli MN MI NM INN MI I= MI NM NM MMMMMMMMMM ME 111•1 II= IMI NM En MMMMM NM IM II= MI NM NM MI MI =I •I•1 MN IN OM 1•0 MI =1 MI MN 11= UM MIS IMIN MI MI MI an =MI NM NW Mil INN MI =II MIR NM ME NM UM • • • • ■ Mil ••• 110 lin MI MI Mil MI MS NM NM mei im NE we am miti NM MI MN ONO no me mu no um re MI NM 1•111 MIN MU am ir ow me me MI MIN OM IIMI ---- NM Nall M I -_. .–.."... . • .._ I I 0 0 0 0 0 11111, 0 0 0 411 ON las -- — am U ow; En sr no MM 0 0 1111111.0. I • 1111kIIINE 0 yA u, t Goi* toolefo 414,416 foopit WALL 1.4-2' WALL '14-i' WALL GRAVITY WALL WALL 'A' or • IN.203CLOCY L-27.2I' fri.752 • WALL •A UNDER SEPAVA TE PERMit A PORTION OF THE SE 1/4 OF THE SE 1/4, SECTION 9 AND A PORTION OF THE 8W 1/4 OF THE 8W 1/4, SECTION 10, ALL IN T. 23 N., R 4 E., W.M. R•20250' WALL 'A' GRANTY MALL +AI • WALL 'L' • • I= MI NINI 1•• II1= MEI MIN NMI MMMMM MI MD OM MIN MI =IP INN 11•• all NMI =II MN UM II= in all OM 1=1 MO — •I• 11•1 MI MO IM• •I• MMMMMMMM MIN MMMMMM 11= ime me mg MMMM ...... MINI NMI NM ME MIN MN 111= UM =I •111111 ..... INN OM • • ••■•■• ■••••• _ . — _ --‘*/ EAST ONE"QUARIER QUARTER SECTION t Wi.R4E• Sit TC. r vatliass CAP =NM rm. • jimailask .M1111. AMIN. ••• 1 PROJECT DATUIA•14.45 PINNIECT DATIAMIS NAto0 4. 0.3S FEET • .. _ _.......------- .... --------- - RIVE ...__ „..„.---- .... P\73 CGS ELL BE 611ACZ,',. TO •i_ Ti S7. 7TE OF WC7.1( WITHOUT 1 r - : - .7),r OF TUKWILA, etnew3 oivr - —.3 VAU F - - • " - .7 A !prof 04,104 r ' ' "titk 14 0 0 WALL V WALL ■•••■•■...■1•1111■•■••■■•■■•• ............. NMI ..... .110 ............ lin MI5 MIN NMI IM IMO MI MI NMI NM me or ••• NIB nil NU 11= • • 1.1 111. • 1111111111111111111.111111.61 II IIIIIIIIIIIIIIII111111111/11111 mu. anIMMIMM. •111111111..... 01.111 11 41111.■= - • - — _ — . ••■••••■.! F. .1■11111••• AgtenNa1200..... 1. CONSIRUCT1011 SPECIFICATIONS ARE PER THE "MODULAR BLOCK WALL user REPORT PREPARED BY EARTH CONSULTANTS, FOR THE OHS BUILDING, TUKVIILA, WA. DAM) FEB 26. 2003. SHEETS SIN AND SIA2 CONTAIN SPECIFICATIONS. SCHEDULES AND VARIOUS DETAILS. ow. A 0 MI ......... MIN ..... ENO MIN OM MN MI 1=1 MI MN • • U U • 1 .111111111111111111111111 7.,.1r1s • • wirib cirry.. ts and — respons 10-, ;he adc,;iia(y no, rt14*-thotally_with thc A,'..iiionc..',AHons or ro",sions to these voii ths :fcc.crince 7c:'iirc 1 -,••:' of rev :, drawings 1: 3_Lcnc,ir, i .01hieLt to F.71,1 inv, by ht_ inspec!or. 2)zic • that the an Check approvals are subject to . • a , issions and approval of plans does not et** :z , . ,, , . of any adopted code or ordi• ,- ace. Receo. —• . copy of approved plans NI CD IFI 0 15 30 so FILE COPY e • V DAVID !IVANS meo ASSOC I AT II 111 INC. 1620 W. Mann View Drive, Sues 200 Everett Washington e201 Phone: 425.250.4009 RCHITICTS • AlA 130 LAKESIDE • SEATTLE, WA 95122 • 206 325 2553 DEPARTMENT OF HOMELAND SECURITY SEATTLE DISTRICT OFFICE 12500 TUKWILA INTEFINA11ONAL BLVD. EATTLE, wAsiticiroN ar7=771177 vim .0. Ir 11•0■INLANK., 11/ AM/ 111111/1=1111 111 ':4 - :4 — :4& ■Noi I • • Mir CZIMIS EIMPAPIPPIPIMMIIIIMI11111111111 11111.111111111111111111111 1 111sil lw , Niihmeismia• itiZEI =I I ii 111111111111111 et • I ID $7.50' 12.50' 15.00' 307.50' ins 17.55 1 - - t • TOP AT 242.50' 25.31' IN202.50' dp7011 45.00' 22. 21' 17.21' 11301 • h4152'42" 2.93' C 2100' 500' "-- NONNI° 0 &so' MINIM 11110111111111111111NIMINESERVA2 • MON I iiiii11111111111111111,1111mmum hommulmollIIIIIMININ1111111111111M1 111111111111111111111111151111 I MN 1111111111111111111Rfil 119111111111.1•11 II 47.50' 0+00 0+50 - 80 60 WO:- 1 so WALL AREA ase SF 0+00 ELEW77.5 APPROX GRADE AT FACE a AU. W WALL H-1 -----, MN4 DEPTH OF WALL BELOW GRADE 61■141Z5 _j 0+00 1+00 0+50 83.96 _j J 0+50 • 1+50 mmunownewasniummmonwimmuminumom mlimmiampolimmummummumennummummimomi INNIMINIONNOMIIIIIIIIMINOIMINIIINIIIIIIIIIMNIIIIII IIMIONiiiimill MUL JO iiiiim. 11911141111111 1111 r • 1' 1+00 40.00 ELE*47.5 ELEV.45.0 0 3.96 4000 E 11111/1111111111 111111111111111FA 11111111111111111FA 111111111111111111111511 11111111111111Eill 11111111111111111110111 1111111111111111ms nimminnown momrson gam a WALL 'N' PROFILE SCALE:1' HORZ r-i0' %CRT APPROX GRADE AT FACE OF WALL = WIIII . J111 lifirri.TIJ . 1111111111 - 1111_ I musismoommiwommwommummieworillik, III 1111 I IV NIVIIIITRIIIIITIMILI E 3 2 I MP NMI I N I I I I I I NI I III I -i arlibra _WWII' I M11111111111111111111111111111111111111111111111111111111111IMEMIZEMMIIIIIMINIMININI I , ; I Nina" .11%1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111NIMIIIiiiiiiM=2:1:MMICEMAIIIII Millaiiiiiiiiiifisi• WAU. AREA is,406 'ffiimasemscISENNIIIIMIIIIMIIIIIIIIIIIIIMEIMINIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII111111111111111111111111NMIIIIINIIIIIIIIIIIIIIN GRADE Ai INIIIIIMMININSIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIMIEMIIMEMINIMI - - grO WALL INSINIMMINIIIIIIIIIIIIIIIINIMINIIMINIIIIIIIIIIIIIIIIIIIIIIIIIIIM1111111111111111111111111111111111111111111111111111111111 W0tv MADE -.7- MEINNI11111111111111111111111111111111MMIIIIIIIIIIIIIIIIIIIIIIIIIIIIINIIIIIIIIIIIIIIIIINIMirommenm loll DEPTH OF INA" ! ISHMIMINIIIMPIESFINNIIIIIMINIMIMMIIIMMIll 11111111111111111111 I IMMIErroglinIMUMI MIN oriiiimilliiiil INININIIIIIIIIIIIIIII1111111111111111111111111111Mii iiiiliffiLMIIII gm MENIIIIMMINIUMMI 1111111111111111111111111 WIN Mil 111111111011 111109M11111111111N111111111 MIN ill ill Sail lifell11111111111111Mil I EN 62311111111111170111 111111112151 NMI 285.00' MIEIMMUM = 11/1NOMMOMENEMNIII0 MM MM = MM sari DEPTH OF WALL, BELOW GRADE 2+00 1+50 WALL AREA 15178F STEPS TO UPPER SIDEWALK WORONT OF WALL 4 2+50 2+00 100 STEPS TO UPPER SIDEWALK ' • BEHIND WALL r FLOW SO I ; r - 3+00 GRADEAT -; OF WAII (10.47.5 , ! , f , i , - , WALL AREA 5825 SF WALL 'M' PROFI' LE I i , , 1 SCALE:1".30' HO „ RZ , 1 VERT I i I , . ! , 2+50 0+00 10.0' 3+50 3+00 MIEN 111111INCRUNIIMI 111111111111111N5CREINIMII mommir 111111111111111111110111111111MIERMIPM 111111111111111111111111111111MIMMOINI 11111111.1111111111111111111111111111MMOSHNOMI angrommenumummuummummummiimplamm ........mmummumommummusiscumum UMNOMMONIIMMOIMINiiiille AMMO IIIIIIRMA1111111111111111111MEMBSPOIM karatigNMENNIMilj AT %TM 0+50 670.00 4+00 3+50 • 277.50 4+50 4+00 5+00 375.00' Top ...., LGR:E AT w NEM.77.6' i APROX ; • . i CE OF FA 1 1 4+50 2+00 5+50 5+00 ___ OLE*47.5 , - , MOLL AA 5094 GRADE AT TOP-BACK 03F WALL ; FAO .1,1151111221:211.11 FAIIN1111111111111111111110111111111111111111111iiiiiiisai.S2119M111111111111111 2 . 101111111111111111111111111111111111111111111111111111MiC FAIIIIIIINIIII1111111111111111111111111•111111.11111111111111111111111111111111111111 1101111111111111111111101111111111111111111111111111111411111111111111 1/1111111111111.1119111111111111=111111111111111000.1111.9._ _ill 111,11111111ME 111.11,1,11,111111111111111EL...momigillalimis3 plarRIMOINN.m.olommenima m miii , *A. 'P MALE I I I SCALE: • a30' 14ORZ 1 I 1%40' J 1 VDU _J. , 1+00 1+50 APPROK AT MEM MIN DEPTH OF WALL BELOW GRADE • j100 so 1111104 W 6+00 MN OW TH OF WALL. 130.091 GRADE 5+50 8+50 viumxto 6+00 1 11LW17.6 7+00 6+50 AIM 7+50 80 . , 60 8+00 80 60 8+50 9+00 WALL, AREA 388 SF WALL 'M-1' PROFILE HORZ ratter VERT 1 _ _ Loopmc NORTH 9+50 , 13,0 04G Et 1Z 1".1 tovc. omso 10+50 11+ WAU,' AlEA 388 SF 11+50 60 WALL 'M-2' PROFILE . SCALE:1'040 HORZ , 1 rsur :VERT LOOKING SOUTH ! . ,........_ , • AREA 2496 SCALE:1" 1" 20 ao 60 27101911111 ilkiimisammu my ammo= mismoriremmuumw Whoommill Mil I TOP get 0 6+00 Emmies uIu - Ego marammusamommum immummarasommegaunsummo isiessmillAPROMOOlptemminim OVENNIDWZIAMMOMMERamp WALL AlEA 3344 SF mumnisir 375.00 , _. _. I sPilith ACE OF "( WALL AT i i t ; I i . MIN DIM OF WALL _ l aa __ VaCli I itif . AL. Lw __ a r 0+50 1+00 - 1+50 1 HORZ laRT GRADE BAOC OF 2+00 AT WAU. 1 -. 3+50 80 STEPS BEHIND . 100 60 111111 DAVID EVAN AND ASSOCIATES me. 1620 W. Marine View Drtve, Sues 200 Everett Washington 96201 Phone: 425.250.4099 A C PI I 1r I C TS • A 1 A 130 LAKESIDE • SEATTLE, WA 98122 • 200 325 2553 umr7,7r7mrommommoommxn. IIIMK7117777601111111111111EMME.1177479M ONO • Geogrid Layer Spacing (Ft.) (Measured From Bottom of Wall) C _ -. - ( "` r t. . _ i Lock-Block Wall Height (ft.) Geogrid Length (ft.) 1 - 2 3 4 5 6 r 7 8 _ 9 10 5.0 - 6.0 2.5 - - _ _ _ _ _ _ OP 7.5 8.0 2.5 5.0 T - - - - _ - ND - - 10.0 10.0 2.5 5.0 7.5 - - - - - - - 12.5 12.0 2.5 5.0 7.5 10.0 - - - - - - 15.0 14.0 2.5 5.0 7.5 10.0 12.5 - _ - - - 17.5 16.0 2.5 5.0 7.5 10.0 12.5 15.0 - - - - 20.0 18.0 2.5 5.0 7.5 10.0 12.5 15.0 17.5 - - - 22.5 20.0 2.5 5.0 7.5 10.0 12.5 15.0 17.5 20.0 - - 25.0 22.0 2.5 5.0 7.5 10.0 12.5 15.0 17.5 20.0 22.5 - 27.5 22.0 2.5 5.0 7.5 10.0 12.5 15.0 17.5 20.0 22.5 25.0 9 SPECIFICATIONS: MODULAR BLOCK AND MSE WALL CONSTRUCTION GENERAL. A. Work shall consist of furnishing and construction of a Modular Block and MSE Retaining Wall System in accordance with these specifications and in reasonably doss conformity with the lines, grades, and dimensions shown on the plans. B. Work includes preparing foundation soil, furnishing and installing leveling pads, drainage fill and backfill to the lines and grades shown on the construction drawings. C. Work Includes furnishing and installing geogrid soil reinforcement of the type, size, location, and lengths designated on the construction drawings and MSE Wall Schedule. SUBMITTALS A. Contractor shall submit a Manufacturer's certification, prior to start of work, that the retaining wall system components meet the requirements of this specification and the structure design. B. Contractor shall submit a test report documenting strength of specific modular concrete unit and geogrid reinforcement connection. The maximum design tensile load of the geogrid shall be equal to the laboratory tested ultimate strength of geogrid I facing unit connection at a maximum normal force limited by the "Hinge Height" of the structure divided by a safety factor of 1.5. QUAUTY ASSURANCE A. Contractor shall submit certification, prior to start of work, that the retaining wall system (modular concrete units and specific geogrid) has been successfully utlilized on similar projects, i.e., height, soil fill types, erection tolerances, etc. B. Contractor shall demonstrate prior experience on projects of similar size and magnitude where the specific retaining wall system has been constructed successfully. Contact names and telephone numbers shall be listed for each Proi - C. Owner shall provide soil testing and quality assurance inspection on a full -time basis during earthwork and wall construction operations. Owner's quality assurance program does not relieve the contractor of responsibility for wall performance. DELIVERY, STORAGE AND HANDLING A. Contractor shall check all materials upon delivery to assure that the proper type, grade, color, and certification has been received. B. Contractor shall protect all materials from damage due to jobsite conditions and in accordance with manufacturer's recommendations. Damaged materials shall not be incorporated into the work. PRODUCTS DEFINITIONS A. Modular Block a concrete retaining waH element machine made from portland cement, water, and aggregates. B. Structural Geogrid: a structural element formed by a regular network of integrally connected tensile elements with apertures of sufficient size to allow interlocking with surrounding soil, rock, or earth and function primarily as reinforcement. C. Unit Drainage File drainage aggregate which is placed immediately behind the modular concrete units. D. Reinforced Backfill: compacted soil which is placed within the reinforced soil volume as outlined on the plans. MODULAR RETAINING WALL UNITS A. Modular Block units shall conform to the following architectural requirements: face color: concrete gray - standard manufacturers color may be specified by the Owner. bond configuration: running with bonds nominally located at midpoint vertically adjacent units, in both straight and curved alignments. 8. Modular Block materials shall conform to the requirements of ASTM C1372- Standard Specifications for Segmental Retaining Wall Units. C. Modular Block units shall conform to the following structural and geometric requirements measured in accordance with appropriate references: compressive strength = 3000 psi minimum absorption = 8% maximum (6% in northern states) for standard weight aggregates unit size: 2.5' (H) x 5.0' (W) x 2.5' (D) minimum unit weight: 4,320 lbs. I unit BASE LEVEUNG PAD MATERIAL A. Material shall consist of Drainage Fill (1" Minus Crushed Rock) and placed as shown on the construction drawings. DRAINAGE FILL A. Unit drainage fill shall consist of clean 1" minus crushed rock meeting the following gradation tested in accordance with ASTM D -422: amain 1 inch 3/4 inch No. 4 No. 50 PinifiLP 100 75-100 0 -10 0 - I REINFORCED RACKFILL A. Reinforced baddill shall be free of debris and have a moisture content that is at or new the optimum level. B. The maximum aggregate size shall be limited to 1 1/2 inches unless field tests have been performed to evaluate potential strength reductions to the geogrid design due to damage during construction. C. Unsuitable soils for backfill (high plastic clays or organic soils) shall not be used in the backfill or in the reinforced soil mass. The fill material shall meet the following gradation: alava,,gii$ Peroont Paatipg 1 1/2 inch 100 - 75 3/4 inch 100 - 75 No. 40 0 - 60 No, 200 0 - 35 Fill that does not meet the above gradation must be approved by the geotechnical engineer. GEOGRID SOIL REINFORCEMENT A. Geosynthetic reinforcement shall consist of geogrids manufactured specifically for soil reinforcement applications and shall be manufactured from high tenacity polyester yam or high density polyethylene. Polyester geogrid shall be knitted from high tenacity polyester filament yam with a molecular weight exceeding 25,000 Meg/m and a carboxyl end group values less than 30. Polyester geogrid shall be coated with an impregnated PVC coating that resists peeling, cracking and stripping. B. Geogrid long term design strength shall be at least 4,700 lbs./ft for walls 15.0 feet or higher. For walls 12.5 feet or less, LiDS shall be at least 2,800 lbs./ft. The contractor shall provide manufacturers specifications to the geotechnical engineer for review and approval. C. Manufacturing Quality Control The geogrid manufacturer shall have a manufacturing quality control program that includes QC testing by an independent laboratory. The QC testing shall include: Tensile Strength Testing Melt Flow index (HDPE) Molecular Weight (Polyester) DRAINAGE PIPE A. The drainage pipe shall be rigid perforated PVC pipe manufactured in accordance with ASTM D-3034. EXECUTION EXCAVATION A. Contractor shall excavate to the lines and grades shown on the construction drawings. The geotechnical engineer shall observe the excavation and approve prior to placement of leveling material or fill soils. Proof roll foundation area as recommended by the geotechnical engineer to determine if remedial work is required. B. Over- excavation and replacement of unsuitable foundation soils and replacement with approved compacted fill will be compensated as agreed upon with the Owner. BASE LEVEUNG PAD A. Leveling pad material shall consist of Drainage Fill, and shall be placed as shown on the construction drawings, to a minimum thickness of 12 inches. B. Soil leveling pad materials shall be compacted to a minimum of 95% Modified Proctor density per ASTM D- 1557 -91. Leveling pad shall be prepared to insure full contact to the base surface of the concrete units. MODULAR -BLOCK UNIT INSTALLATION A. First course of Modular Blocks shall be placed on the leveling pad at the appropriate line and grade. Alignment and level shall be checked in all directions and insure that all units are in full contact with the base and properly seated. B. Place the front units side - by - side. Do not leave gaps between adjacent units. Layout of corners and curves shall be in accordance with manufacturer's recommendations. C. Place and compact drainage fill behind Modular Block wall units. Place and compact reinforced backfill soil behind drainage fill. Follow wall erection and drainage fill closely with structural backlit!. D. Maximum stacked vertical height of Modular Block wall units, prior to unit drainage fill and backfill placement and compaction, shall not exceed two courses (5 feet). STRUCTURAL GEOGRID INSTALLATION A. The geogrid strength, perpendicular to the wall alignment, shall meet the strength specifications. B. Geogrid reinforcement shall be placed at the strengths, lengths, and elevations shown on the construction design drawings or as directed by the Engineer. • C. The geogrid shall be laid horizontally on compacted backfill and attached to the Lodc -Block modular wall units. Place the next course of modular concrete units over the geogrid. The geogrid shall be pulled taut, and anchored prior to baddill placement on the geogrid. 0. Geogrid reinforcements shall be oontinous throughout their embedment lengths and placed side-by -side to provide 100% coverage at each level. Spliced connections between shorter pieces of geogrid or gaps between adjacent pieces of geogrid we not permitted. REINFORCED IACKFILL PLACEMENT A. Reinforced backfill shall be placed, spread, and compacted in such a manner that minimizes the development of slack in the wowed and installation damage. B. Reinforced baddill shall be placed and compacted in lifts not to exceed 6 inches where hand compaction is used, or 10 inches where heavy compaction equipment such as rollers is used. Lift thickness shall be decreased to achieve the required density as required. C. Reinforced backfill shall be compacted to 90% of the maximum density as determined by ASTM D- 1557 -91. The moisture content of the backfill material prior to and during compaction shaN be at or near the optimum moisture content. D. Only lightweight hand - operated equipment shall be allowed within 3 feet from the modular concrete unit. E. Tracked construction equipment shall not be operated directly upon the geogrid reinforcement. A minimum fill thickness of 6 inches is required prior to operation of tracked vehicles over the geogrid. Tracked vehicle turning should be kept to a minimum to prevent tracks from displacing the fill and damaging the geogrid. F. Rubber tired equipment may pass over geogrid reinforcement at slow speeds, less than 10 MPH. Sudden braking and sharp turning shall be avoided. G At the end of each day's operation, the Contractor shall slope the last lift of reinforced backfill away from the wall units to direct runoff away from wall face. The Contractor shall not allow surface runoff from adjacent areas to enter the wall construction site. AS -BUILT CONSTRUCiiON TOLERANCES A. Vertical alignment: +1.5" over any 10' distance B. Wall Batter. within 2 degrees of design batter C. Horizontal alignment: +1.5" over any 10' distance Comers, bends, curves +1 ft. to theoretical location D. Full contact between blocks shall be maintained. FIELD QUAUTY CONTROL A. The wall construction shall be observed by the geotechnical engineer on a full time basis. Testing of the compacted backfill shall be performed by the geotechnical engineer. B. As a minimum, quality assurance shall include foundation soil inspection, soil and backfill testing, verification of design parameters, and observation of construction for general compliance with design drawings and specifications. • NOTE: For tiered walls consider the overall effective height of the tiered wall system required geogrid length from the reinforcement schedule. • when arrrinirf� C L. MODULAR BLOCK - MSE WALL : REINFORCEMENT SCH LE 5 PI cy col P. 9.: ter! off' ►�+. a • b a v C r. r-� ►-. c r; { !3 0 (7 C. c. r v Q ri r. ' M 3• C- . r r C; r . 0 CD C • 0 tc) ciN ,.- • e S