Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit 6515 - NC Machinery - Reroof
K).C. IvAct.i(NEY BP#&5/5 .... . . •V N. C. Machinery .1.oi_ 251 -5800 kJ DRESS 17025 West Valley Highway, Tukwila, WA 98188 CONTRACTOR Emerald City Roofing, Inc. PHONE 365 -8616 ADDRESS 1206 North 185th, Seattle, WA 1 98133 WA. ST. CONTRACTOR'S LICENSE # EMERACR154D0 EXP DATE 9 - 27 - 91 ARCHITECT PHONE ADDRESS ZIP i gel .T yea " Reroof - �, 1988 SETBACKS: N- S - E- W- FIRE PROTECTION: O Sprinklers Detectors © N /A 0 UTIL PERMITS REQUIRED? DYes (through ®No Publlo Worksl ZONING: BAR/LAND USE CONDITIONS? O Yes al No :ONDI • NS ( other than those noted on or attached to permit/plans) SEE ATTACHED "REROOF CONDITIONS" . Minimum Class B roof required. P O `' BUILDING SSUANCE BY: / t i _ . -, .� r OFFICIAL DATE. C' _ - / I hereby certify that I have read and ex. fined this permit and know the same to be true and correct. All provisions of lay and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign for and obtain this building permit. SIGNATURE: ' L -- % i - /�f/�!! DATE: - G - 9 PRINT NAME: 4 %/e / /s /.., ,? COMPANY: 'ri,•,'✓/ Cr in,4,y bUILOUI PEKMIT (POST WITH INSPECTION CARD AND PLANS IN A CONSPICUOUS LOCATION) > AMOUNT: 285`. a aITY OF TUKWILA ?ept. of Community Development - Building Division 1300 Southcenter Boulevard, Tukwila WA 98188 206) 431 -3670 BUILDING PERMIT NO. C I DDR S` S I # VA • CO S R • N 17025 W Valley Hy 29 782.00 3ROJECTNAME/TENANT N. C. Machinery ASSESSOR ACCOUNT # 252304-9046-07 Ub TYPE OF U New Building LJ Addition LJ Tenant Improvement (commercial) U Demolition (building) U Grading/Fill WORK: 0 Rack Storage © Reroof 0 Remodel (residential) 0 Other DESCRIBE WORK TO BE DONE: Tear off existing roofing and install mopped base with Derbigum S.P. modified •roofing system - Owens Corning. SQUARE OCC. SQUARE OCC. TOTAL •:• 7 q •.' S. .� SQUARE FEET OCC. LOAD SQUARE OCC._ SQUARE OCC. ISE • WOw TOTAL This permit shall become; null an void if the work is :not commenced. within 180daySfroM the, of issuance, or if the work is suspended or abandoned for a. period of;180 days from the last DATE ISS D: CERTIFICATE a� OCCUPANCY NO. N �A DESCRIPTION':<i'.: BUILDING PERMIT FEE. PLAN CHECK FEE: BUILDING SURCHARGE SOT HER.;:; : >::: >;:< >::;::,.; TOTAL': -': PLAN CHECK NO.: 91 -125 wrco+w PERMIT NO. CONTACTED L e*-t ' p, 6-?..2 C DATE READY DATE NOTIFIED ( , , r l' BY: (snit.) PERMIT EXPIRES 2nd NOTIFICATION BY: (init.) BY: ilnit.) • OUNT OWING 3RD NOTIFICATION APPLICATION TRACKING BUILDINGrIERMIT PLAN CHECK NUMBER INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that any time the status of the project may be ascertained. • Plan corrections shall be completed and approved prior to sending on to the next department. • Any conditions or requirements for the permit shall be noted on the plans or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ". BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION (to be filled out by Plan Checker) SQUARE OCC. SQUARE FEET LOAD OCC. LO .D SQUARE OCC. FEET LOAD OCC. LOAD SQUARE OCC. TOTAL FEET LOAD ' SQUARE FEET TOTAL OCQ LOAD DEPARTMENTAL REVIEW "X" In box Indicates which departments need to review the project. ARTM I`d't" AT UILDING initial review O FIRE O PLANNING O PUBLIC WORKS O OTHER BUILDING - final review 11111111111111 S REVIEW COMPLETED PROJECT NAME SITE ADDRESS rim REQ UIREMENTS MME CONSULTANT: Date Sent - Date Approv FIRE PROTECTION: FIRE DEPT. LETTER DATED: ZONING: BAR/LAND USE CONDITIONS? Yes No REFERENCE FILE NOS.: MINIMUM SETBACKS: N- UTILITY PERMITS REQUIRED? PUBLIC WORKS LETTER DATED: TYPE OF CO "STRUCTION: Detectors INSPECTOR: N/A BC DIT 0 (year): w- SITE ADDRESS M /tJ( r '7 - 0,..) 'tee/ SUITE # /1O WE37' VAi-L- y Owl, 11;itil1'-# VALUE OF CONSTRUCTION - $ 2 77tz' -- PROJECT NAME/TENANT N. c:- • M4 elf(A /oily ASSESSOR ACCOUNT # ,RS: - 30'1 ?o y7- 46 s a.FO y fo l~07 TYPE OF U New Building U Addition Li Tenant Improvemen (commercial) U Demolition (building) WORK: 0 Rack Storage IKReroof 0 Remodel (residential) 0 Other: DESCRIBE WORK TO BE DONE: 4 Oi=l- ex /Sri dc / � o Ftk/c hey. i v 7 /ei c• r'1 /i✓faL4 - 770 14 - e.tf - 4 - : /0.2 tfc. 7 if e(- 04 C4 t eK r a �t/ ‘,../ . c o .2,t/ oe.. .-- mi 7-4,, L.t"D ,44 o, -2) ,i' If k. �,/ 0 ,c, ✓4 :r-r - Ooft ni/ 6,6h../L' 64 rd ':d %G uM 5.4 .0 ool • l=0 BUILDING USE (office, warehouse, etc.) 0 /rrr cArr (,4z' u(.J(f ?�4TJ r egdtL Ai M1J NATURE OF BUSINESS: c 6 -- v T S 7l'.7W( c.t WILL THERE BE A CHANGE IN USE? No Li Yes IF YES, EXPLAIN: SQUARE FOOTAGE - Building: /S I rto ± Tenant Space: Area of Construction: WILL THERE BE STORAGE OR USE FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING? 0 No 0 Yes IF YES, EXPLAIN: �a Cf 4 (,j or PROPERTY OWNER /4/7 aleVe PHONE Z 5 / — jg o 0 ADDRESS f 7 o ZS` ts7" C41- A.i y /14. -J �Kc.iIL./4 . L./A . ZIP CONTRACTOR LM / t ejT ,6u-91=,+..4 1 A e- PHONE Nb5 - 841 ADDRESS /7-6 /✓ 185 if Sc9, (,J4 9( 33 l ZIP WA. ST. CONTRACTOR'S LICENSE # L // <,,Q /�,/ 3',L j 0 EXP. DATE 9/2 7`f V I ARCHITECT AIM . __... - -- —1 PHONE ADDRESS .------- It ZIP E D.:THIS APCATION AI D :I NOW TH> SAME TO BE I HEREBY CERTIFY HER RBY CERTIFT THAT;;I AVE : +: AND P,XA IN PLI .:..::..TRUE:. AND .CQRFtECANC 1 :.i:.�1NI..�tU�'�,f T. APi?LY. .QR::THIS::PEfMt T . , ........ ...................... BUILDING OWNER OR AUTHOFtIZED`�7 AGENT_. — ' SIGNA URE ) , , _ c DATE 63 1 /f/ '',. PHONE �6S �4 r PRINT NAME ' i„,./.4_,._6( � -c.{ •� -� � h"�` ,. C. �-- ADDRESS t . L // i fS /,lA • / L✓4.. fl r3 3 CITY /ZIP - , CONTACT PERSON 4 -` _ dPNE i,' ..- r� / . CITY OF TUKW� - Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 APPLICATION MUST BE FILLED OUT COMPLETELY DATE APPLICATION ACCEPTED BUILDIF PERMIT APPLICATION DESCRIPT ON BUILDING: •PERMIT: FEE PLAN; :CHECK.FEE BUILDING. SURCHARGE ittRift DATA APPLICATION EXPIRES 11111 1111111' DIEM" DAT E 10 tuts mosemosommi roffirat APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts are available at the Building counter which provide more detailed information on application and plan submittal requirements. Application and plans must be complete in order to be accepted for plan review. VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of Community nevalnpmant prior to application submittal. Contact the Permit Coordinator at 431 -3670 prior to submitting application. In all cases, a valuation amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Building Division to comply with current fee schedules. BUILDING OWNER I AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall expire by limitations. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform Building Code (current edition). No application shall be extended more than once. If you have any questions about our process or plan submittal requirements, please contact the Department of Community Development Building Division at 431 -3670. COMMERCIAL ,.„ NEW COMMERCIAL Uil..01,40S/ADDrflON8 Ej Completed building permit application (one for each stei Ej Assessor Account Number Two sets (2) of the following . . . O •specifications .. Structural calculations stamped by a Washington Atter): �cen [s report stamped by a Washington State Iloonsed nllneer :Topographical l•survey, Ea:Energy calculations stamped by a lIcens • Legal deactiption WOdting'drawings, stamped by a Washington ptatn. tiCert . . . . . , Architectural *drawings Structural drawings Mechanical drawings Elevations '••• Completed utility permit applicadon (one for entire ... . NOTE Ses:Uri/ItY submittal. requirements. • RESIDENTIAL SLII3MITTAL CHECKLIST NEW SINGLE-FAMILY DIP/EI.L.IPIGS/ADDITIONS 0 Completed building permit application (one for each Structure) . . . : Legal description • ; . . ri Assessor Account Number • . Two sets (2) of working drawing% which include • . • • ' • • • • • • .• •• • • • , • .••.: , • ;'.••••:•:;.•••: • Sire plan t_nr; - • ':•! .Foundation plan • 'include access to bulking.' showing • • • Floor plan thufucssJ • • • ■ Roof plan i• • i:• . . • Building elevations (all views): •••••••••■• ■•••••••••■•• : : 1 Structural framing plans .............. . Washington State Energy Code data . • Completed utility permit application F 1 Six (6) sets of site plans showing utilities .: : • NOTE: Building site plan and utility site plan may be combined Sea.. utility permit application and checklist for specific submittal requirements. Additional topographical and soils information may be required if unique site conditions. COSAMBICIAL TENANT IMPROVEMENTS • " ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: :,Co application(one. for : • Assessor Account Number Two (2) sets of cofletwction an which include 94t0 plefl . Location of tenant T.* „ :,;.:11:.•11:!:'11. : : .• • • .• Use of adacent (common well) tenant ipemll .dlflWfl . ... SO.fOO r plan of proposed tenant space 9Yer1111. Exit tdt - ‘aee liicatio P i t 3i lst ; 1 q Tenant • NOW walls cots, egre wall, construction details NOTE If anyUtitIfj flv* Is ft be ne submit separate utwty permit * each structure or „...........:„...... ..„... :: ......,....:„ :: . : :. : ...... : ...... : : : . : . . ........................ ,:::,........,,:,,,, • :..,........,,,,:.:: .....; ...::.. 131i .5b.u (ttite) .::.Assett.set Account .tvom4er.::: *........g*::::::::::,..::: .:: .. :-..:::::::::::::,....-..,...:::::::::.:.•...:....;......, , . .,..........::,.......,...,.... . :...,::::,.......,:....,..,...•.....:.,....:•.::..,.....:,..-:.,..........: . : . - • .. - ........• .....: .. ...,.........: Narrative describing existing roof, material being remoVed,.and.::::::::::::: ......nieter.10;beiripiristellecki:i::::::::::'::::.::::ii:::: ..: -,......ii::.:": ..,....:::-:-...:-...::::-....::::::: :..:.::..„...., :..., NOTE ‘ 'A oertl.69fitisir to #nellrskeetion'and Si464:::::::: f)fl of the permit ''''''••••• . • •••••• 2-,, ::•':':•••• : ::: : ,': : :: .: : : ' • •••::'•'......• .':.••. •:•• : . ::.: . ::::::::::,.:::......:,,::,,:::-...,..,.... . •:•••• -•,,,,, •• •••:,•••••••••••••,,,,,,,,,-..,,, •••••• • :,-,,••••,,,,•-••••-••-•-•,—.., "•• - : • : . . RESIDENTIAL, REMODELS Completed buildng permit application (one for each structure) : : E • , . . Assessor Account Number Two (2) sets of working drawings, which include Sita) : • Foundation plan • Floor plan • 11Root plan: • :.::.:., Building elevations (all views) • Building • Structural framing plans NOTE; If any utility :work Is to be d(?170 provide utility permit and plans must be submitted. : • , • . • . • : . REROOFS E Completed building permit application (one for each structure) Assessor Account Number Narrative describing existhig roof, material being removed, and material being installed.: NOTE:A certification letter Is required prior to final inspection and sign- off of the permit PROJECT: /VC /VC 1r - 4 -) eA PERMIT NO. , SITE ADDRESS: /20 ' 2- S . !_/20 & , / ,,,� DATE CALLED: TYPE OF INSPECTION: ' Q., /— f q DATE WANTED: --9 p ' SPECIAL INSTRUCTIONS: REQUESTER: PHONE NO.: INSPECTION RESULTS /COMMENTS: Alt DATE: 7: �I INSPECTOR: /.v, I �,1 .) r), CITY OF TUKWILA Dept. of Community Development - Building Division Phone: (206) 431 -3670 INSPECTION RECORD 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 Enw aid City Roofing (Inc. 1206 N. 185th, Suite A • Seattle, Washington 98133 • (206) 54e-91t3— CITY OF TUKWILA ATTN: DAVE DEPT OF COMMUNITY DEVELOP-PERMIT CENTER 6300 Southcenter Bldvd Tukwila Wa 98188 Re: Permit No. 6515, N.C.Machinery Sir: I have installed a roof membrane assembly consistent with Owens/Corning Specification #2D2-NS, Data Sheet Enclosed, which meets or exceeds the requirements for a Class A Roof. This roof was installed at 17025 West Valley Highway, Tukwila Washington under City of Tukwila Building Permit No. 6515. Lnderely, igle 47 BOBBY B ANNIS President bba/bj encl April 26, 1991 @NOV aq t MAY 2 8 1991 crry of: 'rutte41LA PLANNING DEPT. OVYENSfCQRNIN6 •FIBERGLAS NAILABLE DECK 2' eidelep In Fasteners 18 o.c. PERMA PLY ^ . T �. 12" ■;, 4 • 2' sidelep 36" PERMA PLY 12" Dor 'GUM 2611-NS DERBIGUM HPS S■del.p nnlr '-` a PERMA PLY 39'4" DERBIGUM 39W' DERBIGUM f 3' side ep DERBIGUM ( 3' sidelap Uncoated or Coating Applications General For use over wood, plywood, gypsum, cementitious wood fiber and lightweight concrete decks. It is neces- sary that these decks can adequately retain the nails or fasteners recommended by the deck manufacturer. NOTE: All flammable materials must be thoroughly protected by a base ply or protective covering prior to torching of the DERBIGUM membrane. Materials Required Per 100 ft of Roof Surface Base Ply -1 ply 108 ft Mechanical Fasteners As Required DERBIGUM Membrane -1 ply Emulsion (as required) or Fibrated Aluminum (as required) or Acrylic (as required) 110 ft 2 gal 1.5 or 2.0 gal 1 gal Application Base Ply Apply base ply (PERMA PLY No. 28, PERMA PLY-IV, PERMA PLY-6 or PERMA PLY R may be used) with 2" (min. 1 ") side laps and end laps utilizing approved mechanical fasteners. To minimize buckles and wrinkles allow enough time for base ply to relax unrolled prior to attachment. 2D2 -INS DERBIGUM SP DERBIGUM Membrane Apply DERBIGUM by torch method with minimum 2 %" side laps and minimum 4" end laps. All laps shall be checked and sealed while the modified bitumen is still in a semi -fluid state from roll application. A minimum of flow of modified bitumen must extend beyond all edges. Surfacing (optional) See UL listing for minimum requirements. It is recommended to wait a minimum of 30 days after application of DERBIGUM before applying emulsions, or other smooth surfaced type coatings. Emulsion: Uniformly apply approved emulsion with soft fibered brush or spray method using a minimum ,..-,.... Fibrated Aluminum: Uniformly apply fibrate aluminum . W , coating by, brush, roller or spray using 1.5 to 2.0 gal/ Acrylic: nifFtfliy apply atsprOVed acrylic coating by three knot brush, roller or spray using 3 /4 -11/4 gal /i00 ft? Nailable /Smooth All Climatic Areas Torch -On Application Unsurfaced Due to the inorganic characteristics of the reinforce- ment materials and the weathering capabilities of the modified bitumen, surfacing is not required. Fleshings Refer to Flashing Details Section of the Owens- Corning DERBIGUM Modified Bitumen Products Reference and Application Guide Pub. No. 5- DR- 13119. Safety Refer to Basic Safety Measures in General Specifica- tion Recommendations Section of the Owens - Corning Fiberglas Modified Bitumen Products and Application Guide Pub. No. 5- DR- 13119. NOTE: All general recommendations in the General Specification Recommendations of the Owens - Corning DERBIGUM Modified Bitumen Products Reference and Application Guide Pub. No. 5 -DR -13119 shall be considered part of this specification. 53 UL Classification Index* Nailable — "N" Specification (Cont'd) NAILABLE,A.1000Vd) A ` Aluminum) 401•NS 402-NS ^ "" 301-NS 302-NS _3131-NS. ,...302,-Na... --A — ..- 2D1•NS . 202•NS ,,,, • _:._ 1 _ : 1 •,,. -NC Acrylic 401•NS 4D2•NS 3 1 2 NC 301•NS 302-NS 1 2 2 NC 301•NS 302-NS 2 1 2 NC 201-NS 202-NS 1 1 2 NC 3 1 1 1 NC 2 1 NC NAILABLE B 8 Mineral Cap 401•NC 4D2 -NC 3 1 31115-C, PL1 NC, C, PL 3D1-NC 3D2•NC 1 2 3 1115•C, PL) NC, C, PL 301•NC 3D2•NC 2 1 3111•C, PL) NC, C, PL 201-NC 202•NC 1 1 311 YI-C, PL) NC, C, PL NAILABLE C C Mineral Cap 401-NC 402-NC 3 1 Unlimited NC, C, PL 301-NC 302•NC 1 2 Unlimited NC, C, Pt. 301-NC 3D2•NC 2 1 Unlimited NC, C. PL 201 -NC 202 -NC 1 1 Unlimited NC, C. PL C Unsurfaced 401•NS 402-NS 3 1 21Y. -C, PL) NC, C, PL 301•NS 302-NS 1 2 2 (Y. -C, PLI NC, C, PL 301-NS 302•NS 2 1 2 I15•C, PL) NC, C, PL 2131-NS 2132-NS 1 1 2 IY. -C, PL) NC, C, PL Non - Nailable — "X" Specification NON- NAILABLE A A Gravel 401•XG 4D2•XG 3 1 3 NC 3D1•XG 302•XG 1 2 3 NC 301•XO 302•XG 2 1 3 NC 2D1•XG 2D2•XG 1 1 3 NC NON•NAILABLE B 8 Mineral Cap 4D1•XC 402•XC 3 1 3 NC 301 -XC 302•XC 1 2 3 NC 3D1•XC 3D2•XC 2 1 3 NC 2D1•XC 202•XC 1 1 3 NC B Emulsion 4D1•XS 402-XS 3 1 2 NC 301-XS 302•XS 1 2 2 NC 301•XS 302 -XS 2 1 2 NC 201-XS 202•XS 1 1 2 NC 8 Aluminum 401-XS 402•XS 3 1 Y. NC 301-XS 302 -XS 1 2 Y. NC 301•XS 302-XS 2 1 14 NC 2D1•XS 202•XS 1 1 Y. NC NON•NAILABLE C C Mineral Cap 4D1 -XC 4D2•XC 3 1 Unlimited NC 301•XC 3D2•XC 1 2 Unlimited NC 3D1•XC 302•XC 2 1 Unlimited NC 201•XC 2D2 -XC 1 1 Unlimited NC C Unsurfaced 401-XS 402-XS 3 1 2 NC 301•XS 302•XS 1 2 2 NC 301•XS 3D2 -XS 2 1 2 NC 201•XS 202-XS 1 1 2 NC 'Refer to UL Building Materials Directory for requirements. 26 For DERBIGUM HPS or DERBIGUM SP Membrane Roof Insulation Options DERBIGUM Max. UL Specification Roof Base DERBIGUM Max. A' Partite 1" Thick Special Class Surface HPS 8P Tape Plies Plies Slope Deck MI 15' Wood Fiber Partite Inches Requirements 30.60 days weathering required before applying aluminum 30.60 days weathering required before applying acrylic Mineral surfaced sheet applied in hot asphalt Emulsion 401•NS 402 -NS 3 1 2 NC 30.80 days weathering 301-NS 302 -NS 1 2 2 NC required before applying 3D1 -NS 302-NS 2 1 2 NC emulsion 201-NS 202 -NS 1 1 2 NC B Aluminum 401•NS 402•NS 3 1 Y. NC 30.60 days weathering 301-NS 302-NS 1 2 Y. NC required before applying 301-NS 302-NS 2 1 V.. NC aluminum 201-NS 202-NS 1 1 15 NC Mineral surfaced sheet applied in hot asphalt 400 lb gravel or 300 lb slag /100 ft' in hot asphalt. Whon gravel or slag not applied in hot asphalt max. slope -2' A Mineral Cap 4D1•XC 402•XC 3 1 2 NC Mineral surfaced sheet 301•XC 3D2•XC 1 2 2 NC applied in hot asphalt 301•XC 3D2•XC 2 1 2 NC 2D1•XC 202•XC 1 1 2 NC A Emulsion 4D1•XC 4D2•XC 3 1 3 NC 30.60 days weathering & Granules 301•XC 3D2•XC 1 2 3 NC required before applying 3D1•XC 302•XC 2 1 3 NC emulsion and granules 2D1•XC 2D2•XC 1 1 3 NC A Emulsion 4131-XS 402•XS 3 1 Y. NC 30.60 days weathering 301•XS 3132-XS 1 2 Y. NC required before applying 301•XS 302•XS 2 1 Y. NC emulsion 2131-XS 202 -XS 1 1 Y. NC A Aluminum 4131-XS 4D2•XS 3 1 1 NC 30.60 days weathering 301-XS 302 -XS 1 2 1 NC required before applying 301 -XS 302•XS 2 1 1 NC aluminum 201 -XS 202 -XS 1 1 1 NC Acrylic 401 -XS 402 -XS 3 1 2 NC 30.60 days weathering 301 -XS 3D2 -XS 1 2 2 NC required before applying 301•XS 302 -XS 2 1 2 NC acrylic 2D1 -XS 202 -XS 1 1 2 NC Mineral surfaced sheet applied in hot asphalt 30.60 days weathering required before applying emulsion 30.80 days weather- ing required before applying, aluminum Mineral surfaced sheet applied in hot asphalt "X" REQUIRED INSPECTIONS PHONE AP DATE APPROVED INSPECT. INITIALS DATE(S) CORRECTION NOTICE ISSUED 1 Footings 431 -3670 2 Foundation 431 -3670 3 Slab and/or Slab Insulation 431 -3670 4 Shear Wall Nailing 431 -3670 5 Root Sheathing Nailing 431 -3670 6 Masonry Chimney 431 -3670 7 Framing 431 -3670 8 Insulation 431 -3670 9 Suspended Ceiling 431 -3670 10 Wall Board Fastening 431 -3670 X 11 Pre reroof 431 - 3670 12 13 . 14 FIRE FINAL Insp: 575 -4407 15 PLANNING FINAL 431 -3670 16 PUBLIC WORKS FINAL 431 -3670 X 17 BUILDING FINAL 431 -3670 (INSPECTOR COMMENT SECTION ON REVERSE) CITY OF TUKWILA Department of Community Development - Permit Center 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 SITE ADDRESS: 17025 W Valley Hy V11Le1tav4,311 r"G RIYaEl B INSPECTON RECIRD (Post with Building Permit In conspicuous place) SUITE NO.: BUILDING PERMIT NO. DATE ISSUED: PROJECT: N. C. Machinery CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE INSPECTION PROCEDURES AND REQUIREMENTS All approved plans and permits shall be maintained available on the site in the same location. 1. FOOTING - When survey stakes and forms are set and rebar is tied in place. 2. FOUNDATION - When forms and rebar are in place. 3. SLAB - If structural slab or if underslab insulation is required. 4. SHEARWALL NAILING - Prior to cover. 5. ROOF SHEATHING NAILING - Prior to cover. 6. MASONRY CHIMNEY - Approximately midpoint. 7. FRAMING - After rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place. S. INSULATION - After framing approval, but before Installation of wallboard. Baffles must be installed to keep attic ventilation points clear. 9. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing. 10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G). 11. 12. 13. 14. FINAL FIRE INSPECTION - Contact Fire Department for their requirements. 15. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements. 16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements. 17. FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete. OTHER AGENCIES: Plumbing (including gas piping) — King County Health Department — 296 -4732 Electrical — Washington. State Department of Labor and Industries — 277 -7272 A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by contacting the Department of Community Development, Building Division at 431 -3670. Although rrot required, a meeting of this type can often eliminate problems, delays and misunderstandings as the project progresses. 0W14 :4 \11) .... pro 771 7 .`