HomeMy WebLinkAboutPermit 6730 - Reid Residence - DeckPermit 6730 - Reid Deck
91-320 reid barry and reid becky
5103 south 164th street
deck
.
Pb •F •N .. V -N UB D `i• (year) 1988
SETBACKS: N- S- E-
W-
FIRE PROTECTION: QSprinklers Q Detectors xQ N/A
UTILITY PERMITS REQUIRED? 0 Yes 0) No
(throu
Pub4o gh Works)
ZONING:
BAR /LAND USE CONDITIONS?
Q Yes
CZ No
CONDITIONS (other than those noted on or attached to permit/plans)
ZIP
WA. ST. CONTRACTOR'S LICENSE #
1
EXP. DATE
ARCHITECT
•R•' ` ' •W ER Barry J. & Beck Reid
PH NE 244 -329
ADDRESS 5103 South 164th Street,
Tukwila, WA
ZIP 98188
CONTRACTOR Owner
PHONE
ADDRESS
ZIP
WA. ST. CONTRACTOR'S LICENSE #
EXP. DATE
ARCHITECT
PHONE
ADDRESS
ZIP
APPROVED FOR
ISSUANCE BY:
SIGNATU
CERTIFICATE OF
OCCUPANCY NO.
BUILDINJ PERMIT
(POST WITH INSPECTION CARD AND PLANS
IN A CONSPICUOUS LOCATION)
CITY OF TUKWILA
Dept. of Community Development- Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
DATE ISSUED: 15-c
Replace and improve exterior deck.
- r 'At •d ffl..01 47", v
PRINT NAME: ; . / a -
Th permit shall'• ecome null and void rf.
issuance, or if the work is suspended or a
:AMOUNT RCPT: #:
B.UILDINGPERMIT:
PLAN;:CHECK FEE:;.
BUILDING URCHARGE : : ::
OTHER:.
TOTAL :.
34:.00
0867: .
PLAN CHECK NO.:
PROJECT . INFO
SUITE #
SITE ADDRESS 5103 S 164 St
PROJECT NAME/TENANT Reid, Barry & Becky
TYPE OF U New Building U Addition U Tenant Improvement (commercial) U Demolition (building) U Grading/Fill
WORK: Q Rack Storage Q Reroof Q Remodel (residential) M Other: Deck
DESCRIBE WORK TO BE DONE:
. CODE' .COMPLIANCE.
USE
FLOOR
SQUARE
FEET
OCC,
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE OCC.
FEET LOAD
TOTAL
SQUARE FEET
TOTAL
OCC, LOAD
BUILDING
OFFICIAL
I hereby certify that I have read and ex mined this permit and know the same to be true and correct. All provisions of lav
and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit
does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating
construction-sr t e performance of work. I am authorized to sign for and obtain this building permit.
DATE:
COMPANY:
r commenced wrthin 180 days from the: date;i
oned :for a penod;of 180 days from the last inspection
DATE ISSUED:
91 -320
VALUE OF CONSTRUCTION - $ 2,560.00
ASSESSOR ACCOUNT# 681840 - 0160 -07
twanw
PERMIT NO.
CONTACTED
T)2C-X9
DATE READY
DATE NOTIFIED
f
10-'' Ti
BY:
Bonit.)
f5
PERMIT EXPIRES
2nd NOTIFICATION
BY:
(init.)
B
AMOUNT OWING
5%
6 -0
3RD NOTIFICATION
c' BUILDING C'ERMlT
APPLICATION TRACKING
PLAN CHECK
NUMBER
PARTMEE
l BUILDING -
initial review
O FIRE
PLANNING
O PUBLIC
WORKS
O OTHER
($( BUILDING -
final review
PROJECT NAME
SITE ADDRESS
jg)
/✓/4
REVIEW COMPLETED
QA
APP
8-7-?(
ROUTED
INIT:
INI
INIT:
INIT:
tk.QA,d) bcurr
d(i) 3 6.
INSTRUCTIONS TO STAFF
• Contacts with applicants or requests for information should be summarized in writing by staff so that
any time the status of the project may be ascertained.
• Plan corrections shall be completed and approved prior to sending on to the next department.
• Any conditions or requirements for the permit shall be noted on the plans or summarized concisely
in the form of a formal letter or memo, which will be attached to the permit.
• Please fill out your section of the tracking chart completely. Where information requested is not
applicable, so note by using "N /A ".
BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION
(to be filled out by Plan Checker)
.............. .
TOTAL
SQUARE
FEET
OCC. .
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
TOTAL
SQUARE FEET
DEPARTMENTAL REVIEW
"X" in box indicates which departments need to review the project.
CONSULTANT: Date Sent -
FIRE PROTECTION: Sprinklers
FIRE DEPT. LETTER DATED:
ZONING:
REFERENCE FILE NOS..
' MINIMUM SETBACKS: N-
C� U1REME 1!
UTILITY PERMITS REQUIRED?
PUBLIC WORKS LETTER DATED:
TYPE OF CONSTRUCTION:
-�� •
INIT: `vim_ ^ ' -
S-
Yes
SUITE NO.
:OM
Date Approved -
Detectors
INSPECTOR:
‘4) ev8acS
N/A
TOTAL
OCC. LOAD
UBC EDITION (year):
SITE ADDRESS SUITE #
/03 - s - , / 6 4 f s - 7 - . 21K.. cvi i_._ /9
VALUE • F CONS - UCTION - $ .i ' .
)1 : ! A# i '; - • 67,0
ASSESSOR ACCOUN
6 '/ Fr/, - o/6o --o7
(commercial) U Demolition (building)
' Other 17 c.-.C.,
PROJECT NAME/TENANT
0 -c:/(/&5 I /o r - rite o./" ...c: -e(:.
TYPE OF Li New Building U Addition Li Tenant Improvement
WORK: 0 Rack Storage O Reroof 0 Remodel (residential)
DESCRIBE WORK TO BE DONE:
- C� ' L / ce. • J2 !J i° /_/C-.. (7�G rE. //l re._ .22 c-
BUILDING USE (office, warehouse, etc.)
NATURE OF BUSINESS:
WILL THERE BE A CHANGE IN USE? ® No O Yes If Yes, new building requirements may need to be met. Please explain:
SQUARE FOOTAGE - Building: Tenant Space: Area of Construction: 37 0 5,, F7
WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING?
ti4 No O Yes IF YES, EXPLAIN:
PROPERTY OWNER
� :T /2c -: //, ct 0 ez i v
PHONE...,
L. -•9
PHONE
- 3 '�
ZIP ey 8
ADDRESS 5 /d.,3 S. / ‘ y S 7 -7-" K. iv / 4..4
CONTRACTOR t.V 1Z. G.- 6 . 400/4,,e_ O 6UN WO1Y L.
ADDRESS
ZIP
WA. ST. CONTRACTOR'S LICENSE #
EXP. DATE
ARCHITECT
PHONE
ADDRESS
ZIP
CITY OF TUKWiLA
Department of Community Development - Building
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
PLAN CHECK /�
NUMBER "1
I:HEREBY::CERTIFYTHAT. f HAVE:READ AND :EXAMINED; THIS; APPLICATION :
BE TRUE :AND :CORRECT AND :1 AM : :AUTHORIZED...TO'APPLY;'FOR THIS P:ERMI
PRINT NA
ADDRESS 5 S . / c'
BUILDING OWNER �T� E
OR
AUTHORIZED
AGENT
CONTACT PERSON PHONE 0 3 a ' S7 ij✓3
APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill out the
application completely and follow the plan submittal checklist on the reverse side of this form. Handouts are available at
the Building counter which provide more detailed information on application and plan submittal requirements.
Application and plans must be complete in order to be accepted for plan review.
VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of
Community Development prior to application submittal. Contact the Permit Coordinator at 431 -3670 prior to submitting
application. In all cases, a valuation amount should be entered by the applicant. This figure will be reviewed and is
subject to possible revision by the Building Division to comply with current fee schedules.
BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or contractor
licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this
permit application and obtain the permit will be required as part of this submittal.
EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall
expire by limitations. The building official may extend the time for action by the applicant for a period not exceeding 180
days upon written request by the applicant as defined in Section 304(d) of the Uniform Building Code (current edition).
No application shall be extended more than once.
If you have any questions about our process or plan submittal requirements, please
contact the Department of Community Development Building Division at 431 -3670.
DATE APPLICATION ACCEPT
- 9(
BUILDIN' PERMIT
APPLICATION
Division
DESCRIPTION
BUILDING PERMIT FEE
PLAN CHECK FEE
BUILDING . SURCHARGE'
OTHER:
_1- a
TOTAL -
AMOUNT
DATE
DATE APPLICATION EXPIRES
RCPT #
: :DATE
PHONE . a z
CIT Y2IR7 le.U' /Z4 9 vs-
03/ i6,
COMMERCIAL
NEW COMMERCIAL BUILDINGS/ADDITIONS ,: •
leted building Permit application (One for each structure
r:1 Assessor Account Number • .
TWO sots (2) of the foliowing : : . •
I I SpecifiOatiunS
Structural calculatiOriS Stamped by a Washington State hconsed
11
Soils report stamped by a V,. ashindton arigtnoer
ri EnergycalCulations . a.WashingtonStataficens . . • •
• des cnption . . . .. , .
. Working .draWings, stamped by 'a WashtnglonStata
architect; which include: . „.......
• ""."-
•••., Site pian • • • •,.. :
Architecturai drawings
• Sitiiatuftif.iiraWings
Elevations
Clvii drawings
•
..........
Landscape plan . . .
Completed utliity permit appiication (one for entire project)
Six (6) sets of chill drawings
NdiE":arie lett,* pei :0;4190f/on and otteelckst kit seem tt
RACK ..STORAG
...„.„:„. Co mpleted buiidin permlt app ii c ation
• :.•::.:.... • .. • :.•-• •
SAMITTAL CHECKLIST
: -::*:•• ,
NEW SINGLE FAMILY DWELLINGSIADDITIONS
. . .
Exit cloors
•
£ntlro space whero racks wifl be located
. . .
: • , • ..
Dimensions of all'
................................................................
• • • t
• •
:. • ' .. '" • . . .i." . . . : • :,..:, .:: of NOTE :Include.diinensions or tacks (haight,. width and
exit ways on plan
: .-, .:,: ' ,,.:. ..: ...: ......,:::,:, ::: .•
and
Structural calculations :stamped by a Washington State:license .....„ . .
ongine�r(radstorage 8' over)......1: . .''...!' .. .':::: ::::.'-::::::::••••;,.... - .:...'':',..:,..::::
...:
RESIDENTIAL —
. . .
COMMERCIAL TENANT. IMPROVEMENTS 1
• COrnPlee0 buildng ParrnIt'aPpitc4Ori
• : •-• • • • •••
. . . . ............ .......
„ . .... . . .
AsseasOi.. Accotiiit •
• : Two (2) sets of construction plans, Which
. .51te Plan
.;.:..Locaonot tenant space •••
• . .
Exisng anci proposed parking
• 4 '...Landscape
•
Use of adjaCent(Coininon tenant::::::;::::;;:b:':.::::?....:,:...
Overall dimonsions of building•be square footage
Floor plan of proposed tonant space
Tenant space pian with usa of each room labeiled
• Exit doors ogress patterns
New . • ..
wallS',":existinti wait, and walis to be demolished
Construction detalis
Cross sections showing
an _ • •:
- Structural caicuIaons stamped by a Washington State licensod
NOTE 1! any utility work Is to bo done subrnit Geparato utlhtypermit
application and plans .„ .' •
.:-ANTENNNSATE
MAO
soA�ount
Two(2) sel •••
Detalis antenna/satollito dish and me
ginoery be
:REROOF
[1 Assessor Account
.•:.caniPleted : f" ... t... ! OaOtt i a s tnictur.e
•-•
• . .
, ..f■lart - atIVe"deaCribintieliettngjoef;tnaterial t.r.i916gpmoye0;on
....iiiaterial:beinP installed
. ;:.NOTE:..Acerlifidatlorilettelqs..:00dired anOi.t final inaPeCtiCa: and sig
off
• .
. . . . . . .
.. . . . ..
•
: pomple . ted
• t e nn ailsa t 0, I I itedia
01 attachment
••
...
•• •
• •. •• • •••, . . .
IDENflA
• .•
. . ...
•:." .
Comploted buliding permit appllcauon (one for each structure)
. "i• . . .
Two (2) sets af working drawlngs which inclucie
Site plan
Foundation plan
Fioor plan
Roof pian
• Building elevations (all views)
Buliding cross section
Siructural NOTE 1! any utllstj/ work Is to be done provido utillty • fram plans
fi iapplIcatfo
CITY OF T UKWILA
6200 SOUTHCENTER BOULEVARD, TUKWILA, WASHINGTON 98188
TO:
FROM:
DATE:
SUBJECT:
Q
Az t e
gaTzr r-e-es
>1 of xamulavy - - - uc e ( (
t�1 Q . PPry ,Yung. ( cfifri-x
MEMORANDUM
( a ,
PHONE # (206) 433.1800
9/ -30,o
3 24 dt) Pice4A to A)
Gary L. VonDusen, Mayor
PROJECT: M .._.,,,.� /Wriall
PERMIT NO. , / 0
SITE ADDRESS: 5 1 A , ,
DATE CALLED: /0 " "" 0
TYPE OF INSPECTIO : ° , hi G
DATE WANTED: /40- --- / ° ' m '
REQUESTER: Ag""I ""
SPECIAL INSTRUCTIONS:
a 43.-j,.. “.....r-
PHONE NO.: 2 Ve I 3, .()
INSPECTION RESULTS /COMMENTS:, " "" ' _
r
INSPECTOR: 71 - DATE: 10- 2 9. 1
CITY OF TUKWILA
Dept. of Community Development - Building Division
Phone: (206) 431 -3670
INSPECTION RECORD
6300 Southcenter Boulevard — #100
Tukwila Washington 98188
PROJECT: 14EI•
7)7 1 '2) )e- a --/-..-
PERMIT NO. 4 30
DATE CALLED: 1 ..2-6,
SITE ADDRESS: .5?0 ,alp . /6 !
.. ...
8,m.
TYPE OF INSPECTION: / ' -
DATE WANTED: 6 j._
._
SPECIAL INSTRUCTIONS: 1
REQUESTER: '
PHONE NO.: 93S 7J3 i
INSPECTION RESULTS /COMMENTS:
4/ 4 -:3o2o..Z.. X.o p„...
J..- A.L..aj
.. Gt.,8 cf- CCU. mac' 4LA cn^. 41-k ' y ou_c3�-
INSPECTOR: - L. C.-a__ .
DATE: 4 1x-2. '7- `f
CITY OF TUKVVILA
Dept. of Community Development - Bullding Division
Phone: (206) 431 -3670
INSPECTION RECORD
oc.tvt «rM 'at te,'lra 41=iStitvAil s:$wz.:°
6300 Southcenter Boulevard -- #100
Tukwlla Washington 98188
extend: footing below the 'frost line per :UBC Section: 2907 ( a
Frost ' line 12"
All stairs are required to have guardrail and handrails' per,
UBCSec 3306.
floor plan
decking
pressure
hardware
roof panels
roof support frame
hot tub and deck plan
deck plan
roof line
roof and deck joists
deck board
mike pittman
pvc roof
deck joists
CITY OF TUKWILA
6200 SOUTIICENTER BOULEVARD, TUKWILA, WASHINGTON 98188
PHONE 11 (206) 433.1800
Cary L. VanDusen, Mayor
3.
Validity of Permit. The issuance of a permit or approval
of plans, specifications and computations. shall not be .
construed to be a permit for, or an ` approval of, ; any
violation of any of the provisions of this code or of any
other ordinance of the jurisdiction. No permit presuming
to give authority or violate or cancel the provisions of
this code shall be valid.
Plan Check #91 -320: Reid, Barry & Becky
5103 S 164 St
THE FOLLOWING COMMENTS APPLY TO AND BECOME PART OF THE APPROVED
PLANS UNDER TUKWILA BUILDING PERMIT NUMBER BECOME/ C)
1... No changes will be made to the plans unless approved by
the Architect and the Tukwila Building Division.
2 All permits, inspection records, and approved plans shall
be posted at the job site prior to the start of any
construction.
All construction to be done in conformance with approved
plans and requirements . of the Uniform Building Code (1988
Edition), Uniform Mechanical Code (1988 Edition),
Washington State Energy. Code (1991 Edition), and
Washington State Regulations for Barrier Free Facility
(1989 Edition) .
4 All wood to remain in placed concrete shall be treated
wood.
"X"
REQUIRED INSPECTIONS
PHONE
APPROVED
INITIALS
CORRECTION NOTICE ISSUED
g
1 Footings
431 -3670
2 Foundation
431 -3670
3 Slab and/or Slab Insulation
431 -3670
4 Shear Wall Nailing
431 -3670
5 Roof Sheathing Nailing
431 -3670
6 Masonry Chimney
431 -3670
x
7 Framing
431 -3670
8 Insulation
431 -3670
9 Suspended Ceiling
431 -3670
10 Wall Board Fastening
431 -3670
11
12
13
14 FIRE FINAL insp:
575 -4407
15 PLANNING FINAL
431 -3670
16 PUBLIC WORKS FINAL
431 -3670
x
17 BUILDING FINAL
431 -3670
SITE ADDRESS:
5103 S 164 St
CITY OF TUKWILA
Department of Community Development - Permit Center
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
BUILDIICG PERMIT
INSPECTION RECORD
(Post with Building Permit in conspicuous place)
SUITE NO.:
BUILDING
PERMIT NO. (113O
DATE ISSUED:
PROJECT:
Reid, Barry & Becky
CALL FOR INSPECTIONS AT LEAST 24 HOURS iN ADVANCE
(INSPECTOR COMMENT SECTION ON REVERSE)
INSPECTION .PROCEDURES AND REQUIREMENTS
All approved plans and permits shall be maintained available on the site in the same location.
1. FOOTING - When survey stakes and forms are set and rebar is tied in place.
2. FOUNDATION - When forms and rebar are in place.
3. SLAB - If structural slab or if underslab insulation is required.
4. SHEARWALL NAILING - Prior to cover.
5. ROOF SHEATHING NAILING - Prior to cover.
6. MASONRY CHIMNEY - Approximately midpoint.
7. FRAMING - After rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place.
8. INSULATION - After framing approval, but before installation of wallboard. Baffles must be installed to keep attic
ventilation points clear.
9. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing.
10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G).
11.
12.
13.
14. FINAL FIRE INSPECTION - Contact Fire Department for their requirements.
15. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements.
16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements.
17. FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete.
OTHER AGENCIES:
Plumbing (including gas piping) — King County Health Department — 296 -4732
Electrical — Washington State Department of Labor and Industries — 277 -7272
A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by
contacting the Department of Community Development, Building Division at 431 -3670. Although not
required, a meeting of this type can often eliminate problems, delays and misunderstandings as the
project progresses. mow)
X
1. Footings
2. Foundation
3. Slab /Slab Insulation
4. Shear Wall Nailing
5. Roof Sheathing Nailing
6. Masonry Chimney
X 7.
Framing
8. Insulation
9. Suspended Ceiling
10. Wall Board Fastening
11.
12.
13.
14. Fire Final
15. Planning Final
16. Public Works Final
y
17. Building Final
PAN REVIEW COMMEic rs
Plan Check No.: 6 ( 1 `32- ex'' 13"/VRk'ZL
REQUIRED INSPECTIONS
Project:
No changes will be made to the plans unless approved by the Architect
and the Tukwila Building Division.
2. Plumbing permit shall be obtained through the King County Health
Department and plumbing will be inspected by that agency, including all
gas piping (296- 4722).
3. Electrical permit shall be obtained through the Washington State Division
of Labor and Industries, and all electrical work will be inspected by that
agency (277- 7272).
4. Ail mechanical work shall be under separate permit through the City of
Tukwila.
All permits, inspection records, and approved plans shall be posted at the
job site prior to the start of any construction.
6. When special inspection is required, either the owner, architect or
engineer shall notify the Tukwila Building Division of appointment of the
inspection agencies prior to the first building inspection. Copies of all
special inspection reports shall be submitted to the Building Division in a
timely manner. Reports shall contain address, project name and permit
number of the project being inspected.
7. All structural concrete to be special inspected (Sec. 306, UBC).
8. All structural welding to be done by W.A.B.O. certified welder and special
inspected (Sec. 306, UBC).
9. All high- strength bolting to be special inspected (Sec. 306, UBC).
10. Any new ceiling grid and light fixture installation is required to meet lateral
bracing requirements for Seismic Zone 3.
11. Partition walls attached to ceiling grid must be laterally braced if over eight
(8) feet in length.
12. Readily accessible access to roof mounted equipment is required.
13. Engineered truss drawings and calculations shall be on site and available
to the building inspector for inspection purposes. Documents shall bear
the seal and signature of a Washington State Professional Engineer.
14. Any exposed insulations backing material to have Flame Spread Rating of
25 or Tess, and material shall bear identification showing the fire
performance rating thereof.
15. Subgrade preparation including drainage, excavation, compaction, and
fill requirements shall conform strictly with recommendations given in the
soils report prior to final inspection (see attached procedure).
16. A statement from the roofing contractor verifying fire retardancy of roof
will be required prior to final inspection (see attached procedure).
X All construction to be done in conformance with approved plans and
requirements of the Uniform Building Code (1988 Edition), Uniform
Mechanical Code (1988 Edition), Washington State Energy Code (1990
Edition), and Washington State Regulations for Barrier Free Facility (1990
Edition).
18. All food preparation establishments must have King County Health
Department sign -off prior to opening or doing any food processing.
Arrangements for final Health Department inspection should be made by
calling King County Health Department, 296 -4787, at least three working
days prior to desired inspection date. On work requiring Health
Department approval, it is the contractor's responsibility to have a set of
plans approved by that agency on the job site.
19. Fire retardant treated wood shall have a flame spread of not over 25. All
materials shall bear identification showing the fire performance rating
thereof. Such identification shall be issued by an approved agency
having a service for inspection at the factory.
20. Notify the City of Tukwila Building Division prior to placing any concrete.
This procedure is in addition to any requirements for special inspection.
21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8,
shall be special inspected.
All wood to remain in placed concrete shall be treated wood.
23. All structural masonry shall be special inspected per U.B.C. Section 306
(a) 7.
Validity of Permit. The issuance of a permit or approval of plans,
specifications and computations shall not be construed to be a permit for,
or an approval of, any violation of any of the provisions of this code or of
any other ordinance of the Jurisdiction. No permit presuming to give
authority or violate or cancel the provisions of this code shall be valid.
25. A Certificate of Occupancy will be required for this permit.
pleasant heights
250 Arctic Building 700 Third Ave.
Seattle, WA 98104 (206) 625 -1952
This sketch does not purport to show all highways, roads or easements affecting said property. No liability is assumed for variations in dimensions
and location, and is not based upon a survey of the property described in this order. It is furnished without charge, solely for the purpose of assisting
in locating the described premises The Company assumes no liability for inaccuracies therein.
* * REVISION SUBMITTAL * *
DATE C e / l e/9/
PROJECT NAME e.
ADDRESS /0
CONTACT PERSON e *
0 ifs
ARCHITECT OR ENGINEER y
PERMIT NUMBER (If previously issued)
PLAN CHECK NUMBER qf - 320
TYPE OF REVISION: R.4/44....9,dy
r 4 e r/0/ „ok
SHEET NUMBER(S) (. eey-L)
"Cloud" or highlight all areas of revisions and date revisions.
SUBMITTED TO: ..€-'1/(
CITY OF TUKWILA
6300 SOUTHCENTER BOULEVARD
TUKVVILA, WA 98188
'ea PHONE - S 20
CITY OF TUKWILA
6200 SOUTIICENTER BOULEVARD, TUKWILA, WASHINGTON 98188
August 8, 1991
Becky Reid
5103 S. 164th St.
Tukwila, WA 98188
RE: Hot Tub Deck
Plan check number 91 -320
Dear Mrs. Reid:
After an initial review of subject project, it has been
determined that additional information typical to plans in
accordance with UBC Section 302(d) be submitted to complete the
plan review. Please address the following comments.
1. Provide details to show footing size and depth extending below
the frost line per UBC Section 2907(a). Frost line depth 12 ".
2. Indicate on the plans the proposed roof line overhang. Set
backs to the property line must be measured from the greatest
projection, (the deck edge or the eaves).
3. Provide a roof framing plan that will show-the size of framing
members, direction of rafters, spacing, etc.
4. Cross section must show the slope of the roof and identify-the
elements of the framing materials, (4X4, 2X6, roof materials,
etc). Show how the horizontal framing is bearing on the
vertical supports. Note the submitted cross section at the
left end of the drawing shows a vertical roof support having
direct baring on the deck and not to the ground.
5. On the cross section show how the proposed deck and roof are
tied to the existing house.
6. All stairs are required to have guardrail and handrails per
UBC Sec. 3306.
7. Provide lateral shear bracing for deck and roof per UBC 2303.
8. Proposed 2X6 deck joist 4 ft. on center is .insufficient to
support 2X4 deck boards.
PHONE b (206) 4331800
Cary L. VanDusen, Mayor
activity log