HomeMy WebLinkAboutPermit 6731 - Mills Residence - Water Damage RepairPermit 6731 - Mills Repair
91-342 14250 58th avenue south repair
.
- "P • • .: V -N UB DI I• year) 1988
SETBACKS: N- S- E-
W-
FIRE PROTECTION:
°Sprinklers 0 Detectors [ Wq
UTILITY PERMITS REQUIRED? °Yes °x Na
(through
Public Wo rks)
ZONING:
BAR /LAND USE CONDITIONS? ° Yes
°X No
CONDITIONS other than those noted on or attached to •ermit/•Ians
- . i
(POST WITH INSPECTION CARD AND PLANS
IN A CONSPICUOUS LOCATION)
CITY OF TUKWILA
Dept. of Community Development - Building Division DESCRIPTION. RCPT # • DATE
6300 Southcenter Boulevard, Tukwila WA 98188 BUILDING.PERMIT FEE: 117.00 I
(206) 431 -3670 PLAN CHECK.FEE 76.00 ]X12 8 13 91.
BUILDINGSURCHARGE
BUILDING
PERMIT NO.
DATE ISSUED:
PROJECT INFORMATION
SITE ADDRESS
PROJECTNAME/TENANT Mills, Bill & Sandy
TYPE OF (J New Building U Addition Li Tenant Improvement (commercial) U Demolition (building) ❑ Grading/Fill
WORK: 0 Rack Storage 0 Reroof 0 Remodel (residential) CIO Other: Repair
DESCRIBE WORK TO BE DONE:
Remove and replace plaster walls and ceilings throughout, install new
insulation, and vent attic space due to water damage.
P P ER Bill and Sandy Mills
ADDRESS
CONTRACTOR
ADDRESS
WA. ST. CONTRACTOR'S LICENSE # RBLAKC148J1
ARCHITECT
ADDRESS
CODE: COMPLIANCE
000.
LOAD
USE ..�.;`
FLOOR SQUARE OCC. SQUARE OCC. SQUARE
FEET LOAD FEET LOAD FEET
...............
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC. TOTAL
LOAD SQUARE FEET
TOTAL
OCC. LOAD
APPROVED FOR
ISSUANCE BY:
Lic
13'�ll
14250 58 Av S
14250 58th Avenue South, Tukwila, WA
R. Blakley Construction
3268 38th Avenue S.W., Seattle, WA
BUILDIN PERMIT
SUITE #
OTI IER
TOTAL - 17.50
PLAN CHECK NO.:
91 -342
BUILDING
OFFICIAL
VALUE OF CONSTRUCTIO - $ 10, 000.00
ASSESSOR ACCOUNT # . -3365'90- 1115 -0
DATE:
PHONE
PHONE
EXP. DATE 3 /92
PHONE
J3
31 -90001
ZIP 98168
32-7917
ZIP 98126
ZIP
I hereby certify that I have read and examined ills permit and know the same to be true and correct. All provisions of lav
and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit
does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating
construction or the performance of work. t am authorized to sign for and obtain this building permit.
SIGNATURE: WWI" � . ..i. r' i DATE: 9/
PRINT NAME: ? ( \ Chief/4,,/ -� / • k e /t, 1 COMPANY: age �p,. -f�
is permit shall become null and void if th Ork is not commenced within 180 •days from the date c
issuance, or if the work is suspended or abandoned for a period of 180 days from the last > inspect'
ion,
CERTIFICATE OF DATE ISSUED:
OCCUPANCY NO. LI\
/a Ai
PERMIT NO.
CONTACTED
DATE READY
DATE NOTIFIED
BY:
(init.)
PERMIT EXPIRES
2nd NOTIFICATION
3RD NOTIFICATION
BY:
(snit.)
BY:
(init.)
AMOUNT OWING
r a 1 '
I ,��,��,�
PLAN CHECK
NUMBER
INSTRUCTIONS TO STAFF
• Contacts with applicants or requests for information should be summarized in writing by staff so that
any time the status of the project may be ascertained.
• Plan corrections shall be completed and approved prior to sending on to the next department.
• Any conditions or requirements for the permit shall be noted on the plans or summarized concisely
in the form of a formal letter or memo, which will be attached to the permit.
• Please fill out your section of the tracking chart completely. Where information requested is not
applicable, so note by using "N /A ".
BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION
(to be filled out by Plan Checker)
FLCOiR ><" SQUARE OCC. SQUARE OCC. SQUARE OCC. SQUARE OCC.
FEET LOAD FEET LOAD FEET LOAD FEET LOAD
TOTAL:
SQUARE OCC. TOTAL
FEET LOAD SQUARE FEET
TOTAL
OCC, LOAD
DEPARTMENTAL REVIEW
"X" in box indicates which departments need to review the project.
Cg BUILDING -
initial review
O FIRE
...................
ARTM N7
O PLANNING
O PUBLIC
WORKS
O OTHER
BUILDING -
final review
f
S
ITE ADDRESS SUITE NO.
I�Ia6 a Sg s
13--Q1
REVIEW COMPLETED
CONSULTANT: Date Sent -
(ROUTED)
FIRE PROTECTION: Sprinklers
INIT:
INIT:
6s1
INIT:
BUILDING (7ERMIT
APPLICATION TRACKING
FIRE DEPT. LETTER DATED:
ZONING:
REFERENCE FILE NOS.:
MINIMUM SETBACKS:
UTILITY PERMITS REQUIRED?
PUBLIC WORKS LETTER DATED:
INIT:
p 1 , 3 ( TYPE OF CONSTRUCTION:
INIT: LAte
UII 01+41
N-
Date Approved -
INSPECTOR:
BAR/LAND USE CONDITIONS?
UBC EDITION (year):
( ct
N/A
SITE ADDRESS SUITE #
/ G 6f ,
VALUE OF CONSTRUCTION - $
I0, 000
P OJECT NAME/TENANT
, �aGc g'; Y OiiJLs
ASSESSOR ACCOUNT #
_ � 4� 1D._ 1116 -U
(commercial) Demolition (building)
0 Other 2
TYPE OF U New Building U Addition U Tenant Improvement
WORK: 0 Rack Storage 0 Reroof 0 Remodel (residential)
DESCRIBE WORK TO BE DONE: 1. _ ! ter' 4
u c Ksiliic fi� Tcr` Ay" te,s 1 (i9J //.t 5 A Mogifit.d 40 ffS 0/_44,c 7.w.sArtG
/`OUS44//47 A) , ..vvmf f(G 1,0A44'.t, CwAC'
BUILDING USE (office, warehouse, etc.)
NATURE OF BUSINESS:
WILL THERE BE A CHANGE IN USE? N No 0 Yes If Yes, new building requirements may need to be met. Please explain:
SQUARE FOOTAGE - Building. 3Doa 0 Tenant Space: Area of Constructiomi -d4l, ik
WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING?
1. No 0 Yes IF YES, EXPLAIN:
PROPERTY OWNER 15;44 oa44 /'S
PHONE v3 j_faAa
i
ADDRESS /4/r d 5-641 Se,
ZIP cg /4
CONTRACTOR A 1 19 uAi' ti C ii Ann
PHONE 9 _ X91'7
ADDRESS 3426 �� � , Srw P.¢ !�
� �( �o
ZIP9i %
WA. ST. CONTRACTOR'S LICENSE # 4601a vex
EXP. DATE 3_9
PHONE
ARCHITECT N h4.
ADDRESS
ZIP
CITY OF TUKWILA
Department of Community Development - Building Division
6300 Southcenter Boulevard, Tukwila WA 98188 --
(206) 431-3670 DESCRIPTION
BUILDING PERMIT FEE
PLAN CHECK PLAN CHECK FEE::;
NUMBER �� j BUILDINGSURCHARGE
EREBY CERTIFY :THAT:/ : HAVE READ AND :`
TRUE AND: :CORRECT, 'AND I AM :AUTHORIZED ;T.O APPLY'FOR THI
BUILDING OWNER
OR
AUTHORIZED
AGENT
CONTACT PERSON
SIGNATURE i
DATE APPLICATION ACCEPTED
MINT NAME -R1 AIot
ADDRESS 3 g 3.9,41/15, s,.w ,
CITY/ZIPs9,e4ke Feio7G
PHONE (73
APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill out the
application completely and follow the plan submittal checklist on the reverse side of this form. Handouts are available at
the Building counter which provide more detailed information on application and plan submittal requirements.
Application and plans must be complete in order to be accepted for plan review.
VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of
Community Development prior to application submittal. Contact the Permit Coordinator at 431 -3670 prior to submitting
application. In all cases, a valuation amount should be entered by the applicant. This figure will be reviewed and is
subject to possible revision by the Building Division to comply with current fee schedules.
BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or contractor
licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this
permit application and obtain the permit will be required as part of this submittal.
EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall
expire by limitations. The building official may extend the time for action by the applicant for a period not exceeding 180
days upon written request by the applicant as defined in Section 304(d) of the Uniform Building Code (current edition).
No application shall be extended more than once.
1f you have any questions about our process or plan submittal requirements, please
contact the Department of Community Development Building Division at 431 -3670. '
BUILDU' PERMIT
APPLICATION
;<,AMOUNT
N'1. DC
RCPT :.#
DATE APPLICATION EXPIRES
:KN
W:
E
S AM
DATE fir' /1a�`l l
PHONE 93� ?9V7
03/1691
7 A 6
SUBMITTAL CHECKLIST
COMMERCIAL
•••••••••••■•
NEW COMMERCIAL BUILDINGS/ADDITION . .:..
ri Completed building permit application (one for each structure)
Assossor Account NUmber •:•-• ••••• • •
Two sots (2) of thei toliowing
Spocificatons
enginoer
•
. .
Solis report stamped by a Washington State licensed engineer
• [Topegraphical
• • •••••.-... • •••. ,
ri:EnergY:COICuletiOni storneedby.a Washington
••••
• WOrking drawings;it,niped by a Washington State Iicensed
• architect, wItich include: •
: ••• . • • . • : " . •.•
Mochanicai drawings
Elevations
Landseape Plan
Six (6) sets ot civil drawings
lvdTE::::"ee util,ty pormlt appl,cation and ahadk/ist. for specifio utility
RACK STORAGE
subniitol!
. ........................... . . .
• ... .
,"
1:Completed btihding permit appijcation
Two (2) sots of plans which Include
Building floor plan showing
• ' '
::•
• •• •••
' . . .
••••• apace where , racks will be :located
Exit doors
. .
. . .
DiMenslOns.al
.•,.• • . • .
l'enartt.SPacelleor'Plan ........ rack storage and
. • .. . • • . . . .
of racks (height,:width and length) ;.alsIpa
and exit ways on plari
StrUCturel, calculatlon by a Washington State licensed
engineer rack storage:8':and .. •
. .
RESIDENTIAL. —
NEW SINGLE-FAMILY DWELLINGS/ADDMONS
ri Completed building permit application (one for each structure)
. ri Legal description : • .:. • ..• •
Assessor Account Numbor
Two sets (2) of working drawings whlch include
Sit •• •
9P an•-• eqh plan show closest. 1
Foundation pian ..:. include access to
Floor plan wfdth and !engin of
Root plan
atullth cross socflon
.
•::■•StrUctUral
•.•:::
. . .
COMkgrilcii I. T4iANT IMPROVEMENTS :•••:• : • .
I Completed building pormit aPplcation (one for eaOh.striictUre or ::••
Two (2) sets of construction ptans which Includo
[1 Sito plan
• Existing and proposed parking
: •
Tenant tocation
Usa ot adjacent (common waft) tenant
F1 .•••• .......... ten . . .
Ftoor Overall
. .
• Ext doors egress patterns
Construction details
Cross soctions showing wall construction and method ot
•••• • •-••••••••••••••......... '• •
Structural calculations stamped by a Wash
engineer may be required if structural work fs to
NOTE If BO. purity work Is 1o.40:
application andplans
::.NOTE A certification lotter is roquirod prior 10 final inspection and sign
Otto! the permit •
• • . ,•:•••:•:•:•• . . . • .....
SATELLITE
[_ Comploted liding permit appllcation
' Assossor Account Number
Two (2) sets ot plans which Inolude
‘.,
. et o :
Structural calculahons stamped by a Washington State kcensed
• • angin4 . :r : MaYi . l?ereci
RESIDENTIAL REMODELS
••• • ••••••
I:Assessor :ACCoUnt. Nther
Two (2) sets ot worklng drawings, whioh include
Site plari
• •••••••:•-:: . .
. • . •
• ::::
Floor plan
Roof plan
Buiiding cross section
and plans must bo submi:tod
•
• •••• •
. • . ...
• .. . . .
.Washing ten State
ri:Conipleted utility permit application • • •••• •••:-
. .: • • Completed building permit appliCatien" one for each
. „ .
••• " : • . : • • • • •.. , . • • •• •• • „. • .•.
• • • •
• • • • • • ", • • . • • . •„ . • . • •• • • • •
Six (6) sots of sito plans showing utilities ;
Asses Account Numbor
• • • .
157j' S
a a l
lype of In,specton:
> L ---)
Sp
al nstructions: e
-3 '.9,0 F A
/1 ,
1
Date Wanted: 0 .__
/41
1./ "IN ,
—,..7 i
am.
.
m.
R uester:
phone No.:
,trt,rx,,v'sz-1 7f't: I : r4?:•trt t 7r.,':!.7
4
INSPECTION:. RECORD
: Retain a Oppywith permlf
o. . • • • • • . •
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188
Approved per applicable codes.
COMMENTS:
n
irg
0 Corrections required prior to approval.
(206) 431-3670'
Date:
• $30,00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at
6300 Southcenter Blvd.', Suite 100. Call to schedule reinspection.
PROJECT: ►V\ t \ S
PERMIT NO. 03 1
DATE CALLED: ?- 30-- q/
SITE ADDRESS: )43,'30 AA) 5,
TYPE OF INSPECTION: 14 A ,
t
DATE WANTED: q_ Q 2 --.GJ
SPECIAL INSTRUCTIONS:
REQUESTER:
PHONE NO.: 2j , -qo 0 0
INSPECTION RESULTS /COMMENTS:
d CeNrst-r.
3 -7, 4VC- 1 -1
t
INSPECTOR: "' DATE: . ' 3- i 1
:44.; .'r...W.VX.N:;c<rn , w.... j .. :.au..........,..-.......... ........_......_..,.... .....,,..,..... %. w...
CITY OF TUKWILA
Dept. of Community Development - Building Division
Phone: (206) 431 -3670
INSPECTION RECORD
6300 Southcenter Boulevard — #100
Tukwlla Washington 98188
PROJECT: M(1 i 5 , 5 I l
S
i
PERMIT NO.
DATE CALLED:
LQ_ , 1
q j3
SITE ADDRESS: aS S Psi
TYPE OF INSPECTION: A1 Iat 1prl
DATE WANTED:
._
S-- I4 (i -- 1 a.m.
p .m.
SPECIAL INSTRUCTIONS:
REQUESTER:
fi , Ell akw
PHONE NO.:
C - •
INSPECTION RESULTS /COMMENTS:
U .(r- -c _ �¢ e .� ........tic
m... -A
( "..._c
f- - G_
'
INSPECTOR: 1.. -I.---
DATE:
.`- f Li ` j 1
CITY OF TUKWILA
Dept. of Community Development - Building Division
Phone: (206) 431 -3670
T.r
INSPECTION RECORD
6300 Southcenter Boulevard —,100
Tukwila Washington 98188
rafter spacing
floor joists
understand that the Ptan Chef
violation
ect to errors and omiss Q[i
plans does not authorize ,i d r4�
�topted code Or 0 tar15 >gr3w:
if actor's copy of approved
CITY OF TUKWILA
6200 SOUTIIC /INTER BOULEVARD, TUKIVILA, WASHINGTON 98188
Plan Check #91 -342: Mills, Bill & Sandy
14250 58 Av S
P110NE # (206) 4,731800 Gary L. VanDusen, Mayor
THE FOLLOWING COMMENTS APPLY TO AND BECOME PART OF THE APPROVED
PLANS UNDER TUKWILA BUILDING PERMIT NUMBER or i3) .
1. No changes will be made to the plans unless approved by
the Architect and the Tukwila Building Division.
2. Plumbing permit shall be obtained through the King County
Health Department and plumbing will be inspected by that
agency, including all gas piping (296 - 4732).
3. Electrical permit shall be obtained through the
Washington State Division of Labor and Industries and all
electrical work will be inspected by that agency (872-
6363).
4. All mechanical work shall be under separate permit
through the City of Tukwila.
5. All permits, inspection records, and approved plans shall
be posted at the job site prior to the start of any
construction.
6. Any exposed insulations backing material to have Flame
Spread Rating of 25 or less, and material shall bear
identification showing the fire performance rating
thereof.
7. All construction to be done in conformance with approved
plans and requirements of the Uniform Building Code (1988
Edition), Uniform Mechanical Code (1988 Edition), and
Washington State Energy Code (1991 Edition).
8. Validity of Permit. The issuance of a permit or approval
of plans, specifications and computations shall not be
construed to be a permit for, or an approval of, any
violation of any of the provisions of this code or of any
other ordinance of the jurisdiction. No permit presuming
to give authority or violate or cancel the provisions of
this code shall be valid.
"X"
REQUIRED INSPECTIONS
PHONE
DATE
APPROVED
INSPECT.
INITIALS
DATE(S)
CORRECTION NOTICE ISSUED
1 Footings
431 -3670
2 Foundation
431 -3670
3 Slab and/or Slab Insulation
431 -3670
4 Shear Wall Nailing
431 -3670
5 Roof Sheathing Nailing
431 -3670
1
6 Masonry Chimney
431 -3670
x
7 Framing
431 -3670
8 insulation
431 -3670
9 Suspended Ceiling
431 -3670
x
10 Wall Board Fastening
431 -3670
11
12
13
14 FIRE FINAL Insp:
575 -4407
15 PLANNING FINAL
431 -3670
16 PUBLIC WORKS FINAL
431 -3670
x
17 BUILDING FINAL
431 -3670
CITY OF TUKWILA
Department of Community Development - Permit Center
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
SITE ADDRESS:
14250 58 Av S
BUILDII(3 PERMIT
INSPECTION RECORD
(Post with Building Permit In conspicuous place)
SUITE NO.:
BUILDING
PERMIT NO. LO
DATE ISSUED:
PROJECT:
Mills, Bill & Sandy
CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE'
c 13 -T
(INSPECTOR COMMENT SECTION ON REVERSE)
INSPECTION PROCEDURES AND REQUIREMENTS
All approved plans and permits shall be maintained available on the site in the same location.
1. FOOTING - When survey stakes and forms are set and rebar is tied in place.
2. FOUNDATION - When forms and rebar are in place.
3. SLAB - If structural slab or if underslab insulation is required.
4. SHEARWALL NAILING - Prior to cover.
5. ROOF SHEATHING NAILING - Prior to cover.
6. MASONRY CHIMNEY - Approximately midpoint.
7. FRAMING - After rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place.
8. INSULATION - After framing approval, but before installation of wallboard. Baffles must be installed to keep attic
ventilation points clear.
9, SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing.
10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G).
11.
12.
13.
14. FINAL FIRE INSPECTION - Contact Fire Department for their requirements.
15. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements.
16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements.
17. FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete.
OTHER AGENCIES:
Plumbing (including gas piping) — King County Health Department — 296 -4732
Electrical — Washington State Department of Labor and Industries — 277 -7272
A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by
contacting the Department of Community Development, Building Division at 431 -3670. Although not
required, a meeting of this type can often eliminate problems, delays and misunderstandings as the
project progresses. omso
F AN REVIEW COMMEINICS
Plan Check No.:_el 3 Q Project: X11 1151 j 1 t l
No changes will be made to the plans unless approved by the Architect
and the Tukwila Building Division.
REQUIRED INSPECTIONS
0 All permits, inspection records, and approved plans shall be posted at the
job site prior to the start of any construction.
6. When special inspection is required, either the owner, architect or
engineer shall notify the Tukwila Building Division of appointment of the
inspection agencies prior to the first building inspection. Copies of all
special inspection reports shall be submitted to the Building Division in a
timely manner. Reports shall contain address, project name and permit
number of the project being inspected.
7. All structural concrete to be special inspected (Sec. 306, UBC).
8. All structural welding to be done by W.A.B.O. certified welder and special
inspected (Sec. 306, UBC).
9. All high- strength bolting to be special inspected (Sec. 306, UBC).
10. Any new ceiling grid and light fixture installation is required to meet lateral
bracing requirements for Seismic Zone 3.
11. Partition walls attached to ceiling grid must be laterally braced if over eight
(8) feet in length.
12. Readily accessible access to roof mounted equipment is required.
13. Engineered truss drawings and calculations shall be on site and available
to the building inspector for inspection purposes. Documents shall bear
the seal and signature of a Washington State Professional Engineer.
14. Any exposed insulations backing material to have Flame Spread Rating of
25 or less, and material shall bear identification showing the fire
performance rating thereof.
15. Subgrade preparation including drainage, excavation, compaction, and
fill requirements shall conform strictly with recommendations given in the
soils report prior to final inspection (see attached procedure).
16. A statement from the roofing contractor verifying fire retardancy of roof
will be required prior to final inspection (see attached procedure).
All construction to be done in conformance with approved plans and
requirements of the Uniform Building Code (1988 Edition), Uniform
Mechanical Code (1988 Edition), Washington State Energy Code (1990
getit.loS.
18. All food preparation establishments must have King County Health
Department sign -off prior to opening or doing any food processing.
Arrangements for final Health Department inspection should be made by
calling King County Health Department, 296 -4787, at least three working
days prior to desired inspection date. On work requiring Health
Department approval, it is the contractor's responsibility to have a set of
plans approved by that agency on the job site.
19. Fire retardant treated wood shall have a flame spread of not over 25. All
materials shall bear identification showing the fire performance rating
thereof. Such identification shall be issued by an approved agency
having a service for inspection at the factory.
20. Notify the City of Tukwila Building Division prior to placing any concrete.
This procedure is in addition to any requirements for special inspection.
21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8,
shall be special inspected.
22. All wood to remain In placed concrete shall be treated wood.
23. All structural masonry shall be special inspected per U.B.C. Section 306
(a) 7.
Validity of Permit. The issuance of a permit or approval of plans,
specifications and computations shall not be construed to be a permit for,
or an approval of, any violation of any of the provisions of this code or of
any other ordinance of the jurisdiction. No permit presuming to give
authority or violate or cancel the provisions of this code shall be valid.
25. A Certificate of Occupancy will be required for this permit.
Plumbing permit shall be obtained through the King County Health
Department and plumbing will be inspected by that agency, including all
gas piping (296 - 4722).
Electrical permit shall be obtained through the Washington State Division
of Labor and Industries, and all electrical work will be Inspected by that
agency (277- 7272).
All mechanical work shall be under separate permit through the City of
Tukwila.
•.
1. Footings
2. Foundation
3. Slab /Slab Insulation
4. Shear Wall Nailing
5. Roof Sheathing Nailing
6. Masonry Chimney
7. Framing
x
8. Insulation
9. Suspended Ceiling
10. Wall Board Fastening
11.
12.
13.
14. Fire Final
15. Planning Final
16. Public Works Final
X
17. Building Final
F AN REVIEW COMMEINICS
Plan Check No.:_el 3 Q Project: X11 1151 j 1 t l
No changes will be made to the plans unless approved by the Architect
and the Tukwila Building Division.
REQUIRED INSPECTIONS
0 All permits, inspection records, and approved plans shall be posted at the
job site prior to the start of any construction.
6. When special inspection is required, either the owner, architect or
engineer shall notify the Tukwila Building Division of appointment of the
inspection agencies prior to the first building inspection. Copies of all
special inspection reports shall be submitted to the Building Division in a
timely manner. Reports shall contain address, project name and permit
number of the project being inspected.
7. All structural concrete to be special inspected (Sec. 306, UBC).
8. All structural welding to be done by W.A.B.O. certified welder and special
inspected (Sec. 306, UBC).
9. All high- strength bolting to be special inspected (Sec. 306, UBC).
10. Any new ceiling grid and light fixture installation is required to meet lateral
bracing requirements for Seismic Zone 3.
11. Partition walls attached to ceiling grid must be laterally braced if over eight
(8) feet in length.
12. Readily accessible access to roof mounted equipment is required.
13. Engineered truss drawings and calculations shall be on site and available
to the building inspector for inspection purposes. Documents shall bear
the seal and signature of a Washington State Professional Engineer.
14. Any exposed insulations backing material to have Flame Spread Rating of
25 or less, and material shall bear identification showing the fire
performance rating thereof.
15. Subgrade preparation including drainage, excavation, compaction, and
fill requirements shall conform strictly with recommendations given in the
soils report prior to final inspection (see attached procedure).
16. A statement from the roofing contractor verifying fire retardancy of roof
will be required prior to final inspection (see attached procedure).
All construction to be done in conformance with approved plans and
requirements of the Uniform Building Code (1988 Edition), Uniform
Mechanical Code (1988 Edition), Washington State Energy Code (1990
getit.loS.
18. All food preparation establishments must have King County Health
Department sign -off prior to opening or doing any food processing.
Arrangements for final Health Department inspection should be made by
calling King County Health Department, 296 -4787, at least three working
days prior to desired inspection date. On work requiring Health
Department approval, it is the contractor's responsibility to have a set of
plans approved by that agency on the job site.
19. Fire retardant treated wood shall have a flame spread of not over 25. All
materials shall bear identification showing the fire performance rating
thereof. Such identification shall be issued by an approved agency
having a service for inspection at the factory.
20. Notify the City of Tukwila Building Division prior to placing any concrete.
This procedure is in addition to any requirements for special inspection.
21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8,
shall be special inspected.
22. All wood to remain In placed concrete shall be treated wood.
23. All structural masonry shall be special inspected per U.B.C. Section 306
(a) 7.
Validity of Permit. The issuance of a permit or approval of plans,
specifications and computations shall not be construed to be a permit for,
or an approval of, any violation of any of the provisions of this code or of
any other ordinance of the jurisdiction. No permit presuming to give
authority or violate or cancel the provisions of this code shall be valid.
25. A Certificate of Occupancy will be required for this permit.
Plumbing permit shall be obtained through the King County Health
Department and plumbing will be inspected by that agency, including all
gas piping (296 - 4722).
Electrical permit shall be obtained through the Washington State Division
of Labor and Industries, and all electrical work will be Inspected by that
agency (277- 7272).
All mechanical work shall be under separate permit through the City of
Tukwila.
•.